Road Transport and Highways Government Departments Closing in 15 days TDR #57106470

Tender For Shifting, Conversion And Re Erection Eb Poles In Kattur Side Near Ariyanvoyal In The Main Work Of Construction Of Rob At Km 0/4 Of Minjur - Kattur - Thirupalaivanam Road In Lieu Of Existing Lc No.16 At Railway Km.24/ 16-18 In Between Nandhiyamb

Issued by Government Departments · Thiruvallur, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
07 Sep 2026
15 days left
EMD
12000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Thiruvallur → Tamil Nadu
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Shifting, Conversion And Re Erection Eb Poles In Kattur Side Near Ariyanvoyal In The Main Work Of Construction Of Rob At Km 0/4 Of Minjur - Kattur - Thirupalaivanam Road In Lieu Of Existing Lc No.16 At Railway Km.24/ 16-18 In Between Nandhiyambakkam And Minjur Railway Stations

BOQ

Name of Work:- Shifting, Conversion and Re erection EB Poles in Kattur side near Ariyanvoyal in the main work of Construction of ROB at Km 0/4 of Minjur - Kattur – Thirupalaivanam Road in Lieu of existing LC No.16 at Railway Km.24/ 16-18 in between Nandhiyambakkam and Minjur Railway Stations
Sl. No. Item Description
1Supply,laying and commisioning of PSC 9.0 mtr pole 400KG WL including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting,laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
2Road B
3Supply,laying and commisioning of PSC 8.0 mtr pole including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting,laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
4Road B
5Supply,laying and commisioning of Base Plate including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
6Road B
7Supply,laying and fixing of 11KV 'V' Cross arm 4-6' including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
8Road B
9Supply,laying and fixing of 11KV TI fittings including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
10Road B
11Supply,laying and fixing of 11 KV Pin with Pin Insulators including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
12Road B
13Supply,laying and fixing of 11 KV Polymer disc with MP including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
14Road B
15Supply,laying and fixing of 1 KV Tapping Channel Cross Arm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
16Road B
17Supply,laying and fixing of AAAC7/3.15 sq mm conductor including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
18Road B
19Supply,laying and fixing of LT 3 ph. Cross arm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
20Road B
21Supply,laying and fixing of LT Pin Insulator with pin including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
22Road B
23Supply,laying and fixing of LT Shackle with metal parts including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
24Road B
25Supply,laying and fixing of Aluminium knob including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
26Road B
27Supply,laying and fixing of Back clamp for PSC 8.0 mtr Pole including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
28Road B
29Supply,laying and fixing of Back clamp for PSC 9.0 mtr Pole including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
30Road B
31Supply,laying and fixing of AAAC 7/2.59 sq mm conductor including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
32Road B
33Supply,laying and fixing of Stayset complete including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
34Road B
35Supply,laying and fixing of Pole Earthing including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
36Road B
37Supply,laying and fixing of Pole Concreting including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
38Road B
39Supply,laying and fixing of Bolts & Nuts including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
40Road B
41Supply,laying and fixing of 11 KV 3x300 sq.mm UG Cable including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
42Road B
43Supply,laying and fixing of 11 KV 3x300 sq.mm O/D Termination Kit (HS Type) including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
44Road B
45Supply,laying and fixing of 11 KV Trough including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
46Road B
47Supply,laying and fixing of LT UG cable 4*240 sq mm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
48Road B
49Supply,laying and fixing of Alum Lugs 240 sq mm including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
50Road B
51Supply,laying and fixing of 4 way HRC Fuse pillar box including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
52Road B
53Supply,laying and fixing of Concreting & Earthing for 6/4 way pillar box including cost and conveyance of materials, storage charges including conveyance of all materials to work site, erecting, laying as shown in the drawings, including hire charges for tools and plants, including labour charges and all other incidental charges thereto etc., complete as per the TANGEDCO norms and specifications
54Road B
55Calculation of SubTotal, GST and Total Amount carried out by system automatically
56Basic cost of value put to tender as per estimate
57Add GST at 18%
58Total Value put to Tender
59Quoted value
60Final Quoted Value
61Add GST at 18% of Final Quoted Value
62Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information
63Total Value of Contract Including 18% of GST Basic cost of value put to tender as per Estimate Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57106470
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 07-09-2026
Authority
Authority Name highways department
Work Description Tender For Shifting, Conversion And Re Erection Eb Poles In Kattur Side Near Ariyanvoyal In The Main Work Of Construction Of Rob At Km 0/4 Of Minjur - Kattur - Thirupalaivanam Road In Lieu Of Existing Lc No.16 At Railway Km.24/ 16-18 In Between Nandhiyambakkam And Minjur Railway Stations
Basic Detail
Tender No 03/2026-27/JDO/DATED 19.08.2026
Bidding Type Tender
Location
City Thiruvallur
State Tamil Nadu
Key Dates
Publish Date 19 Aug 2026
Submission Date 07 Sep 2026
Open Date 08 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 12000
Exemption Not Available
Document List
79d32033-1704-4900-9cb2-69201c17421f.html
BOQ_836501.xls
Tendernotice_1.pdf
Tender_Document_TN_03_Sl_01.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 19, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 15 days
Sep 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 16 days

Tender Documents

Download All (ZIP) ↓
html

79d32033-1704-4900-9cb2-69201c17421f.html

xls

BOQ_836501.xls

pdf

Tendernotice_1.pdf

pdf

Tender_Document_TN_03_Sl_01.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders