Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate Wi
Tender Overview
Project Description
Bids Are invited for Custom Bid For Services - ---- - Erection,Installation, Commissioning Of Single Pole/Double Pole Of 11 Kv And Lt Kv Overhead/Underground Lines And Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With All Required Materials.Work Includes All Cartage, Carriage, Of Including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion Of Said Work But Not Mentioned In This Boq/Estimate. , Replacement Of 8.5 Mtrs. Long Damaged Single Pcc Pole By Opening Of All Existing Accessories And Conductor From Damaged Pole Properly And Removal Of Damaged Pole And Erect The New Pole At Same Place Including Fixing Of All Existing Accessories And Conductor On The New Pole Etc. As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P Etc. (Including Carriage Of Damaged Pole To Another Place) Required For Proper Completion Of Work. , Replacement Of 11 Mtrs. Long Damaged Single St Pole By Opening Of All Existing Accessories And Conductor From Damaged Pole Properly And Removal Of Damaged Pole And Erect The New Pole At Same Place Including Fixing Of All Existing Accessories And Conductor On The New Pole Etc. As Per Direction Of Supervising Engineer. It Including The Cost Of All Labour, T&P Etc. (Including Carriage Of Damaged Pole To Another Place) Required For Proper Completion Of Work. , Grouting Of Pcc/St Pole In Ratio 1:4:8 Cement, Sand And Brick Ballast As Per Standard Norms, Including Cost Of All Grouting Material. , Laying, Sagging Stringing And Binding Of Acsr Insulated Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Acsr Weasel Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Acsr Dog Conductor On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Arial Bunch Conductor 3X50x95x120 Sqmm On The Erected Pcc Pole/Stp Including Jumpering As Per Respo Manual. , Laying, Sagging Stringing And Binding Of Lt Pvc/Xlpe Cable From T/F To Pole/Box Jumpering As Per Respo Manual. , Earthing Of Poles By Fixing Earthing Rods And Binding With Earth Wire As Per Standard Norms Including Cost Of Labour T&P And Required Material For Such Work. , Installation Of Stay Set With Grouting And Nuzzling Etc. As Per Respo Drawing Along With All Routine Material To Be Used For Such Works. , Making Of 11 Kv Guarding By Laying Two Nos. Gi Wire Parallel And Fixing Of Lacings (Tilli) At A Distance At 2-3 Mtrs. As Per Direction Of Supervising Engineer/Respo Manual. (Work Includes All Labour, T&P Etc. Required For Proper Completion Of Work) As Per Respo Norms. , Chopping Of Tree Branches To Clear The Line Route To Give 02 Meter Horizontal And Vertical Clearance To The Line Including Cost Of Labour T&P Etc. , Installation Of Distribution Box With Cl As Per Respo Norms , Replacement Of Damaged 11 Kv Feeders Jumpering With Dog Conductor At Various Places. , Shielding Of Electric Pole By Covering And Providing Rubber Pipe Around The Pole Complete With Pasting By Solution And Binding Etc. Rubber Matting Shall Be Provided From The Botttom Of The Pole Up To The Minimum Height 8 Ft. Required For Safety Purpose. It Includes Coast Of All Material T&P Carriage And Supervision Charges Required For Proper Completion Of Work. , Re-Sagging Of Loose 11 Kv./L.T. Line As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. , Re-Sagging Of Loose Arial Bunch Conductor As Per Direction Of Supervising Engineer. It Includes The Cost Of Labour, T&P Etc Required For Proper Completion Of Work. , Providing Bamboo Sticks (Spacers) Suitable For 04 Wire On The Lade Conductors It Include The Cost Of Bamboo Sticks, Binding Wire Labourer, T & P Carrier Etc. Required For Completion Of Work. , Providing And Fixing Of Various Type Lugs On Different Distribution Transformersas Per Direction By Supervising Engineer. , Providing And Fixing Of Various Size Fuse Wire (I.E. 6,8,12,14 Swg) At Different Distribution Transformersas Per Direction By Supervising Engineer. , Repairing Of Plinth Of 250/400 Kva T/F By Cement,Sand, Earth Brick Ballast Etc. With Proper Hammering, Plastering Etc. The Contractor Shall Be Responsible To Complete The Work As Per Direction Of Supervision Engineer. It Includes The Cost Of All Material, Labour, T & P, Carrier Etc. Required For Proper Completion Of Work. , Wire Mesh Fencing With Foldable Gate Hight Minimum 06 Feet (Rate Shold Be Running Per Meter) Including Painting Of Fencing With Red Oxide And Yellow Enamel Paint And With Proper Grouting Erection And Construction Of Toe-Wall Around The Transformer Plinth Including Making Wall 9 Inch Wide & 30 Cm. Under The Ground Level And 30 Cm. Up To The Ground Level And Making Pocket Filling The Concreting For Grouting As Per Direction By Supervising Engineer And Plastering Around The Wall In Ratio 1:4 Cement And Sand (As Per Approved Gtp). All Material/Labour Will Be Arranged By The Contractor. , Body And Nutral Earthing Of Distribution Tranformers By Digging Of Pit Up To Water Level Depth And Then Inserting 1-1/6 Dia Gi Pipe Of B Grade, Conforming To The Requirement Of Is Specification And Then Connecting The Top Of The Inserted Pipe And Transformer Body Through Gi Strip Of Size 50 X 6 Mm With The Help Of Nut And Bolt Or Through Gas Welding, As Per Direction Of Supervising Engineer. It Includes The Cost Of All Material, Laborer, T&P, Carrier Etc. Required For Proper Completion Of Work.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. | Erection,Installation, Commissioning of Single Pole/Double Pole of 11 KV and LT KV Overhead/Underground Lines and Transformers By Completeing Following Works/Jobs As Per Respo Drawings/Estimate With all required Materials.Work Includes All Cartage, Carriage, of including Received Back Material. T&P, Raw Materials And Any Other Material/Work Which Is Required For Completion of Said Work But Not Mentioned In This Boq/Estimate. |
| 2 | Replacement of 8.5 Mtrs. Long damaged Single PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. | Replacement of 8.5 Mtrs. Long damaged Single PCC pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. |
| 3 | Replacement of 11 Mtrs. Long damaged Single ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. | Replacement of 11 Mtrs. Long damaged Single ST pole by opening of all existing accessories and conductor from damaged pole properly and removal of damaged pole and erect the new pole at same place including fixing of all existing accessories and conductor on the new pole etc. as per direction of supervising engineer. It including the cost of all labour, T&P etc. (including carriage of damaged pole to another place) required for proper completion of work. |
| 4 | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. | Grouting of PCC/ST pole in ratio 1:4:8 cement, sand and brick ballast as per standard norms, including cost of all grouting material. |
| 5 | Laying, sagging stringing and binding of ACSR Insulated Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Insulated Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 6 | Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Weasel Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 7 | Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of ACSR Dog Conductor on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 8 | Laying, sagging stringing and binding of Arial Bunch Conductor 3x50x95x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual. | Laying, sagging stringing and binding of Arial Bunch Conductor 3x50x95x120 sqmm on the erected PCC pole/STP including jumpering as per RESPO manual. |
| 9 | Laying, sagging stringing and binding of LT PVC/XLPE Cable from T/F to Pole/Box jumpering as per RESPO manual. | Laying, sagging stringing and binding of LT PVC/XLPE Cable from T/F to Pole/Box jumpering as per RESPO manual. |
| 10 | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. | Earthing of poles by fixing earthing rods and binding with earth wire as per standard norms including cost of labour T&P and required material for such work. |
| 11 | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. | Installation of stay set with grouting and nuzzling etc. as per RESPO drawing along with all routine material to be used for such works. |
| 12 | Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms. | Making of 11 KV Guarding by laying two nos. GI wire parallel and fixing of lacings (tilli) at a distance at 2-3 mtrs. as per direction of supervising engineer/RESPO manual. (Work includes All labour, T&P etc. required for proper completion of work) as per RESPO Norms. |
| 13 | Chopping of Tree Branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. | Chopping of Tree Branches to Clear the line route to give 02 meter horizontal and vertical clearance to the line including cost of labour T&P etc. |
| 14 | Installation of Distribution Box with Clamp as per RESPO Norms | Installation of Distribution Box with Clamp as per RESPO Norms |
| 15 | Replacement of Damaged 11 KV Feeders jumpering with Dog Conductor at various places. | Replacement of Damaged 11 KV Feeders jumpering with Dog Conductor at various places. |
| 16 | Shielding of electric pole by covering and providing Rubber pipe around the pole complete with pasting by solution and binding etc. Rubber matting shall be provided from the botttom of the pole up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. | Shielding of electric pole by covering and providing Rubber pipe around the pole complete with pasting by solution and binding etc. Rubber matting shall be provided from the botttom of the pole up to the minimum height 8\\" ft. Required for safety purpose. It Includes coast of all material T&P carriage and Supervision charges required for proper completion of work. |
| 17 | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. | Re-sagging of loose 11 KV./L.T. line as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 18 | Re-sagging of loose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. | Re-sagging of loose Arial Bunch Conductor as per direction of supervising engineer. It includes the cost of labour, T&P etc required for proper completion of work. |
| 19 | Providing Bamboo Sticks (Spacers) suitable for 04 wire on the lade Conductors it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work. | Providing Bamboo Sticks (Spacers) suitable for 04 wire on the lade Conductors it include the cost of bamboo sticks, binding wire labourer, T & P carrier etc. required for completion of work. |
| 20 | Providing and Fixing of Various Type Lugs on Different Distribution Transformersas per direction by supervising engineer. | Providing and Fixing of Various Type Lugs on Different Distribution Transformersas per direction by supervising engineer. |
| 21 | Providing and Fixing of Various size Fuse Wire (i.e. 6,8,12,14 SWG) at different Distribution Transformersas per direction by supervising engineer. | Providing and Fixing of Various size Fuse Wire (i.e. 6,8,12,14 SWG) at different Distribution Transformersas per direction by supervising engineer. |
| 22 | Repairing of plinth of 250/400 KVA T/F by cement,sand, earth brick ballast etc. with proper hammering, plastering etc. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work. | Repairing of plinth of 250/400 KVA T/F by cement,sand, earth brick ballast etc. with proper hammering, plastering etc. The contractor shall be responsible to complete the work as per direction of Supervision Engineer. It includes the cost of all material, labour, T & P, carrier etc. required for proper completion of work. |
| 23 | Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor. | Wire Mesh Fencing with foldable Gate hight minimum 06 feet (Rate shold be running per meter) including painting of Fencing with Red Oxide and Yellow enamel paint and with proper grouting Erection and construction of Toe-wall around the transformer plinth including making wall 9 inch wide & 30 cm. under the ground level and 30 cm. up to the ground level and making pocket Filling the concreting for grouting as per direction by supervising engineer and plastering around the wall in ratio 1:4 cement and sand (as per approved GTP). All material/labour will be arranged by the contractor. |
| 24 | Body and Nutral Earthing of Distribution Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work. | Body and Nutral Earthing of Distribution Tranformers by digging of pit up to water level depth and then inserting 1-1/6” dia GI pipe of “B” grade, conforming to the requirement of IS specification and then connecting the top of the inserted pipe and transformer body through GI strip of size 50 x 6 mm with the help of nut and bolt or through gas welding, as per direction of supervising engineer. It includes the cost of all material, laborer, T&P, carrier etc. required for proper completion of work. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.