Water Resources and Irrigation Government Departments Closing in 7 days TDR #57104991

Tender For Design Flood Review And Hydrology:- Studycollect And Analyze Historical Rainfall, Catchment Area Characteristics, And Streamflow Data.Perform Frequency Analysis To Review And Update The Inflow Design Flood (Idf) And Maximum Probable Flood (Mpf)

Issued by Government Departments · mirzapur, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
31 Aug 2026
7 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Offline

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
mirzapur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender For Design Flood Review And Hydrology:- Studycollect And Analyze Historical Rainfall, Catchment Area Characteristics, And Streamflow Data.Perform Frequency Analysis To Review And Update The Inflow Design Flood (Idf) And Maximum Probable Flood (Mpf) For The Dam.Route The Design Floods Through The Reservoir To Check Spillway Capacity Adequacy. 3. Dam Break Analysis (Dba):- Perform Mathematical Modeling (Using 1D/2D Tools Like Hec-Ras) For Fair-Weather And Monsoon Failure Scenarios.Determine Breach Parameters (Formation Time, Final Breach Size, And Shape).Generate Peak Outflow Hydrographs, Travel Time Of Flood Waves, Maximum Water Depths, And Flow Velocities Along The Downstream Valley.Develop Gis-Based High-Resolution Flood Inundation And Risk-Mapping Layers. Emergencv Action Plan (Eap):- Formulate A Structured Eap Defining Different Emergency Levels (From Unusual Events To Imminent Failure).Establish Clear Notification Flowcharts, Call-Down Rosters, And Communication Channels Linking The Dam Operator. District Administration, And Disaster Management Forces.Outline Actionable Local Evacuation Plans And Safe Assembly Points For Vulnerable Downstream Habitations. 4. Operation And Maintenance (O&M) Manual:- Review Cxisting Opcrational Protocols And Draft A Comprehensive, Updated O&M Manual.Include Guidelines For Routine Gate Operations, Structural Health Monitoring, Spillway Maintenance, And Electrical/Mechanical Upkeep. :- Design Flood Review (Dfr) Operation And Maintenance Manual Emergency Action Plan (Eap) Hazard Potentiol. Seismic Design Paraincters Dam Break Analysis Rule Curve & Spillway Rating Curve Design Flood Review (Dfr) Operation And Maintenance Manual Emergency Action Plan (Eap) Hazard Potentiol Seismic Design Paraincters Dam Break Analysis Rule Curve & Spillway Rating Curve Design Flood Review (Dfr) Operation And Maintenance Manual Emergency Action Plan (Eap) Hazard Potentiol Seismic Design Paraincters Dam Break Analysis Rule Curve & Spillway Rating Curve Design Flood Review (Dfr) Operation And Maintenance Manual Emergency Action Plan (Eap) Hazard Potentiol Seismic Design Paraineters Dam Break Analysis Rule Curve & Spillway Rating Curve Design Flood Review (Dfr) Operation And Maintenance Manual Emergency Action Plan (Eap) Hazard Patentiol Seismic Design Paraincters Dam Break Analysis Rule Curve & Spillway Rating Curve

Tender Timeline

Aug 20, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Offline submission at the designated office.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

8df50fc3-1057-4e63-a5b4-5e4faf747755.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders