Tender For Construction Of Mhc And Laying Of 200Mm Dia Sewer Line With Interlinking With The Trunk Sewer For Improvement Of Sewerage System To Hospital To Administrative Building And Workshop Building Area Of Sainik School, Chandrasekharpur, Bhubanes
Tender Overview
Project Description
Tender for Construction Of Mhc And Laying Of 200Mm Dia Sewer Line With Interlinking With The Trunk Sewer For Improvement Of Sewerage System To Hospital To Administrative Building And Workshop Building Area Of Sainik School, Chandrasekharpur, Bhubaneswar
BOQ
| Sl. No. | Item Description |
| 1 | Cutting asphalt or bituminous road of flexible pavments and disposal of dismantalled materials up a lead of 1000 mtr stacking servicable and unservicable materials separately including cost of all labour, T & P etc. all complete as per the direction of engineer-in-charge. |
| 2 | Supplying all labour and T&P for earth work in all kinds of soil within 50mtr initial lead and 1.5mtr initial lift including rough dressing and breaking of clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3mtr in depth as per direction of Engineer-in-charge. |
| 3 | Earth work in stoney earth and gravels mixed with stone and boulder not exceeding 0.014cum in volume within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layer not exceeding 0.3m in depth and as per specification approved by the department |
| 4 | Removal of cement concrete pipe of sewer gutter 1500 mm dia under the supervision of concerned department including disposal with all lifts and up to a lead of 1000 metres and stacking of serviceable and unserviceable material separately but excluding earth excavation and dismantling of masonry works. |
| 5 | Supplying and Filling well graded sand including watering, ramming, consolidating, dressing, etc. all complete as per specifications and direction of Engineer In-charge for: (including cost of sand). |
| 6 | Cement concrete (1:4:8) with 4cm. Size crusher broken hard Granite metal including cost of all labour, materials with all taxes, lead,T & P etc all complete . |
| 7 | Supplying all materials, labour and T & P for Cement concrete (1:2:4) with 12mm size crusher broken hard granite metal including cost of all labour, materials with all taxes, lead, T & P etc all complete and as per direction of Engineer -in- Charge. |
| 8 | Supplying all material, labour T & P for laying rcc hume pipe at the work site as per direction of the EIC. |
| 9 | 200mm dia RCC Hume Pipe(NP-2) |
| 10 | Supplying fitting fixing laying following SWR PVC pipes & fittin including jointing with rubber ring to wall with supply of nails, bobbins wall plug and cutting the pipes to length and wastage including supply of all materials T&P along with jointing materials, testing the pipe line as per P.H. specification and direction of Engineer-in-charge. |
| 11 | 160 mm OD P.V.C. SWR S/S Pipe (ISI type-A) |
| 12 | Supplying of materials, labour and T&P for filling foundation and plinth with excavated materials etc as per direction of Engineer-in-charge. |
| 13 | Supply all labour,T&P for carriage of surplus earth by mechanical means with a lead of 10Km including Loading and un loading &conractor profit & Labour cess etc all complete as per the direction of Engineer-in-charge |
| 14 | Supplying all materials labour & T&P for constructing of brick masonry ic chambers earth work in excavation in all kinds of soil, 250mm thick K.B. brick work in C.M. (1:5) with K.B. bricks having crushing strength not less than 75kg/cm2, 12mm thick cement plaster in C.M. (1:3) for both inside and outside of brick masonry work with neat cement punning on Top and inside surface area including benching and channelling work with C.C. (1:2:4) with 12mm Hard granite chips of requisite quantity and then plastering with C.M. (1:3) over it and then smooth finish with neat cement punning including cost of RCPC cover slab etc. all complete as per approved P.H.E.D. specification and direction of Engineer-in-charge. |
| 15 | IC Chamber size-(0.90x0.80x0.75) |
| 16 | Supplying all materials, labour, T&P for Construction of RCC Man Hole of different sizes inplace of Brick masonary manhole including dismantling the damaged chamber after complete desludging, providing RCC wall of 200mm thick with cement plaster in CM 1:3 to both inside and outside surface with a floating coat of neat cement punning, provision of RCC slab in cement concrete 1:1.5:3 including cost of MS reinforcement (Double layer reinforcement using 12mm and 10mm tor steel), centring and shuttering, benching and chanelling, earth work in excavation around the chamber and filling the cavity of manhole chamber with sand including disposal of debris/surplus earth from the site within 10 km lead, providing lights and barriers complete as per direction of Engineer-In-Charge including provision of alternative arrangement for smooth flow of the liveline. including fixing of SFRC Cover with frame |
| 17 | Cost for Construction of a RCC MHC of size 1.20 mtr dia x 1.67 mtr depth including cost of SFRC Man Hole Cover with frame base slab, Chanel & Benching, but excluding earth work excavation , refilling & removal of surplus earth etc. |
| 18 | Additional depth of 0.10 mtr or part above1.67 mtr upto2.30 mtr excluding earth work & refilling |
| 19 | Additional depth of 0.10 mtr or part above 2.30 mtr upto 9.00 mtr excluding earth work & refilling |
| 20 | Supplying all materials, labour, T&P for Construction of RCC Man Hole of different sizes inplace of Brick masonary manhole including dismantling the damaged chamber after complete desludging, providing RCC wall of 200mm thick with cement plaster in CM 1:3 to both inside and outside surface with a floating coat of neat cement punning, provision of RCC slab in cement concrete 1:1.5:3 including cost of MS reinforcement (Double layer reinforcement using 12mm and 10mm tor steel), centring and shuttering, benching and chanelling, earth work in excavation around the chamber and filling the cavity of manhole chamber with sand including disposal of debris/surplus earth from the site within 10 km lead, providing lights and barriers complete as per direction of Engineer-In-Charge including provision of alternative arrangement for smooth flow of the liveline. including fixing of SFRC Cover with frame |
| 21 | Cost for Construction of a RCC MHC of size 1.20 mtr dia x 0.90 mtr depth including cost of SFRC Man Hole Cover with frame base slab, Chanel & Benching, but excluding earth work excavation , refilling & removal of surplus earth etc. |
| 22 | Additional depth of 0.10 mtr or part above 0.90 mtr upto 1.50 mtr excluding earth work & refilling |
| 23 | Additional depth of 0.10 mtr or part above 1.50 mtr upto 2.30 mtr excluding earth work & refilling |
| 24 | Supplying all materials, labour, T&P for Re- Construction of RCC Man Hole of different sizes inplace of Brick masonary manhole including dismantling the damaged chamber after complete desludging, providing RCC wall of 200mm thick with cement plaster in CM 1:3 to both inside and outside surface with a floating coat of neat cement punning, provision of RCC slab in cement concrete 1:1.5:3 including cost of MS reinforcement (Double layer reinforcement using 12mm and 10mm tor steel), centring and shuttering, benching and chanelling, earth work in excavation around the chamber and filling the cavity of manhole chamber with sand including disposal of debris/surplus earth from the site within 10 km lead, providing lights and barriers complete as per direction of Engineer-In-Charge including provision of alternative arrangement for smooth flow of the liveline. including fixing of SFRC Cover with frame |
| 25 | Cost for Construction of a RCC MHC of size 1.20 mtr dia x 0.90 mtr depth including cost of SFRC Man Hole Cover with frame base slab, Chanel & Benching, but excluding earth work excavation , refilling & removal of surplus earth etc. |
| 26 | Additional depth of 0.10 mtr or part above 0.90 mtr upto 1.50 mtr excluding earth work & refilling |
| 27 | Additional depth of 0.10 mtr or part above 1.50 mtr upto 2.30 mtr excluding earth work & refilling |
| 28 | Cost for Construction of a RCC MHC of size 1.20 mtr dia x 1.67 mtr depth including cost of SFRC Man Hole Cover with frame base slab, Chanel & Benching, but excluding earth work excavation , refilling & removal of surplus earth etc. |
| 29 | Additional depth of 0.10 mtr or part above 1.67 mtr upto 2.30 mtr excluding earth work & refilling |
| 30 | Additional depth of 0.10 mtr or part above 2.30 mtr upto 9.00 mtr excluding earth work & refilling |
| 31 | Cutting hole through RCCwall for taking Sewer line &makng good the damges. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 11 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 13 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender