Supply Of Supply of FRP ,cover for outside & inside Dust Bin door etc
Tender Overview
Project Description
Supply Of supply of frp ,cover for outside & inside dust bin door etc , supply of frp cover for outside dust bin housing for lhb coaches to drg. no. c&w.lgd.sk. no. 1128 (note :-lh side qty 50% & rh side qty 50%) [ warranty period: 30 months after the date of del ivery ] ] , supply of frp outside dustbin door (l.h / r.h) for lhb coaches as per drg. no. c&w. lgd. s k. no. 1130. (note :-lh side qty 50% & rh side qty 50%) [ warranty period: 30 months after the date of delivery ] ] , supply of frp inside dustbin door (l.h / r.h) for lhb coaches as per drg. no. c&w.lgd.sk. no. 1129. (note :-lh side qty 50% & rh side qty 50%) [ warranty period: 30 months after the date of de livery ] ]
BOQ
| Sl. No. | Item Description |
|---|---|
| 1 | Supply of FRP cover for outside Dust Bin Housing for LHB Coaches to Drg. No. C&W.LGD.SK. No. 1128 (Note :-LH Side Qty 50% & RH Side Qty 50%) [ Warranty Period: 30 Months after the date of del ivery ] ] |
| 2 | Supply of FRP Outside Dustbin Door (L.H / R.H) for LHB coaches as per Drg. No. C&W. LGD. S K. No. 1130. (Note :-LH Side Qty 50% & RH Side Qty 50%) [ Warranty Period: 30 Months after the date of delivery ] ] |
| 3 | Supply of FRP Inside Dustbin Door (L.H / R.H) for LHB coaches as per Drg. No. C&W.LGD.SK. No. 1129. (Note :-LH Side Qty 50% & RH Side Qty 50%) [ Warranty Period: 30 Months after the date of de livery ] ] |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 18 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender