Railways Government Departments Closing in 4 days TDR #57108039

Supply Of Leather Bellow With Collar

Issued by Government Departments · Jamalpur, Bihar
Tender Value
Ref. Documents
Estimated cost
Bid Submission
11 Sep 2026
4 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Jamalpur → Bihar
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Supply Of leather bellow with collar , key set consisting of sl. no:- (1) key for link, ky-36 as per drg. no:- jmp/jj/spl. 1a/2017 item no-2alt-6 . qty----36 nos. sl. no:- (2) key for screw spindle, ky-43 as per jmp drg.no:-jmp/jj/spl. 2/17 item no-3 alt-4. qty.----18 nos. sl. no:- (3) key for large sprocket, ky-63 as per jmp drg. no:- jmp/jj/spl. 1a/2017 item no-8 alt-6 (one set consist of sl.no.1 to 3) [ warranty period: 30 months after the date of delivery ] ] , leather bellow with collar as per drg. no. wj-8/m alt-2, mat. & spec. as per drawing. [ warr anty period: 30 months after the date of delivery ] ] , jubllee clip, as per drg. no.- wj-22/m, alt.-3, mat. & spec. as per drg. [ warranty period: 30 months after the date of delivery ] ] , top bracket cover, wj-60 as per drg. no:- jmp / jj / spl. 1a / 2017, item no:- 6, alt-6. material specification is 2062/11 e 250 a / bo or br. [ warranty period: 30 months after the date of deliv ery ] ] , side wheel, wj-83/m, as per er/jmpdrg. no. wj-83/m, alt-3, (mat. specn.- as per drg.) [ warr anty period: 30 months after the date of delivery ] ] , rear wheel, wj-84/m, as per jmpdrg. no.wj-84/m, alt-2, (mat. specn.- as per drg.) [ warrant y period: 30 months after the date of delivery ] ] , sprocket large, as per drg. no. wj-24/m, alt-d. mat. & spec. as per drawing. [ warranty per iod: 30 months after the date of delivery ] ] , small sprocket wj-23/m, as per sk. no.-jmp/jack/03/2020, alt-1, mat. & spec. as per drawin g. [ warranty period: 30 months after the date of delivery ] ] , top bracket, wj-7/m, as per drg. no.wj-7/m, alt-3 [mat. specn. as mentioned in drg.] [ warr anty period: 30 months after the date of delivery ] ]

BOQ

Sl. No.Item Description
1Key set consisting of Sl. No:- (1) Key for Link, KY-36 as per Drg. No:- JMP/JJ/SPL. 1A/2017 Item No-2Alt-6 . Qty----36 Nos. Sl. No:- (2) Key for screw spindle, KY-43 as per JMP Drg.No:-JMP/JJ/SPL. 2/17 Item No-3 Alt-4. Qty.----18 Nos. Sl. No:- (3) Key for large sprocket, KY-63 as per JMP Drg. No:- JMP/JJ/SPL. 1A/2017 Item No-8 Alt-6 (One set consist of Sl.No.1 to 3) [ Warranty Period: 30 Months after the date of delivery ] ]
2Leather Bellow With Collar as per drg. no. WJ-8/M ALT-2, Mat. & Spec. as per drawing. [ Warr anty Period: 30 Months after the date of delivery ] ]
3Jubllee Clip, as per Drg. No.- WJ-22/M, Alt.-3, Mat. & Spec. as per drg. [ Warranty Period: 30 Months after the date of delivery ] ]
4Top Bracket Cover, WJ-60 As per Drg. No:- JMP / JJ / SPL. 1A / 2017, Item No:- 6, Alt-6. Material Specification IS 2062/11 E 250 A / BO or BR. [ Warranty Period: 30 Months after the date of deliv ery ] ]
5Side Wheel, WJ-83/M, as per ER/JMPDrg. No. WJ-83/M, Alt-3, (Mat. Specn.- As per Drg.) [ Warr anty Period: 30 Months after the date of delivery ] ]
6Rear Wheel, WJ-84/M, as per JMPDrg. No.WJ-84/M, Alt-2, (Mat. Specn.- As per Drg.) [ Warrant y Period: 30 Months after the date of delivery ] ]
7Sprocket Large, as per Drg. No. WJ-24/M, Alt-d. Mat. & Spec. as per drawing. [ Warranty Per iod: 30 Months after the date of delivery ] ]
8Small Sprocket WJ-23/M, as per SK. NO.-JMP/Jack/03/2020, aLT-1, Mat. & Spec. as per drawin g. [ Warranty Period: 30 Months after the date of delivery ] ]
9Top Bracket, WJ-7/M, as per Drg. No.WJ-7/M, Alt-3 [Mat. Specn. as mentioned in drg.] [ Warr anty Period: 30 Months after the date of delivery ] ]

AI Tender Summary

OUR REF NO 57108039
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 11-09-2026
Authority
Authority Name Eastern Railways
Work Description Supply Of leather bellow with collar , key set consisting of sl. no:- (1) key for link, ky-36 as per drg. no:- jmp/jj/spl. 1a/2017 item no-2alt-6 . qty----36 nos. sl. no:- (2) key for screw spindle, ky-43 as per jmp drg.no:-jmp/jj/spl. 2/17 item no-3 alt-4. qty.----18 nos. sl. no:- (3) key for large sprocket, ky-63 as per jmp drg. no:- jmp/jj/spl. 1a/2017 item no-8 alt-6 (one set consist of sl.no.1 to 3) [ warranty period: 30 months after the date of delivery ] ] , leather bellow with collar as per drg. no. wj-8/m alt-2, mat. & spec. as per drawing. [ warr anty period: 30 months after the date of delivery ] ] , jubllee clip, as per drg. no.- wj-22/m, alt.-3, mat. & spec. as per drg. [ warranty period: 30 months after the date of delivery ] ] , top bracket cover, wj-60 as per drg. no:- jmp / jj / spl. 1a / 2017, item no:- 6, alt-6. material specification is 2062/11 e 250 a / bo or br. [ warranty period: 30 months after the date of deliv ery ] ] , side wheel, wj-83/m, as per er/jmpdrg. no. wj-83/m, alt-3, (mat. specn.- as per drg.) [ warr anty period: 30 months after the date of delivery ] ] , rear wheel, wj-84/m, as per jmpdrg. no.wj-84/m, alt-2, (mat. specn.- as per drg.) [ warrant y period: 30 months after the date of delivery ] ] , sprocket large, as per drg. no. wj-24/m, alt-d. mat. & spec. as per drawing. [ warranty per iod: 30 months after the date of delivery ] ] , small sprocket wj-23/m, as per sk. no.-jmp/jack/03/2020, alt-1, mat. & spec. as per drawin g. [ warranty period: 30 months after the date of delivery ] ] , top bracket, wj-7/m, as per drg. no.wj-7/m, alt-3 [mat. specn. as mentioned in drg.] [ warr anty period: 30 months after the date of delivery ] ]
Basic Detail
Tender No 55266507
Bidding Type Tender
Location
City Jamalpur
State Bihar
Key Dates
Publish Date 20 Aug 2026
Submission Date 11 Sep 2026
Open Date 01 Jan 0001
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
10.WJ-8-MALT-2.PDF
11.WJ-22.MALT-3.pdf
12.DRG.No.-JMP-JJ-SPL-1A-2017ALT-6.pdf
13.ER-WJ-7-MALT-3.pdf
14.DRG.No.JMP-JJ-SPL.2-17ALT-4.pdf
15.ER-WJ-83-MALT-3.PDF
16.ER-WJ-84-MALT-2.PDF
3cd3cf14-b6db-499b-a164-71d95bd53331.pdf
8.ER-WJ-24-MALT-d.PDF
9.SK.NO.-JMP-JACK-03-2020ALT-1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 11, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
WJ-8-MALT-2

10.WJ-8-MALT-2.PDF

WJ-22

11.WJ-22.MALT-3.pdf

DRG

12.DRG.No.-JMP-JJ-SPL-1A-2017ALT-6.pdf

ER-WJ-7-MALT-3

13.ER-WJ-7-MALT-3.pdf

DRG

14.DRG.No.JMP-JJ-SPL.2-17ALT-4.pdf

ER-WJ-83-MALT-3

15.ER-WJ-83-MALT-3.PDF

ER-WJ-84-MALT-2

16.ER-WJ-84-MALT-2.PDF

pdf

3cd3cf14-b6db-499b-a164-71d95bd53331.pdf

ER-WJ-24-MALT-d

8.ER-WJ-24-MALT-d.PDF

SK

9.SK.NO.-JMP-JACK-03-2020ALT-1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders