Tender For Biennial Contract For Routine/ Scheduled/ Preventive/ Breakdown Maintenance Of Boiler Pressure Part And Non-Pressure Part Auxiliaries Including Coal Mills Of 1 X 500 Mw, Unit No. #5 At Sgtps, Mppgcl, Birsinghpur.
Tender Overview
Project Description
Tender for Biennial Contract For Routine/ Scheduled/ Preventive/ Breakdown Maintenance Of Boiler Pressure Part And Non-Pressure Part Auxiliaries Including Coal Mills Of 1 X 500 Mw, Unit No. #5 At Sgtps, Mppgcl, Birsinghpur.
BOQ
| Sl. No. | Item Description |
| 1 | Item Wise BoQ BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: SE(P&W),SGTPS, MPPGCL,Birsinghpur Name of Work: Biennial Contract for “Routine/ Scheduled/ Preventive/ Breakdown Maintenance of Boiler Pressure part and Non-Pressure part Auxiliaries including Coal Mills of 1 X 500 MW, Unit No. #5” at SGTPS, MPPGCL, Birsinghpur. Contract No: 2026_MPPGC_523325_1 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(DOMESTIC TENDERS - RATES ARE TO BE GIVEN IN RUPEES (INR) ONLY)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # TEXT TEXT NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER NUMBER TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Particulars of Work Work No Minimum workable rate for two year (In Rs.) for Job1 and Quantity for job 2 to job 224 Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Service Charge quoted by bidders on minimum workable rate for two year (In %) for Job1 and unit rate (In Rs.) for job 2 to job 224 SAC Code Applicable CGST(In %) Applicable SGST(In %) IGST Rate on Basic Rate and P&F Charges in percentage Applicable IGST(In %) CGST Rate on freight in percentage IGST Rate on freight in percentage CGST Rate on freight in percentage Packing & forwording charges inRs. Frieght upto Destination in Rs IGST Amount on Basic Rate and P&F Charges in Rs Total amount without taxes in Rs Applicable CGST(In Rs) Applicable SGST(In Rs) CGST Amount on freight charges in Rs Applicable IGST(In Rs) TotalUnit Rate in Rs TOTAL AMOUNT Without Taxescol (13) = (4) x (7) inRs. P Total Amount (IncludingTaxes)Rs. P TOTAL AMOUNTIn Words |
| 2 | ROUTINE/SCHEDULE/MINOR OUTAGE MAINTENANCE OF BOILER PRESSURE PART & NON PRESSURE PART & ITS AUXILIARIES \\"EXCLUDING COAL MILL AND COAL PIPE CIRCUIT\\" (The above works to be carried out through Minimum Manpower defined in the schedule) As per annexure-1 |
| 3 | PREVENTIVE/BREAKDOWN AND OTHER MAINTENANCE OF BOILER PRESSURE PART AND NON PRESSURE PART & ITS AUXILIARIES (The above works to be carried out on per Job basis with separate Manpower/resources) As per annexure-2 |
| 4 | CLEANING OF BOILER |
| 5 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM |
| 6 | CLEANING OF ECONOMISER HOPPER |
| 7 | CLEANING OF PENT HOUSE/CAT HOUSE/DEAD CHAMBER/WIND BOX |
| 8 | BOTTOM ASH HOPPER CLEANING |
| 9 | PREPARATION OF SCAFFOLDING |
| 10 | BOILER HORIZONTAL PASS (SCREEN TUBES, LTSH TERMINAL, RH/SH) |
| 11 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER LOWER BANK COILS & C-HEADER |
| 12 | PREPARATION OF SCAFFOLDING IN WIND BOX |
| 13 | PREPARATION OF SCAFFOLDING IN CAT HOUSE FOR FRONT/REAR S-PANEL BACKSIDE CHECKING |
| 14 | PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER AREA |
| 15 | ERECTION AND REMOVAL QUICK ERECT SCAFFOLDING OUTSIDE THE BOILER FOR MAINTENANCE WORK |
| 16 | PREPARATION AND OPERATION OF SKY CLIMBER IN FURNACE |
| 17 | INSPECTION |
| 18 | SERVICING OF SECONDARY AIR DAMPERS |
| 19 | DYE PENETRATION TEST (DP TEST) WITH KIT (1sq. Inch = 645 sq. mm) |
| 20 | TRANSPORTATION OF ASH, SCRAPS, DEBRIES AND OTHER WASTE MATERIALS (INCLUDING LOADING/UNLOADING) |
| 21 | SECTION B |
| 22 | ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP |
| 23 | RECTIFICATION, REPLACEMENT AND REFIXING OF PROTECTION SLEEVE (SHIELDING) IN VARIOUS AREAS OF BOILER TUBES |
| 24 | RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES |
| 25 | REPAIR & REFIXING OF PROTECTION PLATE OVER LTSH/ECO COIL BENDS |
| 26 | WELDING OF HP JOINTS OF BOILER TUBES |
| 27 | WATER WALL TUBES, SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC. |
| 28 | REPLACEMENT OF WW BURNER PANEL TUBES |
| 29 | STEAM COOLED WALL TUBES |
| 30 | DIVISIONAL SUPERHEATER TUBES |
| 31 | PLATEN SUPERHEATER TUBES |
| 32 | SUPERHEATER STEAM COOLED SPACER TUBES |
| 33 | PENDANT REHEATER FRONT & REAR |
| 34 | REHEATER CROSS OVER TUBES |
| 35 | REHEATER STEAM COOLED SPACER TUBES |
| 36 | LTSH TUBES |
| 37 | LTSH SUPPORT TUBES |
| 38 | ECONOMISER TUBES |
| 39 | ECONOMISER SUPPORT TUBES |
| 40 | ROOF TUBES |
| 41 | HEADER STUBS |
| 42 | HYDRASTEP TUBES |
| 43 | INSTRUMENT PIPINGS |
| 44 | WELDING & REPLACEMENT OF DRAIN & VENT JOINTS |
| 45 | WELDING & REPLACEMENT OF SAMPLING LINE |
| 46 | WELDING OF FINS |
| 47 | RE-ENFORCEMENT OF WELDED JOINTS |
| 48 | ALIGNMENT OF COILS/ TUBES |
| 49 | ALIGNMENT OF COILS OF DIVISIONAL SH PANEL |
| 50 | ALIGNMENT OF COILS OF PLATEN SUPERHEATERS |
| 51 | ALIGNMENT OF REHEATER COIL (FRONT/ REAR) |
| 52 | ALIGNMENT OF COIL OF LTSH (UPPER / LOWER) |
| 53 | ALIGNMENT OF COIL OF ECONOMISER (UPPER / MIDDLE / LOWER) |
| 54 | COMPLETE SERVICING OF HP/LP VALVES (EXCLUDING ACTUATOR): |
| 55 | 50 MM TO 100 MM |
| 56 | ABOVE 100 MM |
| 57 | REPLACEMENT OF HP/LP VALVES (WELDED TYPE) |
| 58 | 50 MM TO 100 MM |
| 59 | ABOVE 100 MM |
| 60 | SERVICING OF MAIN STEAM STOP VALVE |
| 61 | COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV) |
| 62 | BOILER DRUM SV |
| 63 | MAIN STEAM LINES SV |
| 64 | CRH LINES SV |
| 65 | HRH LINES SV/SOOT BLOWER LINE |
| 66 | ELECTROMATIC RELIEF VALVE AND PILOT VALVE |
| 67 | REPAIRING OF PENT HOUSE |
| 68 | REPAIR OF PENT HOUSE (WITHOUT STEEL) |
| 69 | REPAIRING OF PENT HOUSE (WITH STEEL) |
| 70 | REPAIRING OF WIND BOX |
| 71 | REPAIR OF WIND BOX (WITHOUT STEEL) |
| 72 | DISMANTLING OF STEEL STRUCTURES/INSTALLATION OF NEW PLATE |
| 73 | REPAIRING OF DEAD CHAMBER |
| 74 | REPAIR OF DEAD CHAMBER (WITHOUT STEEL) |
| 75 | DISMANTLING OF STEEL STRUCTURES/INSTALLATION OF NEW PLATE |
| 76 | REPAIRING OF CAT HOUSE |
| 77 | REPAIR OF CAT HOUSE(WITHOUT STEEL) |
| 78 | DISMANTELING OF STEEL STRUCTURES |
| 79 | PAINTING OF BOILER BASE STRUCTURE & ASSOCIATED AUXILIARIES |
| 80 | PAINTING OF SCAFFOLDING MATERIAL (WITH PU PAINT) |
| 81 | APPLICATION OF REFRACTORY |
| 82 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE A) |
| 83 | APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GRADE C/P) |
| 84 | BOTTOM ASH HOPPER AREA |
| 85 | BREAKING AND REMOVAL OF LUMPS OF CLINKER ACCUMULATED IN BOTTOM ASH HOPPER /COLLECTION, LIFTING,TRANSPORTATION AND CLEANING OF CLINKER SLAG NEAR BOTTOM ASH HOPPER |
| 86 | REPAIR AND RE-FIXING OF TROUGH SEAL PLATES |
| 87 | REPAIR AND RE-FIXING OF REFRACTORY COOLING PIPE |
| 88 | FIXING OF CORRUGATED GI SHEET |
| 89 | APPLICATION OF THERMAL INSULATION |
| 90 | BOILER AND DUCTS |
| 91 | STEAM AND WATER PIPING |
| 92 | ESP, AIR PREE HEATERS & HOPPERS |
| 93 | DISPOSAL OF RUBBISH THERMAL INSULATION |
| 94 | SERVICING OF FANS (ID, FD, PA FANS) |
| 95 | SERVICING OF I. D. FANS |
| 96 | INSPECTION & SERVICING OF FAN BEARING (RT-10 DODGE SLEEVE) / MOTOR BEARING |
| 97 | INTERNAL, INSPECTION AND CLEANING OF FANS |
| 98 | REMOVAL AND RE-FIXING OF CONES |
| 99 | SERVICING / REPAIR OF IGV FLAPS |
| 100 | ALIGNMENT OF FAN WITH MOTOR |
| 101 | REPLACEMENT OF FAN BEARING (RTL DODGE SLEEVE) |
| 102 | COMPLETE SERVICING OF INDUCED DRAFT FAN |
| 103 | SERVICING OF F.D. FANS |
| 104 | SERVICING OF BLADE BEARING ASSEMBLY |
| 105 | SERVICING/REPLACEMENT OF SERVO MOTOR |
| 106 | ALIGNMENT OF FAN WITH MOTOR |
| 107 | SERVICING /REPLACEMENT OF FAN BEARING |
| 108 | COMPLETE SERVICING OF FORCED DRAFT FAN |
| 109 | SERVICING OF P.A. FAN |
| 110 | SERVICING OF BLADE BEARING ASSEMBLY |
| 111 | SERVICING/REPLACEMENT OF SERVO MOTOR |
| 112 | ALIGNMENT OF FAN WITH MOTOR |
| 113 | SERVICING /REPLACEMENT OF FAN BEARING |
| 114 | COMPLETE OVERHAULING OF PRIMARY AIR FAN |
| 115 | CLEANING & SERVICING OF FD & PA FAN COMPONENTS |
| 116 | REMOVAL OF TOP HALF OF FAN CASING & OGV |
| 117 | CLEANING OF COMPLETE FAN INCLUDING BLADES/SILENCER |
| 118 | CLEANING OF LUBE OIL TANK & REPLACEMENT OF OIL |
| 119 | REPAIRING OF FAN HOUSING (UPPER/LOWER) |
| 120 | REPLACEMENT OF FAN HOUSING (UPPER/LOWER) |
| 121 | RELEVELLING, BLUE MATCHING OF MOTOR FOUNDATION PAD |
| 122 | OVERHAULING OF SEAL AIR FANS |
| 123 | SERVICING /REPLACEMENT OF FAN DE BEARING & COUPLING |
| 124 | SERVICING /REPLACEMENT OF FAN DISCHARGE VALVE |
| 125 | REPLACEMENT OF IMPELLER |
| 126 | ALIGNMENT OF FAN WITH MOTOR |
| 127 | WORK OF LDO & HFO PUMPS |
| 128 | COMPLETE SERVICING / REPLACEMENT OF HFO/ LDO PUMPS |
| 129 | COMPLETE SERVICING OF HFO HEATERS |
| 130 | COMPLETE SERVICING OF HFO RETURN OIL COOLER |
| 131 | WORK OF ROTARY AIR PRE-HEATER ASSEMBLY ( SAPH & PAPH) |
| 132 | SERVICING OF DRIVE GEARBOX |
| 133 | CE/HE RADIAL SEAL REPAIR/REPLACEMENT & SETTING |
| 134 | GUIDE BEARING/SUPPORT BEARING SERVICING |
| 135 | INSPECTION/REPLACEMENT OF OVER RUNNING CLUTCH OF APH GEARBOXES |
| 136 | LEVELING OF H.E./C.E. RADIAL SECTOR PLATE |
| 137 | LEVELING OF AXIAL SEAL PLATE |
| 138 | AXIAL SEAL REPAIR/REPLACEMENT & SETTING (C.E./H.E.) |
| 139 | BY PASS SEAL REPAIR/REPLACEMENT & SETTING (C.E./H.E.) |
| 140 | REPAIR/REPLACEMENT OF GUIDE BEARING AIR SEALING COVER ASSEMBLY |
| 141 | HYDROJET CLEANING OF SCAPH |
| 142 | REPLACEMENT/REPAIR OF STATIC SEAL ASSEMBLY (COLD / HOT END) |
| 143 | REPLACEMENT OF GUIDE BEARING |
| 144 | REPLACEMENT OF SUPPORT BEARING |
| 145 | CLEANING OF LUBE OIL BEARING HOUSING & REPLACEMENT OF OIL |
| 146 | REPAIRING AND PATCHING OF CENTRE SECTION |
| 147 | REPAIR OF SPOOL ASSEMBLY |
| 148 | ALIGNMENT OF DRIVE MOTORS, FLUID COUPLINGS & GEAR BOXES |
| 149 | OVERHAULING OF SOOT BLOWER GEAR-BOX |
| 150 | REPAIR/ REPLACEMENT OF LANCE TUBES & PROTECTION COVER / STEAM NOZZLES |
| 151 | CHECKING OF ROTOR RUN OUT |
| 152 | ROTOR LEVELING |
| 153 | REPAIRING OF AXIAL SEAL PLATE |
| 154 | REPAIRING OF NON METALLIC & METALLIC EXPANSION JOINTS |
| 155 | REPLACEMENT OF DAMAGED NMEJ |
| 156 | FABRICATION OF SUPPORT STRUCTURE FOR MOUNTING OF NMEJ/DIVERSION PLATE |
| 157 | REPAIRING/REPLACEMENT OF PROTECTION COVER OF NMEJ |
| 158 | REPAIRING OF METALLIC EXPANSION JOINTS |
| 159 | WORK OF DAMPERS & GATES |
| 160 | SEAL REPLACEMENT OF DAMPERS |
| 161 | SERVICING OF GUILLOTINE GATES |
| 162 | REPLACEMENT/REPAIRING OF ERODED / DAMAGED DAMPER FLAP |
| 163 | SEAL REPLACEMENT OF GUILLOTINE GATES |
| 164 | SERVICING OF MILL HOT/COLD PA DAMPERS |
| 165 | SERVICING OF FLUE GAS/AIR PATH DAMPERS |
| 166 | REMOVAL & REFITING OF ACTUATOR AND GB OF DAMPER/ GUILLOTINE GATE |
| 167 | HYDROJET CLEANING OF GATE/DAMPER |
| 168 | RAW COAL FEEDER AND BURNER ASSEMBLY |
| 169 | COMPLETE OVERHAULING OF GRAVIMETRIC RAW COAL FEEDER INCLUDING COC SYSTEM |
| 170 | REPLACEMENT OF COAL FEEDER CHUTES |
| 171 | COMPLETE COAL BURNER ASSEMBLY REPLACEMENT |
| 172 | REPAIR OF GUIDE PLATE OF COAL COMPARTMENT ASSEMBLY & AIR/OIL COMPARTMENT |
| 173 | REPAIR /REPLACEMENT OF GUIDE PIPES OF OIL BURNER/ SCANNERS/IGNITER |
| 174 | SERVICING /REPLACEMENT OF FEEDER INLET GATE/ BUNKEROUTLET GATE/NEEDLE GATE ASSEMBLY |
| 175 | SERVICING OF RCF MAIN DRIVE GEAR BOX |
| 176 | REMOVAL AND RE-FIXING OF BURNER PANEL INNER/OUTER COVER PLATE WITH FASTENER |
| 177 | ONLINE EMPTY, CLEANING OF RAW COAL BUNKER |
| 178 | FABRICATION & ERECTION OF PLATFORM |
| 179 | CUTTING OF CHANNEL, I BEAM, ANGLE TO REQUIRED SIZE AFTER TAKING MEASUREMENT |
| 180 | WELDING OF CHANNEL, I BEAM, ANGLE WITH THE STRUCTURE BEAM OR SUPPORT OF THE BOILER |
| 181 | CUTTING OF STEEL TO REQUIRED SIZE AFTER TAKING MEASUREMENT |
| 182 | WELDING OF STEEL PLATE WITH THE STRUCTURE BEAM OR SUPPORT OF THE BOILER |
| 183 | REPAIR AND RESTRUCTRING OF CANOPY |
| 184 | WORK OF REPAIRING AND ROTATION/REPLACEMENT OF 125 NB MS PIPE LINE |
| 185 | REPAIR / MAINTENANCE OF DUCTING |
| 186 | CLEANING OF ASH FROM INSIDE THE DUCT |
| 187 | REPAIR OF DUCTS WITHOUT STEEL |
| 188 | DISMANTLING OF STEEL STRUCTURES |
| 189 | WELDING OF STEEL PLATE & LONG PRODUCT |
| 190 | GAS CUTTING OF M. S. MATERIAL |
| 191 | REPLACEMENT OF BRACING PIPES,PROTECTIVE ANGLES INSIDE DUCT |
| 192 | REPLACEMENT OR REPAIRING AND REFIXING OF C & I TAPPING POINTS |
| 193 | REPAIRING OF APH HOPPER |
| 194 | REPAIRING OF ECONOMIZER HOPPER |
| 195 | REPAIR OF DUCTS MAN HOLE DOOR |
| 196 | REPLACEMENT OF DUCT/APH MANHOLE DOOR |
| 197 | INTERNAL CLEANING OF APH CASING (WITH HYDRO JET) |
| 198 | ERECTION AND REMOVAL QUICK ERECT SCAFFOLDING PLATFORM AT COLD END (GAS/AIR SIDE) |
| 199 | MAINTENANCE OF ESP |
| 200 | REPLACEMENT/RECLAMATION OF PLANE BEARINGS |
| 201 | REPLACEMENT OF RAPPING HAMMERS OF CERM/EERM/GDRM |
| 202 | REPLACEMENT OF SHAFT INSULATORS |
| 203 | REPLACEMENT OF SUPPORT INSULATORS |
| 204 | REPAIRING /REPLACEMENT OF RAPPING SHAFTS (SHAFT-I, SHAFT-II & SHAFT-III) OF CERM/EERM/GDRM |
| 205 | REPAIRING /REPLACEMENT OF VERTICAL SHAFTS (SHAFT-I, SHAFT-II & SHAFT-III) OF EERM |
| 206 | REPAIR/REPLACEMENT OF SHOCK BAR PAD |
| 207 | REPLACEMENT OF GEAR WHEEL (PIN WHEELS- BIG & SMALL) OF EERM |
| 208 | REPLACEMENT OF BUSH BEARING & BUSH BEARING HOUSING |
| 209 | INTERNAL CLEANING OF ESP FIELDS & HOPPERS |
| 210 | CLEANING & INSPECTION OF SUPPORT INSULATORS & ITS HEATING ELEMENTS |
| 211 | CLEANING & INSPECTION OF SHAFT INSULATORS & ITS HEATING ELEMENTS |
| 212 | ALIGNMENT OF EMITTING FRAME |
| 213 | REPAIRING OF SUPPORT ANGLE |
| 214 | REPLACEMENT OF GD DEFLECTION PLATE |
| 215 | REPAIRING & ALIGNMENT OF COLLECTING ELECTRODE |
| 216 | REPLACEMENT & ALIGNMENT OF EMITTINGG ELECTRODE |
| 217 | RECLAMATION & REPLACEMENT OF JAW COUPLING OF CERM /EERM/ GDRM |
| 218 | MAINTENANCE OF COAL MILL, COAL PIPE & PF BENDS |
| 219 | COMPLETE OVERHAULING OF COAL MILLS |
| 220 | REPLACEMENT OF CEREMIC LINED COAL PIPE BENDS/MOE |
| 221 | REPLACEMENT OF STRAIGHT P.F. PIPE WITH OR WITHOUT COLLAR |
| 222 | REPLACEMENT OF JOURNAL HEAD ASSEMBLY WITH GRINDING ROLL |
| 223 | REPLACEMENT OF BULL RING SEGMENTS |
| 224 | REPLACEMENT/ROTATION OF ORIFICES OR REPLACEMENT OF VICTAULIC COUPLING OF P.F.PIPE LINES |
| 225 | REPAIR/REPLACEMENT OF AIR PORT ASSY |
| 226 | SERVICING OF ROLLER JOURNAL ASSY |
| 227 | REPAIRING/PREPLACEMENT OF BOWL HUB COVER |
| 228 | REPAIRING/REPLACEMENT OF CLAMPING RING |
| 229 | REPAIRING/REPLACEMENT OF GRINDING ROLL LOCK NUT OF RJA |
| 230 | REPLACEMENT OF JOURNAL STOP BUSH WITH BOLT/ SPRING STUD BEARING OF JOURNAL COMPRESSION SPRING |
| 231 | FABRICATION/REPLACEMENT OF UPPER JOURNAL HOUSING LINER |
| 232 | FABRICATION/REPLACEMENT OF JOURNAL HEAD LINER |
| 233 | REPAIR/REPLACEMENT OF SEPERATOR BODY LINER UP TO INSPECTION DOOR OF MILL |
| 234 | REPAIR/REPLACEMENT OF MILL BOTTOM LINER ASSEMBLY/ MILL SIDE LINER ASSEMBLY OF REJECT CHAMBER |
| 235 | ROTATION/REPLACEMENT OF TRANSITION PIPE ABOVE MDV |
| 236 | REPAIRING/REPLACEMENT OF VENTURY CONE & COLLAR |
| 237 | REPLACEMENT OF MPO & MDV ASSEMBLY |
| 238 | SERVICING OF MECHANICAL FACE SEAL |
| 239 | ALIGNMENT OF MILL MOTOR WITH GEAR BOX |
| 240 | CLEANING OF MILL GEAR BOX HOUSING & COOLERS |
| 241 | PREPERATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCKS SYSTEM) |
| 242 | REPLACEMENT/REPAIRING OF INNER CONE DRUM SECTION |
| 243 | FABRICATION OF COAL PIPE FLANGE/COLLAR |
| 244 | REPAIRING OF COAL PIPE SUPPORT FRAME |
| 245 | SERVICING/REPLACEMENT OF CLASSIFIER ASSEMBLY |
| 246 | REPLACEMENT/REPAIRING & ROTATION OF CENTRE FEED PIPE/ UPPER AND LOWER PIPE OF COAL MILL |
| 247 | SERVICING OF WORM SHAFT |
| 248 | SERVICING/REPLACEMENT OF VERTICAL SHAFT LOWER THRUST BEARING |
| 249 | REPAIRING OF JOURNAL OPENING COVER |
| 250 | REPAIRING OF JOURNAL HEAD |
| 251 | REPAIR/REPLACEMENT OF TRAMP IRON SPOUT BODY |
| 252 | REPAIRING OF SEPARATOR BODY TOP |
| 253 | REPLACEMENT/ REPAIR OF HEAT SHIELD |
| 254 | REPAIRING OF OUTER SEAL RING OF MILL BOTTOM BASE PLATE |
| 255 | REPLACEMENT OF OUTER SEAL RING OF MILL BOTTOM BASE PLATE |
| 256 | REPLACEMENT OF GEAR COUPLING OR BIBY COUPLING |
| 257 | PICKING & TRANSPORTATION OF MUDDY COAL Total in Figures 23 26277288.92 INR Two Crore Sixty Two Lakh Seventy Seven Thousand Two Hundred & Eighty Eight and Paise Ninety Two Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Two Crore Sixty Two Lakh Seventy Seven Thousand Two Hundred & Eighty Eight and Paise Ninety Two Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 31 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 34 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender