Tender For Work For Diversion Of 220 Kv Dc (Jtps-Kasganj) & (Jtps-Mainpuri) Line Under Etd Mainpuri
Tender Overview
Project Description
Tender for Work For Diversion Of 220 Kv Dc (Jtps-Kasganj) & (Jtps-Mainpuri) Line Under Etd Mainpuri
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 22-Sep-2026 | Date Extension. | Date | 05-Oct-2026 |
| 2 | 12-Oct-2026 | Date......... | Date | 21-Oct-2026 |
| 3 | 15-Sep-2026 | Date | Date | 22-Sep-2026 |
| 4 | 05-Oct-2026 | Date... | Date | 12-Oct-2026 |
| 5 | 22-Oct-2026 | Date...... | Date | 02-Nov-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Supply |
| 2 | Tower Parts,MS galvanized including Nut & Bolts, Stub and Template |
| 3 | OPGW &hardware accessories |
| 4 | 48 fibre (DWSM)OPGW fibre optic cable |
| 5 | Supply of Harware Set for 48 fibre(DWSM)OPGW |
| 6 | Number plate. |
| 7 | Danger plate. |
| 8 | Phase plate. |
| 9 | Supply of pipe type earthing equipment. |
| 10 | Circuit Plate (Set of 2) |
| 11 | Insulator |
| 12 | 160 KN Porcelain Insulator |
| 13 | Hardwares Suitable for ACSR Zebra |
| 14 | Supply of Compression type single tension fitting. |
| 15 | Single suspension fitting |
| 16 | Conductor Accessories suitable for ACSR Zebra |
| 17 | Vibration Dampers |
| 18 | Mid Span Compression Joint |
| 19 | Repair Sleeves |
| 20 | Performed Armour Rod |
| 21 | Erection work |
| 22 | Survey including preparation of schedule of materials marking of locations (Route length). GPS survey of line with co-ordinates of each tower (The length of line shall be authenticated by GPS survey) |
| 23 | Check Survey |
| 24 | Soil investigation(All kind of soil) |
| 25 | Cost of excavation of 220 KV tower foundation pits including all earth work, bacfilling, levelling etc. |
| 26 | Setting of stubs including all foundation work but excluding the cost of concerting and excavation (Rate per location) for following towers |
| 27 | 220 KV DB/DB+5/DB+10/DB+15(zebra) |
| 28 | 220 KV DC/DC+5/DC+10/DC+15 |
| 29 | Cost of concreting for all type of tower foundation including cost of cement, dewatering, shoring and shuttering, forming, curing but excluding cost of reinforcement bars |
| 30 | 1:2:4 concreting |
| 31 | Erection of superstructure of 220 KV towers and anchor tower and their extensions wherever required including all work above ground level excluding hoisting of insulators, hardware & accessories, but including fitting of danger number, phase plates, bird guard and fixing & punching for 220 KV Line. |
| 32 | Tack welding of all bolts up to the height of one section of the tower or 5 meter from ground level whichever is higher with three tacks at 1200 separation of minimum 10mm thickness with lOmm/12mm electrode & application of Zinc rich aluminium paint on the affected surface including cost of all material including tack welding of River Crossing tower & Anchor towers. |
| 33 | Laying, stringing, tensioning clamping, jointing etc of (all 06 Phase) ACSR Zebra conductor including hoisting of insulators, fitting of all necessary hardware and occessorlses i.e, fittings Armour rods, vibration dampers etc. |
| 34 | Laying, stinging, tensioning clamping, jointing etc OPGW including fitting of all necessary hardware and accessories on 220 KV Line. |
| 35 | Grounding work including earth work etc for pipe type grounding including cost of coke & salt. |
| 36 | installation of steel reinforcement bars in RCC foundation including cost of steel reinforcement bars with cutting, bending, placing, bindingetc. |
| 37 | DISMANTLING WORK |
| 38 | Dismantling / de-hoisting of ACSR Zebra conductor of all the 3 phases including de-hoisting of insulators and other accessories etc. between section towers of new 220 KV line protection and section tower.(rate given as single ckt ,taken for double ckt |
| 39 | Dismantling / de-hoisting of opgw |
| 40 | Safe dismantling of towers. |
| 41 | Safe loading, carriage from site, unloading & Stacking of dismantled towers, conductors, earthwire, hardware & accessories etc. at stores or 220 KV Etah |
| 42 | Dismantalling of Earlier foundation which includes Excavation,breaking of foundations upto 2 mtr depth and removing of concrete,cutting,removing of stub and steel reinforcement,bakcfilling,levelling and making field suitable for agriculture Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-3 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-4 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-5 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 5 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents