Tender For For The Work Of 11 Kv And 33 Kv Line Shifting Work To Ensure Safety During The Construction Of New Two-Lane Major Bridges Over The Sharda Canal Under Electricity Distribution Division-Puranpur In Fully Deposit Scheme.
Tender Overview
Project Description
Tender for For The Work Of 11 Kv And 33 Kv Line Shifting Work To Ensure Safety During The Construction Of New Two-Lane Major Bridges Over The Sharda Canal Under Electricity Distribution Division-Puranpur In Fully Deposit Scheme.
BOQ
| Sl. No. | Item Description |
| 1 | Carriage of following line material from Store centre-Pilibhit to site including measuring, weighing, loading, unloading at both ends and proper stacking at safe site under EDD- Puranpur (Distance up to 60 Km.) |
| 2 | PCC POLE 8.5 Mtr Long |
| 3 | PCC POLE 9 Mtr Long |
| 4 | PCC Pole 11 mtr. Long |
| 5 | 11 KV T-Off channel |
| 6 | 11 KV Top channel |
| 7 | 33 KV Top channel |
| 8 | Earthing rod |
| 9 | 33 KV Polymer Disc Fitting 45 KN |
| 10 | 33 KV Polymer Disc insulator 70 KN |
| 11 | 11 KV Disc insulator |
| 12 | 11 KV Poly Pin Insulator |
| 13 | 11 KV X-arm V type |
| 14 | Stay set Complete |
| 15 | Stay insulator |
| 16 | Stay wire 7/10 SWG |
| 17 | GI wire 6 SWG |
| 18 | ACSR weasel conductor |
| 19 | 33 KV HT XLPE Cable of size (3x300) SQMM |
| 20 | 33 KV XLPE O/D Cable box (3x300) SQMM |
| 21 | 11 KV XLPE Cable of size (3x185) SQMM |
| 22 | 11 KV XLPE Cable box (3x185) SQMM |
| 23 | Straight through 3x185 SQMM |
| 24 | Erection of the following supports including cutting, making holes, fixing of all types of accessories digging of pits. complete work in all respect, as per RESSPO drawing. |
| 25 | Single PCC Pole 11 mtr. Long. |
| 26 | Double pole structure PCC 8.5 mtr. Long complete |
| 27 | Double pole structure PCC Pole 11 mtr. Long complete |
| 28 | Double pole structure PCC Pole 9 mtr. Long complete |
| 29 | Concreting of supports at the time of erection of pole in 1:4:8 concrete ratio from bottom of pole to ground level and plinthing of supports upto 300mm above ground level by using cement, sand & coarse aggregate in ratio 1:4:8 as per RESSPO drawing with watering/curing properly upto proper setting of plinthing. All matrial would be provided by the contractor. |
| 30 | Erection of stay set with stay wire, stay clamp & stay insulator including with grouting of stay set by concrete of ratio 1:4:8 as per RESSPO norms before back fitting of the pits including binding, climbing, clamping, tightening and nozzeling of stay wire in all respect as per RESSPO norms. All clamps, nuts, bolts, stay insulator, cement. Brick, ballast, sand etc would be provided by the contractor. |
| 31 | Earthing of PCC Poles of the line is to be done by inserting the MS earth rod (1800x20mm) into soil by hammering and properly fastning with GI wire to each support by nut & bolt. Earthing rod must be 0.15Mtr.above from the plinth of the support. All type nut & bolt would be given by the contractor. |
| 32 | Laying and sagging of 3 phase ACSR Weasel conductor from double pole at tapping point of 11 KV feeder line including jumpering, hoisting, fixing of all type of insulators, binding, jointing and its clamping etc in all respect. |
| 33 | Laying of 11 KV XLPE Cable of size (3x185) Sq.MM by drill method using HDPE pipe. complete work in all respect (HDPE pipe wil be provided by the contractor on his cost). |
| 34 | Laying of 33 KV XLPE Cable of size (3x300) Sq.MM by drill method using HDPE pipe. complete work in all respect (HDPE pipe wil be provided by the contractor on his cost). |
| 35 | Hoisting cable on pole by providing MS Pipe 6\\"x3 mtr long required clamped. complete work in all respect. For 11 KV XLPE cable 3x185 sqmm |
| 36 | Hoisting cable on pole by providing MS Pipe 6\\"x3 mtr long required clamped. complete work in all respect. For 33 KV XLPE cable 3x300 sqmm |
| 37 | Termination of 11 KV XLPE Cable box (3x185) SQMM |
| 38 | Termination of 33 KV XLPE O/D Cable box (3x300) SQMM |
| 39 | Fixing of Straight through 3x185 SQMM |
| 40 | Guarding Of 11 KV Line Road/River Crossing Etc. By Providing G.S Earth Wire 6 S.W.G And Making Net With Different Of 1 Meter Completely Including Fixing Of Channel/Angle Etc. With Proper Locking At Each Support. All Type Of Nut And Bolt Would Be Given By The Contractor (G.I. Wire Will Be Provided By The Department.) |
| 41 | Providing and fixing of GI Pipe 6\\" |
| 42 | Providing and fixing of PCC clamp with nut and bolt |
| 43 | Providing and fixing of Cable holding clamp with nut and bolt |
| 44 | Providing and fixing of Top clamp with nut and bolt |
| 45 | Providing and fixing of Dropper channel clamp with nut and bolt |
| 46 | Providing and fixing of stay clamp with nut and bolt |
| 47 | Providing and fixing of X-arm holding clamp and nut & bolt |
| 48 | Providing and fixing of F bracket with nut and bolt |
| 49 | Providing and fixing of E bracket for 11 KV Pin with nut and bolt |
| 50 | Providing and fixing of danger board with clamp |
| 51 | Providing and fixing of barbed wire |
| 52 | Providing and fixing of M.S. Guarding Angle with clamp |
| 53 | Providing and fixing of PG clamp for 33 KV Line |
| 54 | Providing and fixing of Stone Pad |
| 55 | Dismantling of existing cable/conductor of line & its related all accessaries etc. and received back material carriage from work site to store centre, Pilibhit with loading & unloading and proper stacking. (Distance up to 60 Km.) Complete work in all respect. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 12 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 12 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender