Tender For Supply Of Lt 1Ph Angle X Arm , Supply Of Lt 1Ph Angle X Arm , 0.6Kva Ups , Lt 1Ph Angle X Arm (Quote Price For Single Unit Only) , Stay Clamp Suitable For 9.00Mtr Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25

Issued by Boards / Undertakings / PSU · Pudukkottai, Tamil Nadu
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Aug 2026
2 days left
EMD
12000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Pudukkottai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender For Supply Of Lt 1Ph Angle X Arm , Supply Of Lt 1Ph Angle X Arm , 0.6Kva Ups , Lt 1Ph Angle X Arm (Quote Price For Single Unit Only) , Stay Clamp Suitable For 9.00Mtr Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Loading/ Unloading Of Ht Polymer Insulators , Loading/ Unloading Of Lt Hardwares( Metal Parts) , Loading/ Unloading Of Ht Hardwares , Stay Pit , Loading/ Unloading Of Single Phase Meters , Loading/ Unloading Of Three Phase Meters , Loading/ Unloading Of 16 Kva Transformers , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Loading/ Unloading Of 25 Kva Transformers , Loading/ Unloading Of 63 Kva Transformers , Stay Set , Loading/ Unloading Of 100 Kva Transformers , Loading/ Unloading Of 200/250 Kva Transformers , Loading/ Unloading Of 500 Kva Transformers , Uncoiling Of Conductor Drum , Erection Of Line Materials , Loading/ Unloading Of Oil Drums With Oil , Loading/ Unloading Of Oil Drums Without Oil , Loading/ Unloading Of 11Kv Vacuum Circuit Breaker , Loading/ Unloading Of 33Kv Vacuum Circuit Breaker , Loading/ Unloading Of 110Kv Vacuum Circuit Breaker , Loading/ Unloading Of 11Kv Ab Switch , Loading/ Unloading Of 22Kv Ab Switch , Loading/ Unloading Of Double Break Ab Switch , Loading/ Unloading Of 11/22Kv Ct / Pt , Loading/ Unloading Of 11/22Kv Metering Set , Loading/ Unloading Of 33Kv Metering Set , Fixing Of Ht Pin Insulator / Strain Disc , Loading/ Unloading Of Hvds Structure Materials , Loading/ Unloading Of 11/22Kv Las , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pin Strain Disc/Polymer Disc With Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Tubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X 0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Of Hg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangement Double , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Reinforced Cement Concrete / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 W S.V. Lamp / Mercury Lamp/Led Yard Light Fitting Including Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt [ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt [ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Of Coconut Tree , Clearing Tree Branches Of Neem, Tamarind, Country Tree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Reinforced Cement Concrete / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Reinforced Cement Concrete /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Reinforced Cement Concrete / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof [ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Or Near To Work Spot At Road Side By Using Private Vehicle Or Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Or Near To Work Spot At Road Side By Using Private Vehicle Or Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicle Load Of One No.Minimum Up To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicle Load Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Reinforced Cement Concrete / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantling Of 3[1/2] V X Arm , Dismantling Of Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kv Strain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kv Strain Disc With Hardware , Dismantling Of Lt Pin Insulator With Pin , Dismantling Of Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductor Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductor Acsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter

BOQ

Name of Work:- SUPPLY OF LT 1PH ANGLE X ARM
Sl. No. Item Description
1SUPPLY OF LT 1PH ANGLE X ARM
20.6KVA UPS
3LT 1PH ANGLE X ARM (QUOTE PRICE FOR SINGLE UNIT ONLY)
4STAY CLAMP SUITABLE FOR 9.00MTR PSC POLE
5Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr
6Loading/ Unloading of HT Polymer Insulators
7Loading/ Unloading of LT hardwares( Metal Parts)
8Loading/ Unloading of HT Hardwares
9Stay pit
10Loading/ Unloading of Single Phase Meters
11Loading/ Unloading of Three Phase Meters
12Loading/ Unloading of 16 KVA Transformers
13Erection of poles & stays (Including refilling of excavated earth)
14Loading/ Unloading of 25 KVA Transformers
15Loading/ Unloading of 63 KVA Transformers
16Stay set
17Loading/ Unloading of 100 KVA Transformers
18Loading/ Unloading of 200/250 KVA Transformers
19Loading/ Unloading of 500 KVA Transformers
20Uncoiling of Conductor Drum
21Erection of LINE MATERIALS
22Loading/ Unloading of Oil Drums with Oil
23Loading/ Unloading of Oil Drums Without oil
24Loading/ Unloading of 11KV Vacuum Circuit Breaker
25Loading/ Unloading of 33KV Vacuum Circuit Breaker
26Loading/ Unloading of 110KV Vacuum Circuit Breaker
27Loading/ Unloading of 11KV AB Switch
28Loading/ Unloading of 22KV AB switch
29Loading/ Unloading of Double Break AB Switch
30Loading/ Unloading of 11/22KV CT / PT
31Loading/ Unloading of 11/22KV Metering Set
32Loading/ Unloading of 33KV Metering Set
33FIXING OF HT PIN INSULATOR / STRAIN DISC
34Loading/ Unloading of HVDS Structure Materials
35Loading/ Unloading of 11/22KV LAS
3622 KV Pin insulator with pin
3722 KV Strain disc / polymer disc with hardware
3833 KV Pin insulator with pin
3933 KV Pin Strain disc/polymer disc with hardware
40Fixing of LT Pin insulator with pin
41LT Shakle with hardware
42Fixing of Aluminium knob
43Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run
44Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
45ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
46ACSR 7/4.09 mm
47Above 7/4.09 mm ACSR & DOG conductor
48Earthing wiring and connection including transporting of earth pipe and excavation of pit]
49Transformer structure earthing 10ft depth - 3 nos of pipe through Tubes
50DP earthing including all works [double side earthing]
51Erection of 4th Earth pipe including earthing
52Earthing of poles
53Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub.
54Replacement of detoriated earth pipe per location
55Concreting with Mixture 1:3:6 [including All materials].
56Mass Concreting for centre support for 2 feet including all materials
57Mass concreting for pole0.6x0.6x1.25M.with coping
58Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping
59Sleeve concreting for stay set 0.3 m & 0.75 long
60Erection of Distribution Transformer Structure Complete
61Excavation of structure pole Pits 0.9 X 0.9 X 1.83 Mtr
62Transporting of pole to pit location 2 Nos.
63Erection of poles 2 Nos
64Excavation of stay pit 4 Nos
65Erection of stay set (4 sets)
66Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos.
67Erection of 22 KV AB Switch
68Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes
69Erection of Top Channel
70Bed Channel [2 nos channel] Erection
71Cross with stud for bed channel Erection
72Erection of belting angle / HG fuse angle
73Erection of HG fuse Set
74Erection of HT LAS with jumpering and earthing
75Erection of LT LAS with jumbering and earthing
76Erection of Jumpering [HT Side]
77Transformer wiring in LT side including Jumpering Bus bar etc.
78Erection LT open type fuse unit arrangement single
79Erection LT open type fuse unit arrangement Double
80Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint).
81Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint)
82Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem]
83Painting name of SS at seating channel including paint.
84Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint.
85DT metering arrangement (without materials)
86Erection of distribution Transformer /dismantling of DT
87Upto 100 KVA
88above 100 KVA and Upto 250 KVA
89500 KVA
90Colour washing of RCC / PSC poles
91Numbering of poles including cost of paint / loc [black background and yellow letters]
92Painting of SC details in the meter board / Agl boxes / Hut SCs including paint.
93SERVICE CONNECTION
94Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling
95Transporting of required materials from road side to work spot and erection of 250 W S.V. lamp / Mercury lamp/LED Yard Light Fitting including wiring, clamping of pipe, serial board assembling etc.
96Fixing of street light fitting with 2 CFL/ 4 CFL
97Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc.
98Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot
99Erection/dismantling of metering set 11 KV / 22 KV/33 KV
100Fabrication Works.
101Labour charges for alteration of back clamp / stay clamp to suitable for works.
102Providing of Holes.
103All size angles / channel upto 5/8\\"
104All size angles / channel above 5/8\\"
105Slot holes in flat / angles / channel upto 3/4\\"
106Slot holes in flat / angles / channel above 3/4\\"
107Fabrication of centre support only for DT structure
108Cutting of RS Joist / Angles / MS Channels
109Welding of RS Joist / Angles / MS Channels
110GENERAL
111Set right the leaning pole in both HT & LT [ pin point ] location
112Set right the leaning pole in both HT & LT [ cut point ] location
113Resagging of lines for all sizes cut point location
114Converting pin point into cut point HT lines
115Converting pin point into cut point LT lines
116Clearing tree branches of coconut tree
117Clearing tree branches of Neem, tamarind, country tree etc.,
118Releasing and erection 1 ph SC wire [during conductor or support change]
119Releasing and erection 3 ph SC wire [during conductor or support change]
120Destruction of pole concerting at site.
121Retrieving grill from detoriated pole [grill separate from damaged pole]
122Re earthing of structure completely including earthpipe changing if any 3nos earth pipe
123Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe )
124Guarding Arrangement :-
125Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ]
126Flat guarding with 4 wire
127Split Netural Guarding
128LOADING AND UNLOADING :
129Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ]
130Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ]
131Unloading of PSC / RCC / Metal Poles
132TRANSPORTING FROM ROAD SIDE TO WORKSPOT
133Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km
134Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof [ certified by AEE ]
135Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km
136Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof
137TRANSPORT OF LINE MATERIALS
138Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading Upto 8 kms
139Transport of line Materials [ minimum 1 MT ] from sub stores to section pocket store or near to work spot at road side by using private vehicle or vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM
140TRANSPORT OF EQUIPEMENTS
141Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum Up to 30 Km
142.Transporting of Distribution Transformer/Metering set by using private vehicle load of one No.Minimum above 30 Km for every addl .1 KM
143DISMANTLING WORKS
144Dismantling of 7.5m / 8.0m poles [RCC / PSC]
145Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles
146Dismantling stay set complete
147Dismantling of LT 1 ph \\"X\\" Arm / LT/HT TI Fitting
148Dismantling of LT/HT TI Fitting
149Dismantling of LT 3 ph \\"X\\" Arm
150Dismantling of 3[1/2]' V ` X ' arm
151Dismantling of Tapping channel and Guarding X Arm
152Dismantling of 11 KV strain disc/polymer disc with hardware
153Dismantling of 22 KV Pin insulator with pin
154Dismantling of 22 KV Strain disc with hardware
155Dismantling of 33 KV Pin insulator with pin
156Dismantling of 33 KV Strain disc with hardware
157Dismantling of LT Pin insulator with pin
158Dismantling of LT Shackle with hardware
159Dismantling of Aluminium knob
160Dismantling of Conductor 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm
161Dismantling of Conductor ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm
162Dismantling of Conductor ACSR 7/4.09 mm
163SINGLE PHASE METER &3 PHASE METER
164Fixing of single phase meter
165Fixing of 3 phase meter
166Dismantling of single phase meter
167Dismantling of 3 phase meter Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57106434
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 25-08-2026
Authority
Authority Name Tamil Nadu Generation And Distribution Corporation Limited
Work Description Tender For Supply Of Lt 1Ph Angle X Arm , Supply Of Lt 1Ph Angle X Arm , 0.6Kva Ups , Lt 1Ph Angle X Arm (Quote Price For Single Unit Only) , Stay Clamp Suitable For 9.00Mtr Psc Pole , Pole Pit For 9.0M And 9.14 M Psc/Rcc / All Metal Poles (Each Pit) 1.25 X 0.6 X 1.83 Mtr , Loading/ Unloading Of Ht Polymer Insulators , Loading/ Unloading Of Lt Hardwares( Metal Parts) , Loading/ Unloading Of Ht Hardwares , Stay Pit , Loading/ Unloading Of Single Phase Meters , Loading/ Unloading Of Three Phase Meters , Loading/ Unloading Of 16 Kva Transformers , Erection Of Poles & Stays (Including Refilling Of Excavated Earth) , Loading/ Unloading Of 25 Kva Transformers , Loading/ Unloading Of 63 Kva Transformers , Stay Set , Loading/ Unloading Of 100 Kva Transformers , Loading/ Unloading Of 200/250 Kva Transformers , Loading/ Unloading Of 500 Kva Transformers , Uncoiling Of Conductor Drum , Erection Of Line Materials , Loading/ Unloading Of Oil Drums With Oil , Loading/ Unloading Of Oil Drums Without Oil , Loading/ Unloading Of 11Kv Vacuum Circuit Breaker , Loading/ Unloading Of 33Kv Vacuum Circuit Breaker , Loading/ Unloading Of 110Kv Vacuum Circuit Breaker , Loading/ Unloading Of 11Kv Ab Switch , Loading/ Unloading Of 22Kv Ab Switch , Loading/ Unloading Of Double Break Ab Switch , Loading/ Unloading Of 11/22Kv Ct / Pt , Loading/ Unloading Of 11/22Kv Metering Set , Loading/ Unloading Of 33Kv Metering Set , Fixing Of Ht Pin Insulator / Strain Disc , Loading/ Unloading Of Hvds Structure Materials , Loading/ Unloading Of 11/22Kv Las , 22 Kv Pin Insulator With Pin , 22 Kv Strain Disc / Polymer Disc With Hardware , 33 Kv Pin Insulator With Pin , 33 Kv Pin Strain Disc/Polymer Disc With Hardware , Fixing Of Lt Pin Insulator With Pin , Lt Shakle With Hardware , Fixing Of Aluminium Knob , Paving Stringing And Sagging Of Conductor Including Binding Of Pin And Proper Tight [Including Transport Of Condutor From Road Side To Work Spot] Per Run , Upto 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Acsr 7/4.09 Mm , Above 7/4.09 Mm Acsr & Dog Conductor , Earthing Wiring And Connection Including Transporting Of Earth Pipe And Excavation Of Pit] , Transformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Tubes , Dp Earthing Including All Works [Double Side Earthing] , Erection Of 4Th Earth Pipe Including Earthing , Earthing Of Poles , Earth Pit Masonary Work 3 Nos Earth Pits Or Using 3 Nos Concrete Tub. , Replacement Of Detoriated Earth Pipe Per Location , Concreting With Mixture 1:3:6 [Including All Materials]. , Mass Concreting For Centre Support For 2 Feet Including All Materials , Mass Concreting For Pole0.6X0.6X1.25M.With Coping , Sleeve Concreting For Pole 0.6 M X 0.6M X 0.3 M With Coping , Sleeve Concreting For Stay Set 0.3 M & 0.75 Long , Erection Of Distribution Transformer Structure Complete , Excavation Of Structure Pole Pits 0.9 X 0.9 X 1.83 Mtr , Transporting Of Pole To Pit Location 2 Nos. , Erection Of Poles 2 Nos , Excavation Of Stay Pit 4 Nos , Erection Of Stay Set (4 Sets) , Mass Concreting (Cement:Sand:Jelly Supplied By The Contractor) 2 Nos. , Erection Of 22 Kv Ab Switch , Ttransformer Structure Earthing 10Ft Depth - 3 Nos Of Pipe Through Earth Tubes , Erection Of Top Channel , Bed Channel [2 Nos Channel] Erection , Cross With Stud For Bed Channel Erection , Erection Of Belting Angle / Hg Fuse Angle , Erection Of Hg Fuse Set , Erection Of Ht Las With Jumpering And Earthing , Erection Of Lt Las With Jumbering And Earthing , Erection Of Jumpering [Ht Side] , Transformer Wiring In Lt Side Including Jumpering Bus Bar Etc. , Erection Lt Open Type Fuse Unit Arrangement Single , Erection Lt Open Type Fuse Unit Arrangement Double , Painting Of Stru. Complete Excluding Dt [Two Coat Of Red Oxide] All Metal Parts(Excluding Cost Of Paint). , Painting Of Stru. Complete Excluding Dt [One Coat Alu Paint, Excluding Cost Of Paint) , Colour Washing Of 2 Numbers Structure Pole [Excluding Cost Of Distember / Snowsem] , Painting Name Of Ss At Seating Channel Including Paint. , Painting Of Dt Alone [Excluding Painting] With Red Oxide And Double Coating Of Aluminium Paint. , Dt Metering Arrangement (Without Materials) , Erection Of Distribution Transformer /Dismantling Of Dt , Upto 100 Kva , Above 100 Kva And Upto 250 Kva , 500 Kva , Colour Washing Of Reinforced Cement Concrete / Psc Poles , Numbering Of Poles Including Cost Of Paint / Loc [Black Background And Yellow Letters] , Painting Of Sc Details In The Meter Board / Agl Boxes / Hut Scs Including Paint. , Service Connection , Transporting Of Required Materials From Road Side To Work Spot And Erection Of Street Light Fixture Including Wiring Clamping Of Pipe Aerial Board Assembling , Transporting Of Required Materials From Road Side To Work Spot And Erection Of 250 W S.V. Lamp / Mercury Lamp/Led Yard Light Fitting Including Wiring, Clamping Of Pipe, Serial Board Assembling Etc. , Fixing Of Street Light Fitting With 2 Cfl/ 4 Cfl , Provision Of St. Lt. Switching Arrangements Including Fixing Meters, Wiring, Service Board Etc. , Erection Of Hut Service Connection Complete With / Without Meter Including Transport Of 5Materials From Section Store To Work Spot , Erection/Dismantling Of Metering Set 11 Kv / 22 Kv/33 Kv , Fabrication Works. , Labour Charges For Alteration Of Back Clamp / Stay Clamp To Suitable For Works. , Providing Of Holes. , All Size Angles / Channel Upto 5/8 , All Size Angles / Channel Above 5/8 , Slot Holes In Flat / Angles / Channel Upto 3/4 , Slot Holes In Flat / Angles / Channel Above 3/4 , Fabrication Of Centre Support Only For Dt Structure , Cutting Of Rs Joist / Angles / Ms Channels , Welding Of Rs Joist / Angles / Ms Channels , General , Set Right The Leaning Pole In Both Ht & Lt [ Pin Point ] Location , Set Right The Leaning Pole In Both Ht & Lt [ Cut Point ] Location , Resagging Of Lines For All Sizes Cut Point Location , Converting Pin Point Into Cut Point Ht Lines , Converting Pin Point Into Cut Point Lt Lines , Clearing Tree Branches Of Coconut Tree , Clearing Tree Branches Of Neem, Tamarind, Country Tree Etc., , Releasing And Erection 1 Ph Sc Wire [During Conductor Or Support Change] , Releasing And Erection 3 Ph Sc Wire [During Conductor Or Support Change] , Destruction Of Pole Concerting At Site. , Retrieving Grill From Detoriated Pole [Grill Separate From Damaged Pole] , Re Earthing Of Structure Completely Including Earthpipe Changing If Any 3Nos Earth Pipe , Re Examination Of Dt Earthing ( Digging , Inspection And Making Connection In Between Extg. 3Nos Earth Pipe ) , Guarding Arrangement :- , Cradle Guarding Including Earthing And Earth Pit Excavation [Railway & P&T Crossing ] , Flat Guarding With 4 Wire , Split Netural Guarding , Loading And Unloading : , Loading Of 7.5 Mtr / 8.0 Mtr Reinforced Cement Concrete / Psc/ Metal Pole [Per Pole ] , Loading Of [ 9.14 Mtr ] 9.0 Mtr Poles Reinforced Cement Concrete /Psc Pole / Metal Pole [ Per Pole ] , Unloading Of Psc / Reinforced Cement Concrete / Metal Poles , Transporting From Road Side To Workspot , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Upto 1.0 Km , Transport 7.5 Mtrs / 8.00 Mtrs Of Poles Including R.S.Joist And Rail Poles Above Additional 1.0 Km Or Part Thereof [ Certified By Aee ] , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto 1.0 Km , Transport Of 9.0 Mtr And Above Poles Including R.S. Joist And Rail Poles Upto Above Additional 1.0 Km Or Part Thereof , Transport Of Line Materials , Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Or Near To Work Spot At Road Side By Using Private Vehicle Or Vice Versa Excluding Loading And Unloading Upto 8 Kms , Transport Of Line Materials [ Minimum 1 Mt ] From Sub Stores To Section Pocket Store Or Near To Work Spot At Road Side By Using Private Vehicle Or Vice Versa Excluding Loading And Unloading Above 8 Kms And For Every Addl. 1 Km , Transport Of Equipements , Transporting Of Distribution Transformer/Metering Set By Using Private Vehicle Load Of One No.Minimum Up To 30 Km , .Transporting Of Distribution Transformer/Metering Set By Using Private Vehicle Load Of One No.Minimum Above 30 Km For Every Addl .1 Km , Dismantling Works , Dismantling Of 7.5M / 8.0M Poles [Rcc / Psc] , Dismantling Of 9.00M / 9.14M Reinforced Cement Concrete / Psc/Rail Pole, Tubular Pole And All Metal Poles , Dismantling Stay Set Complete , Dismantling Of Lt 1 Ph X Arm / Lt/Ht Ti Fitting , Dismantling Of Lt/Ht Ti Fitting , Dismantling Of Lt 3 Ph X Arm , Dismantling Of 3[1/2] V X Arm , Dismantling Of Tapping Channel And Guarding X Arm , Dismantling Of 11 Kv Strain Disc/Polymer Disc With Hardware , Dismantling Of 22 Kv Pin Insulator With Pin , Dismantling Of 22 Kv Strain Disc With Hardware , Dismantling Of 33 Kv Pin Insulator With Pin , Dismantling Of 33 Kv Strain Disc With Hardware , Dismantling Of Lt Pin Insulator With Pin , Dismantling Of Lt Shackle With Hardware , Dismantling Of Aluminium Knob , Dismantling Of Conductor 7/2.59 Mm Acsr, 7/2.50 Aaac Including Pvc Cable Upto 25 Sqmm , Dismantling Of Conductor Acsr 7/3.35Mm & 7/ 3.15 Aaac Including Pvc Cable Above 25 Sqmm , Dismantling Of Conductor Acsr 7/4.09 Mm , Single Phase Meter &3 Phase Meter , Fixing Of Single Phase Meter , Fixing Of 3 Phase Meter , Dismantling Of Single Phase Meter , Dismantling Of 3 Phase Meter
Basic Detail
Tender No Enq No 18/2026-27
Bidding Type Tender
Location
City Pudukkottai
State Tamil Nadu
Key Dates
Publish Date 19 Aug 2026
Submission Date 25 Aug 2026
Open Date 27 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 12000
Exemption Available
Document List
1PhAngleNew.pdf
b07d11aa-45cc-4629-a0b1-30ce01212b17.html
BOQ_836508.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 19, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 2 days
Aug 27, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 4 days

Tender Documents

Download All (ZIP) ↓
pdf

1PhAngleNew.pdf

html

b07d11aa-45cc-4629-a0b1-30ce01212b17.html

xls

BOQ_836508.xls

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders