Tender For Replacement Of Oil Temperature Indicator, Winding Temperature Indicator And Magnetic Oil Guage With External Remote Indicator For Protection Of 2X40 Mva (Alstom Make) T/F At 132Kv S/S, Ramnagar Under Oandm Division, Ptcul, Kashipur
Tender Overview
Project Description
Tender For Replacement Of Oil Temperature Indicator, Winding Temperature Indicator And Magnetic Oil Guage With External Remote Indicator For Protection Of 2X40 Mva (Alstom Make) T/F At 132Kv S/S, Ramnagar Under Oandm Division, Ptcul, Kashipur
BOQ
| Sl. No. | Item Description |
| 1 | Please Enable Macros to View BoQ information Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Chief Engineer (O&M), Kumaon Zone, PTCUL, Haldwani Name of Work/Tender: Replacement of Oil Temperature Indicator (OTI), Winding Temperature Indicator (WTI) and MOG (Magnetic Oil Guage) with External Remote Indicator for protection of 2x40 MVA (Alstom make) transformer at 132KV S/s, Ramnagar under O&M Division, PTCUL, Kashipur. Contract No: CE/O&M/PTCUL/HLD/26/2026-27 |
| 2 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) * GST shall be paid as applicable ** Tender is of composite nature comprising of supply of goods and supply of services NOTE:- The bidder has to fill the rates/details in green cells only. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SI. No. Description of material Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P (without GST) Unit Freight Packing Forwarding Unloading & Stacking Insurance for transit cum 30 days storage RS P (Without GST) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 3 | Part-A (Supply) |
| 4 | Supply of Oil Temperature Indicator (OTI) with 2 change over switches (Option 2, switch contact rating : 15A@250V AC, 5A@250V DC), 12meters capillary length with builtin RTD sensor and internal CCU and external remote indicator of 2 Nos. of 4-20mA DC output. Range 0-150 degree C. Union as per site requirement. |
| 5 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 6 | Supply of Winding Temperature Indicator (WTI) with 4 micro switches (Option 2, switch contact rating : 15A@250V AC, 5A@250V DC), 12meters capillary length with builtin RTD sensor and internal CCU and internal CCU and external remote indicator of 2 Nos. of 4-20mA DC output. Range 0-150 degree C. Union & Gradient as per site requirement. |
| 7 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 8 | Supply of Oil Level Indicator (MOG) with 2 micro switches suitable for Aircell conservator. Vertical mounting and 1000 mm conservator dia along with float assembly with CCU of 2 Nos. 4-20mA DC output along with Remote Indicator Mounting angle as per site requirement. |
| 9 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 10 | Supply of Air Cell (Reinforcement on AIRCELL BOTTOM PATCH + 600X400 wide to prevent damaged by mog arm rubbing). |
| 11 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Chief Engineer (O&M), Kumaon Zone, PTCUL, Haldwani Name of Work/Tender: Replacement of Oil Temperature Indicator (OTI), Winding Temperature Indicator (WTI) and MOG (Magnetic Oil Guage) with External Remote Indicator for protection of 2x40 MVA (Alstom make) transformer at 132KV S/s, Ramnagar under O&M Division, PTCUL, Kashipur. Contract No: CE/O&M/PTCUL/HLD/26/2026-27 |
| 12 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) * GST shall be paid as applicable ** Tender is of composite nature comprising of supply of goods and supply of services NOTE:- The bidder has to fill the rates/details in green cells only. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SI. No. Description of materail Item Code / Make Quantity Unit Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P (without GST) Unit Freight Packing Forwarding Unloading & Stacking Insurance for transit cum 30 days storage RS P (Without GST) VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Without GST inRs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 13 | Part-B (Erection) |
| 14 | Required Oil Transferring work of from Conservator Tank to empty drums separately with proper arrangement including the cost of labour and T&P. |
| 15 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 16 | Dismantling work of Conservator tank with the Help of Hydra/ manual including the cost of labour and T&P. |
| 17 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 18 | Removing of old/damaged air cell and replacement of air cell to new by charging of air cell with Nitrogen or dry air including all material, labour and T&P complete work in all respect. |
| 19 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 20 | Opening of OLTC side cover safely. Cleaning of OLTC conservator by dry cloth. Checking of oil level and damage parts and replacing/repair for the same including all material, labour and T&P complete work. |
| 21 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 22 | Replacement of Magnetic Oil Level Gauge system (MOG) with connection of cables and testing including all material, labour and T&P complete work in all respect. |
| 23 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 24 | Erection work of Conservator tank with the Help of Hydra/manual including the cost of labour and T&P complete work in all respect. |
| 25 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 26 | Safely open trench cover for cable laying from control room to 50 MVA Transformer and trench closed after completion of work. |
| 27 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 28 | Providing and laying of 5C x 2.5 sq.mm armourd copper control cable for connection from C&R panel to 2*40 MVA Transformer for WTI, OTI & MOG Remort Indication display in control room & work of including ferruling, lugging, termination on both sides and dressing etc. |
| 29 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 30 | Replacement of WTI & OTI with calibration and testing of OTI & WTI including all material, labour and T&P complete work in all respect. |
| 31 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. |
| 32 | Filling and centrifuging of oil till satisfactory BDV results are achieved and filling up to oil in main tank and topping conservators tank including all material, labour and T&P complete work in all respects. |
| 33 | For Alstom make 40MVA Transformer-I & II having 15 degree & 30 degree angle. Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Item Rate BoQ BoQ_Ver3.0 Item Rate Normal INR Only INR Select, Excess (+), Less (-) Less (-) Tender Inviting Authority: Chief Engineer (O&M), Kumaon Zone, PTCUL, Haldwani Name of Work/Tender: Replacement of Oil Temperature Indicator (OTI), Winding Temperature Indicator (WTI) and MOG (Magnetic Oil Guage) with External Remote Indicator for protection of 2x40 MVA (Alstom make) transformer at 132KV S/s, Ramnagar under O&M Division, PTCUL, Kashipur. Contract No: CE/O&M/PTCUL/HLD/26/2026-27 |
| 34 | Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) * GST shall be paid as applicable ** Tender is of composite nature comprising of supply of goods and supply of services NOTE:- The bidder has to fill the GST AMOUNT on The green cells of AMOUNT COLOUM(4) ONLY. In case of any discrepancy in total amount from BoQ1 sheet & BoQ2 sheet below the total value in respective sheets shall prevail. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # SI.No. Particulars Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency Pleas Enter ZERO Only AMOUNT VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category TOTAL AMOUNT Rs. P TOTAL AMOUNT With Taxes TOTAL AMOUNT In Words |
| 35 | Total Part-A (Supply ) from BoQ1 sheet WITHOUT GST |
| 36 | Total Part-B (Erection) from BoQ2 sheet WITHOUT GST |
| 37 | Add GST* Amount on (Total of Part-A + Total of Part-B above) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 27 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 29 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender