Tender For Re-Construction Of Damaged Footpath By Constructed The Footpath As Per Chandigarh Master Plan 2031 Infront Of Ccet Collage Sector 26 Chandigarh.
Tender Overview
Project Description
Tender for Re-Construction Of Damaged Footpath By Constructed The Footpath As Per Chandigarh Master Plan 2031 Infront Of Ccet Collage Sector 26 Chandigarh.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 19-Aug-2026 | regarding Unit of BOQ | Other | 27-Aug-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Taking out existing kerb stones of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. DSR 16.82 |
| 2 | Taking out existing channel of all types from footpath/ central verge, including removal of mortar etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 3 | Taking out existing PCC Tiles from footpath/ central verge, including removal of rubbish etc., disposal of unserviceable material to the dumping ground, for which payment shall be made separately and stacking of serviceable material within 50 metre lead as per direction of Engineer-in-Charge. |
| 4 | Laying at or near ground level old kerb stones of all types in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. |
| 5 | Providing and Laying of kerb of size 2’-0” x 9” having 4” thickness at bottom and 3” thickness at top and made of plain cement concrete 1:2:4 duly vibrated and compacted. The rates also includes fixing in position at or near ground level in position to the required line, level and curvature, jointed with cement mortar 1:3 (1 cement : 3 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. |
| 6 | Laying at or near ground level old channel of all types in position to the required line, level and curvature, jointed with cement mortar 1:4 (1 cement : 4 coarse sand), including making joints with or without grooves (thickness of joints, except at sharp curve, shall not be more than 5 mm), including making drainage opening wherever required etc. complete as per direction of Engineer-in-charge. |
| 7 | Providing and fixing Precasting plain cement concrete Channel of size 2'-0\\" x 1'-0\\" x 3\\" thick duly mixed, mechanically & compacted made of PCC 1:2:4 duly cured and finished. The rates is to be fixed over 20mm thick cement sand mortar 1:4 including grouting of joints complete in all respect to the entire satisfaction of Engineer -in-charge |
| 8 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size) DSR 4.1.10 |
| 9 | Providing and fixing 100 x 100 x 75 mm cobble stone block hand cut and chisel dressed on top, for paving in floors, drains etc. laid over 20mm thick base mortar 1:4 (1 cement : 4 coarse sand) with joints 10mm wide filled with same mortar including ruled pointing etc. complete as per direction of engineer-in-charge. |
| 10 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:1½:3 (1 Cement: 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm nominal size) DSR 4.1.2 |
| 11 | Extra for making chequers of approved pattern on cement concrete floors, steps, landing, pavements etc. DSR 11.8 |
| 12 | Carriage of material (1.1) by mechanical transport including loading unloading and stacking complete in all respect using appropriate labour and machinery to carry dispose the building rubbish/ malba/ dismantled and wastes to the Municipal Corporation C&D waste processing plant to an average lead of 12 Km and all lifts to entire satisfaction of Engineer in Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender