Bids Are invited for Repair And Overhauling Service - Forklifts (V2) As Per Is 6765:2003 And Is 10517; Godrej; Yes; Service Provider Premises - Servicing Of Engine Including Replacment Of Worn Out Component With New Comopnent To Be Supplied By Contra
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Forklifts (V2) As Per Is 6765:2003 And Is 10517; Godrej; Yes; Service Provider Premises - Servicing Of Engine Including Replacment Of Worn Out Component With New Comopnent To Be Supplied By Contractor , Transmission System Overhauling Including Replacement Of Worn Out Component With New Component To Be Supplied By Contractor. , Upright Movement Overhauling Including Replacement Of Worn Out Component With New Component To Be Supplied By Contractor. , Steering System Overhauling Including Replacement Of Worn Out Component With New Component To Be Supplied By Contractor. , Supply Of Steering Tyre And Replacing The New Tyre With Worn Out Steering Tyres , Overhauling Of Drive Axle , Overhauling Of Breaking System Including Replacement Of Worn Out Component With New Component To Be Supplied By Contractor. I.E. Brake Liner, Brake Oil, O-Rings, Piston Etc. , Supply Of Driver Tyre And Replacing New Tyres With Worn Out Driver Tyres Including Replacing Rim Net And Bolts. , Overhauling Of Hydraulic System Including Replacement Of Worn Out Component With New Component To Be Supplied By Contractor I.E. Replacement Of Hydraulic Oil And Hydraulic And Transmission Hoses Including Replacing Other Worn Out Parts. , Supply Of Seat Belt, Reverse Horn And Emplacement Of Old Parts With New Parts , Complete Inspection Of Electrical System Including Supply And Replacement Of Worn Out Component With New Component To Be Supplied By Contractor, I.E. Supply Of Ignition Switch, Fuses And Replacement Of Old Parts With New Parts. Electric System Check-Up And Replacing Of Worn Out Parts , Transportation Of Fork Lift From R&D Center To Work Place And Returning Back To R&D By Trailer / Truck
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Servicing of Engine including replacment of worn out component with new comopnent to be supplied by contractor | Servicing of Engine including replacment of worn out component with new comopnent to be supplied by contractor |
| 2 | Transmission system overhauling including replacement of worn out component with new component to be supplied by contractor. | Transmission system overhauling including replacement of worn out component with new component to be supplied by contractor. |
| 3 | Upright movement overhauling including replacement of worn out component with new component to be supplied by contractor. | Upright movement overhauling including replacement of worn out component with new component to be supplied by contractor. |
| 4 | Steering System Overhauling including replacement of worn out component with new component to be supplied by contractor. | Steering System Overhauling including replacement of worn out component with new component to be supplied by contractor. |
| 5 | Supply of steering tyre and replacing the new tyre with worn out steering tyres | Supply of steering tyre and replacing the new tyre with worn out steering tyres |
| 6 | Overhauling of Drive Axle | Overhauling of Drive Axle |
| 7 | Overhauling of Breaking System including replacement of worn out component with new component to be supplied by contractor. i.e. Brake liner, brake oil, O-rings, piston etc. | Overhauling of Breaking System including replacement of worn out component with new component to be supplied by contractor. i.e. Brake liner, brake oil, O-rings, piston etc. |
| 8 | Supply of driver tyre and replacing new tyres with worn out driver tyres including replacing rim net and bolts. | Supply of driver tyre and replacing new tyres with worn out driver tyres including replacing rim net and bolts. |
| 9 | Overhauling of hydraulic system including replacement of worn out component with new component to be supplied by contractor i.e. replacement of hydraulic oil and hydraulic and transmission hoses including replacing other worn out parts. | Overhauling of hydraulic system including replacement of worn out component with new component to be supplied by contractor i.e. replacement of hydraulic oil and hydraulic and transmission hoses including replacing other worn out parts. |
| 10 | Supply of seat belt, reverse horn and emplacement of old parts with new parts | Supply of seat belt, reverse horn and emplacement of old parts with new parts |
| 11 | Complete inspection of electrical system including supply and replacement of worn out component with new component to be supplied by contractor, i.e. supply of ignition switch, fuses and replacement of old parts with new parts. Electric System Check-up and replacing of worn out parts | Complete inspection of electrical system including supply and replacement of worn out component with new component to be supplied by contractor, i.e. supply of ignition switch, fuses and replacement of old parts with new parts. Electric System Check-up and replacing of worn out parts |
| 12 | Transportation of fork lift from R&D center to work place and returning back to R&D by trailer / truck | Transportation of fork lift from R&D center to work place and returning back to R&D by trailer / truck |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 17 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender