Tender For Replacement And Supply, Installation, Testing and Commissioning With Five Years Comprehensive annual maintenance contract Of Weather Monitoring Systems At Sagar Samrat, Heera & Ratna R-12A Post One Year Warranty
Tender Overview
Project Description
Tender for Replacement And Supply, Installation, Testing and Commissioning With Five Years Comprehensive annual maintenance contract Of Weather Monitoring Systems At Sagar Samrat, Heera & Ratna R-12A Post One Year Warranty
BOQ
| Sl. No. | Item Description |
| 1 | Total Evaluated Lumpsum Cost of Project |
| 2 | Total Evaluated Lumpsum Cost of Project (LSTK Cost + Evaluated CAMC charges) OIL AND NATURAL GAS CORPORATION LIMITED (Total Price for complete Scope of work) |
| 3 | Tender No. |
| 4 | Name of the Bidder Note : Only Yellow Coloured Cells to be filled S/N Description Lumpsum Price inclusive of GST (in INR) |
| 5 | Total LSTK Cost including supply, Installation, Commissioning and handing over of project (A1) |
| 6 | Total Quoted CAMC charges (A2) |
| 7 | Total Evaluated CAMC charges based on NPV methodology (A3) |
| 8 | Total Quoted Cost of Project (LSTK Cost + Total quoted CAMC Charges i.e A1 + A2) of Project |
| 9 | Total Evaluated Cost of Project (LSTK Cost +Total Evaluated CAMC Charges based on NPV Methodology i.e, A1 + A3) OIL AND NATURAL GAS CORPORATION LIMITED Replacement of Weather Monitoring Systems at Sagar Samrat. Heera & Ratna R-12A Platform and subsequent five years (05) Comprehensive AMC on LSTK Basis through Open Tender Break-up Sheet of Lumpsum Price (LSTK Cost) Currency of Quote INR Note : Only Yellow Coloured Cells to be filled (I) LSTK Cost Unit Rates Sl. No. Description of Item Unit Basic unit price (Rs) GST rate in % GST Amount in Rs Total Unit rate (in Rs) Qty Total LSTK cost (in Rs) (A) (B) (C) (D=A+C) (Q) (E=Q*D) |
| 10 | Location A: Total LSTK Cost including supply, Installation, Commissioning and handing over of project as per SoW of Sagar Samrat, MH Asset |
| 11 | Location B : Total LSTK Cost including supply, Installation, Commissioning and handing over of project as per SoW of Heera & Ratna R-12, NH &BS Asset Total LSTK Cost including supply, Installation, Commissioning and handing over of project. (A1) 0.0 OIL AND NATURAL GAS CORPORATION LIMITED Replacement of Weather Monitoring Systems at Sagar Samrat. Heera & Ratna R-12A Platform and subsequent five years (05) Comprehensive AMC on LSTK Basis through Open Tender Break-up Sheet of Lumpsum Price for 5 years CAMC Charges Currency of Quote INR Note : Only Yellow Coloured Cells to be filled Location A: 5 years CAMC Charges of Sagar Samrat, MH Asset Sl. No. Description of Item Unit Qty NPV factor @12% hurdle rate Basic Price in Rs. GST rate in % GST Amount in Rs. Price inclusive of GST Total Quoted Price in Rs. Total Evaluated Price per year based on NPV in Rs. Services : CAMC Charges (Q) (N) (A) (B) (C) (D=A+C) (E=Q*D) F=E*N |
| 12 | 1st year CAMC |
| 13 | 2nd year CAMC |
| 14 | 3rd year CAMC |
| 15 | 4th year CAMC |
| 16 | 5 th year CAMC Total Quoted CAMC Charges for 05 years (A2.1) 0.0 Total Evaluated CAMC Charges for 05 years based on NPV Methodology (A3.1) 0.0 Location B : 5 years CAMC Charges Heera & Ratna, NH & BS Asset Sl. No. Description of Item Unit Qty NPV factor @12% hurdle rate Basic Price in Rs. GST rate in % GST Amount in Rs. Price inclusive of GST Total Quoted Price in Rs. Total Evaluated Price per year based on NPV in Rs. Services : CAMC Charges (Q) (N) (A) (B) (C) (D=A+C) (E=Q*D) F=E*N |
| 17 | 1st year CAMC |
| 18 | 2nd year CAMC |
| 19 | 3rd year CAMC |
| 20 | 4th year CAMC |
| 21 | 5 th year CAMC Total Quoted CAMC Charges for 05 years (A2.2) 0.0 Total Evaluated CAMC Charges for 05 years based on NPV Methodology (A3.2) 0.0 Total Quoted CAMC Charges for 05 years (A2) 0.0 Total Evaluated CAMC Charges for 05 years based on NPV Methodology (A3) 0.0 Note:(i) The bidder has to quote for 5 years post warranty CAMC for the equipment supplied under this project. (ii)The quoted total amount for 5 years post warranty CAMC Charges shall be minimum 25% of the Total LSTK part Cost (SIC cost inclusive of Taxes). The quoted annual CAMC charges offered for each subsequent year should be same or higher than preceding year.(iii)If the quoted total amount for 5 years post warranty CAMC Charges including taxes for any location is found to be less than 25% of the SIC cost including taxes for that location, then the CAMC charges including taxes shall be adjusted by increasing an amount to make it 25% of the SIC cost including taxes for that location. This additional amount shall be proportionately increased in year-wise CAMC charges of that location. The amount thus increased in the cumulative CAMC charges shall be reduced from Total SIC cost for respective location. Also, in case quoted annual CAMC charges neither uniform nor in ascending order, uniform annual CAMC charges would be considered for award. However, the total quoted project cost will remain same. This price adjustment will be made in the contract document for payment and LD purpose only (if bidder happens to be successful bidder for award of contract).(iv) The bidder must submit an undertaking (as per Appendix-xx) on their company letter head that the above conditions are acceptable to them. (v) Bidder to note that contract shall be awarded on the total quoted Lump sum contract price indicated ‘Summary’ Sheet of the Price format. I Change In Laws and Regulations: TAXES AND DUTIES RATES OF TAXES & DUTIES CONSIDERED AND INCLUDED IN THE LUMPSUM PRICE FOR CHANGE IN LAW Laws, Acts, Rules, regulations etc. and the tariffs thereof considered by the bidder while estimating the incidence of taxes, duties, fees, levies etc. considered and included in the bidder’s Lumpsum price (as quoted in Appendix-7), as per relevant provisions of General Conditions of Contract to be used for the purpose of adjustment to the contract price in the event of Change in Law in terms of clause no.43.0 of General Conditions of Contract are as under: Sr No Description of Item Tender Document / BEC Clause Reference Laws/Act/Rules/ Regulations etc. Reference Tariff Indicating Rate of Tax/Duty/ Fee/Levy etc Amount included in Lumpsum Price |
| 22 | Customs duty, if any |
| 23 | CGST a SGST b IGST |
| 24 | Any other tax / duty Notes: 1. Bidders are required to ascertain themselves, the prevailing rates of GST and all other taxes and duties as applicable on the scheduled date of submission of Techno-commercial Bids and ONGC would not undertake any responsibility whatsoever in this regard. Accordingly, bidders should quote the prices, clearly indicating the rate of GST, description of service and Service Accounting Code (i.e., HSN/ SAC) as per GST Law as ascertained by the bidder. 2. Bidder may suitably add other heads in terms of Change in Law clause of General Conditions of Contract. 3. Change in law shall not be applicable to taxes and duties in respect of subcontractors, venders etc. of contractors. 4. Prices should be inclusive of corporate taxes as applicable and the same is not covered under the Change-in-Law provisions. 5. Bidder shall indicate the details of Laws/ Acts / Rules/ Regulations reference and tariff indicating rates of tax / duties / fee/ charge/ Levy under Column 2 & 3 respectively in the unpriced bid also. 6. In case amount is not indicated by the bidder as sought above then the bidder will not be entitled for indemnification by ONGC under \\"Change in Law\\" provision(s) for increased liabilty of Taxes & Duties. 7. The bidder should also indicate the details of imported raw material/components and its value for availing customs duty benefit, in the following tables. Sr. No. Name of Imported Raw Material / Component Quantity of Imported Raw Material / Component CIF value of Imported Raw Material / Component (Bidders' to indicate the currency in which imports is made for the purpose of information) OIL AND NATURAL GAS CORPORATION LIMITED Replacement of Weather Monitoring Systems at Sagar Samrat. Heera & Ratna R-12A Platform and subsequent five years (05) Comprehensive AMC on LSTK Basis through Open Tender Location wise contract value Location A: MH Asset Total contract Value Sl. No. Description of Item Amount (INR) |
| 25 | Total LSTK Cost including supply, Installation, Commissioning and handing over of project as per SoW of Sagar Samrat, MH Asset |
| 26 | Total Quoted CAMC Charges for 05 years (A2.1) |
| 27 | Total Evaluated CAMC Charges for 05 years based on NPV Methodology (A3.1) Total quoted Contract vlaue 0.0 Total Evaluated Contract vlaue 0.0 Location B: NH & BS Asset Total contract Value Sl. No. Description of Item Amount (INR) |
| 28 | Total LSTK Cost including supply, Installation, Commissioning and handing over of project as per SoW of Heera & Ratna R-12A, NH& BS Asset |
| 29 | Total Quoted CAMC Charges for 05 years (A2.2) |
| 30 | Total Evaluated CAMC Charges for 05 years based on NPV Methodology (A3.2) Total quoted Contract vlaue 0.0 Total Evaluated Contract vlaue 0.0 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 36 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 37 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender