Tender For Erection 110 Kv Dc Line On Dc/Mc Tower By Making Lilo In The Existing 110 Kv Siruseri - Padur At Proposed Kovalam 110/11 Kv Ss.
Tender Value
4.81 Crore
Estimated cost
Bid Submission
28 Aug 2026
5 days left
EMD
4.81 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Chennai → Tamil Nadu
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Erection 110 Kv Dc Line On Dc/Mc Tower By Making Lilo In The Existing 110 Kv Siruseri - Padur At Proposed Kovalam 110/11 Kv Ss.
BOQ
| Sl. No. | Item Description |
| 1 | Fabrication, galvanisation and supply of standard HTS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). |
| 2 | Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost). |
| 3 | Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site. |
| 4 | Supply of line materials ACSR Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 5 | Supply & erection of line materials OPGW 48 fiber cable as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 6 | Supply of line materials 120 KN Polymer insulator for Tension as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 7 | Supply of line materials 90 KN Polymer insulator for suspension as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 8 | Supplying, transporting and fixing of ST Fittings for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 9 | Supplying, transporting and fixing of SS Fittings for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 10 | Supplying, transporting and fixing of SB Dampers for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 11 | Supplying, transporting and fixing of mid span joint for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 12 | Supplying, transporting and fixing of Repair sleeve for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 13 | Supplying, transporting and fixing of PA Rod for Panther conductor as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 14 | Supplying of Pipe type earthing as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 15 | Supplying of counter poise earthing as per IS standard and departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 16 | Supplying of Danger Board as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 17 | Supplying of Number plate as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 18 | Supplying of Phase plate (set of three) as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 19 | Supplying of Name plate as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 20 | Supplying of circuit plate (set of two) as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 21 | Supplying of Anticlimbing device as per departmental specifications including cost of all materials, labour, lead, lift etc., complete materials, by the engineer incharge at site. |
| 22 | Conducting check survey in the already fixed route, Fixing of tower location and pit marking, jungle clearance, tree cutting etc., complete. |
| 23 | Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (0-2 m First depth) |
| 24 | Sinking well rings in loose soils, black cotton soil, sandy loam and ordinary soil under water including pumping if necessary etc., complete. for stub setting - (2-4 m second depth) |
| 25 | Supplying and laying of Pre-cast RCC well rings having inner dia 2.40M, thickness 75mm and 0.30m depth including cost of all materials, curing, placing in correct position, lead, lift, etc., complete. |
| 26 | Supplying and laying of Pre-cast RCC well rings having inner dia 1.80M, thickness 75mm and 0.30m depth including cost of all materials, curing, placing in correct position, lead, lift, etc., complete. |
| 27 | PCC 1 : 2 : 4 Grade using 20 mm HBG metal for padding and footing concrete without form work including cost of all materials curing, labour lead and lift. etc., complete. |
| 28 | PCC 1 : 2 : 4 Grade using 20 mm HBG metal for footing concrete with form work including cost of all materials curing, labour lead and lift. etc., complete. |
| 29 | Earth work excavation in all soils including cost of all materials, labour, lead, lift etc., complete as directed by the Engineer at site. |
| 30 | Providing shoring and shuttering with CW scantling and planks including cost of all materials,labour lead lift etc complete.As directed by the Engineer at site. |
| 31 | PCC 1 : 3 : 6 (M10) using 20 mm HBG metal without form work for foundation including cost of all materials, curing, labour, lead and lift. etc., complete. |
| 32 | Transport of piling and boring equipments such as boring rig, winches, motors, bentonite pump, shells, boiler casing pipe, etc., from location to location by pulling into water as necessary using crane including transport and hire charges etc., complete. |
| 33 | Setting of piling and boring equipment, tripod with all accessories and tools at each pile location based on the sequence of operation approved by the Engineer in charge at site irrespective of the location and distance of the boring rig for 1000mm dia. pile including mobilisation and demobilisation after completion of piling works etc., complete. |
| 34 | Supplying, fabrication of 6 mm M.S. sheet for making into circular encasing pipe for 500mm dia. pile to the required depth and diameter including welding, placing in position and driving into bore hole including cost of all materilas, MS plate, all labour charges, lead, lift, T&P, primer etc., complete. |
| 35 | Boring and concreting of vertical reinforced concrete in RCC M25 using 20mm HBS metal (min. cement content of 400kg/cum) using 20mm HBG metal cast in situ pile of 1000 mm dia. for required depth from bottom of pile cap in all classes of soil using pile augers for boring using Bentonite slurry and filling the bore excluding cost of steel reinforement but including cost of boring with temporary guide casing, bentonite solution and the length of pile to be embedded in the pile cap including cost of all mateials,labour, Hire charges for T&P, maximum water cement ratio not exceeding 0.45 with admixtures of CONCARE or equivalant make 1.2 lit. per cum. of concrete, as per specification including cost of all materials, labour, lead, lift etc., complete |
| 36 | Chipping and dismantling of pile concrete from bed level to cut off level of pile to meet sound concrete and clearing the dismantled concrete from pile location including cost of all labour, lead, lift charges etc., complete. |
| 37 | RCC M30 (minimum cement content 400 kg/ cum) using 20 mm HBG metal for pile cap with steel shuttering and steel form work as per drawing including cost and conveyance of all materials, labour, lead, lift, curing etc., complete but excluding cost of steel reinforcement. |
| 38 | Supplying and fabricating and placing in position of MS/RTS steel reinforcement for RCC works including labour for cutting, bending, tying and fixing in position as per specification including cost of all materials, lead, lift, labour, cost of binding wire, etc., complete. |
| 39 | Transport of stub, cleat and template including assembling of template, Prop setting, stub and cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete.for NMD type tower |
| 40 | Transport of stub, cleat and template including assembling of template, Prop setting, stub and cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete for HCO type tower |
| 41 | Transport of stub, cleat and template including assembling of template, Prop setting, stub and cleat and shifting template from location to location and re-assembling including cost of lead, lift, etc., complete for KCO type tower |
| 42 | Labour charges for erection of towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete. |
| 43 | Labour charges for erection of Multi circuit towers and tower extensions including sorting out of tower parts, tightening, punching of bolts and nuts and rectification of defects if any during erection, one coat of Zinc rich primer, 2 coats of Zinc rich enamel paint, cost of all materials, labour, lead, lift etc., complete. |
| 44 | Welding of exposed faces of bolts and nuts 1cm each at two places opposite to each other after tightening, punching to avoid theft of tower parts including cost of welding rods, hire charges for generator including welding rods and painting with good quality of zinc paint on the welded portion etc., complete. |
| 45 | Transportation & installation of Pipe type earthing earthing for towers including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 46 | Transportation and installation of Danger Plate including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 47 | Transportation and installation of Number Plate including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 48 | Transportation and installation of Phase plate (set of three) including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 49 | Transportation and installation of Name plate (set of Two) including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 50 | Transportation and installation of Circuit plate (set of Two) including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 51 | Transportation and installation of Anti-Climbing device including cost of all T&P, labour, lead, lift etc., complete, as directed. |
| 52 | Labour charges for Paying out & Stringing of 6 Nos of ACSR Panther conductor including all labour charges for availing shut down on LT /HT lines providing temporary stays fixing arching horn SB dampers aromouring with PA rod whereever required all materials labours lead lift etc..complete (for Single span ) |
| 53 | Labour charges for Paying out & Stringing of 3 Nos of ACSR Panther conductor including all labour charges for availing shut down on LT /HT lines providing temporary stays fixing arching horn SB dampers aromouring with PA rod whereever required all materials labours lead lift etc..complete (for Single span ) |
| 54 | Labour charges for Paying out & Stringing of 6 Nos of ACSR Panther conductor including all labour charges for availing shut down on LT /HT lines providing temporary stays fixing arching horn SB dampers aromouring with PA rod whereever required all materials labours lead lift etc..complete (for Jumper span ) |
| 55 | OPGW - Erection of 48 Fibre with accessories per KM including testing and commissioning |
| 56 | Labour charges for Transporting and hoisting of 120 KN Polymer tension insulators including cost of all tension fittings, all materials, labour, lead, lift, etc., complete under |
| 57 | Labour charges for Transporting and hoisting of 90 KN Polymer suspension insulators including cost of all fittings, all materials, labour, lead, lift, etc., complete under |
| 58 | Supplying, spreading, filling, consolidation of well gravel for formation of approach road and stacking platform for mobilisation of pile equipment to tower site and erection of towers including cost of well gravel, compaction, casurina props, stacking with sand bags, transport, labour, dismantling & removing the platform after completion of work, lead, lift, etc., complete. |
| 59 | Bailing out of water by pump set during the concrete including cost of diesel pump set5.00 HP cost of all materials, diesel, engine oil, hire charges, labours, lead and lift, etc., complete. |
| 60 | Cleaning the tower legs and painting with anti corrosive black paint, 2 coats to the tower legs 1.00m above coping concrete including bracings including cost of paint labour, charges, lead and lift etc. Complete |
| 61 | CGST in % (For Bidders inside TamilNadu) |
| 62 | SGST in % (For Bidders inside TamilNadu) |
| 63 | IGST in % (For Bidders outside TamilNadu) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 28, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysAug 29, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender