Housing Urban and Rular Development Government Departments Closing in 18 days TDR #57082076

Tender For Construction Work Of Earth Filling Boundary Wall , Gazebo And Store Room Etc Of The Park No 1 Under Gida Area Resdential Sec 11 And Digging Of 500 Pits For Tree Plantation Work N The Financial Year 2026-27 Row Binding Of Pits Pit Filling P

Issued by Government Departments · Gorakhpur, Uttar Pradesh
Tender Value
1.38 Crore
Estimated cost
Bid Submission
08 Sep 2026
18 days left
EMD
8.93 Lakhs
Bank guarantee accepted
Document Fee
2950
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Gorakhpur → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Construction Work Of Earth Filling Boundary Wall , Gazebo And Store Room Etc Of The Park No 1 Under Gida Area Resdential Sec 11 And Digging Of 500 Pits For Tree Plantation Work N The Financial Year 2026-27 Row Binding Of Pits Pit Filling Pestcides Soil Improver/Cow Dung Manure Irrigation Etc.Along With Maintenance Work For 24 Months ,Gida Gorakhpur

BOQ

Name of Work:- Construction work of earth Filling Boundary wall , Gazebo and Store room etc of the Park no 1 under Gida area resdential sec 11 and digging of 500 pits for tree plantation work n the financial year 2026-27 row binding of pits pit filling pestcides soil improver/Cow dung manure irrigation etc.along with maintenance work for 24 months ,GIDA GORAKHPUR
Sl. No. Item Description
1Supply and filling of carted earth from a distance not exceeding 7 KM from the site of work and including cost of earth and all materials, labour T & P etc. Earth work in cutting or embankment in ordinary soil, excavation to be in the form of regular pits not exceeding 0.50mtr. in depth and earth work in embankment & subgrade and earthen shoulders to be in 20cm Layers, including ramming and dressing the surface to required levels and slops and also including 1.5 meter lift and 30 meter lead. (Good Earth brought from out side away from GIDA notified area) MORTH Sr.no. 3.16 Specification 305..
2Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding Royality). SOR SNO- 251
3Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 6:3:1 including supply of all materials, labour and T&P etc. required for proper completion of the work.
4M 150 class brick work in 1:4cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
5Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Morth Specification 4.10
6Providing and laying of 60 mm thick interlocking cement concrete tiles (30 Mpa) including levelling and dressing of suface to required level and slope, filling joints with local sand including the cost of labour, Material and T &P etc. required for proper complition of work as directed by Engineer-in-charge.
7Cost cement concrete with 2 cm gauge and Slmilar work Approved stone ballast Approved coarse sand and cement in proprtion of 4:2:1 in including supply of all materals labour and tools and plants etc. required for proper completon for the Work SI no 282
8P.V.C. pipe 110 mm 6kg presser I.S.I. make Sor Item No Extra Item No 17 S.N 30A
9Supply and Fixing RCC Benches as Per Drawing
1024 months maintenancePit Digging (0.45 x 0.45 x 0.45) SOR Gorakhpur 2023 Forest Department
11Pit row binding SOR Gorakhpur 2023 Forest Department
12Pit filling work with cow dung manure (0.45 x 0.45 x 0.45) SOR Gorakhpur 2023 Forest Department
13Insecticide SOR Gorakhpur 2023 Forest Department
14Soil Improver / Cow Dung Manure etc. for Pits Pre-Sanctioned Rate
15Plant transportation work Pindi Plants up to distance (10 to 20 km) (1000 plants on one trolley) SOR Gorakhpur 2023 Forest Department
16Plantation with basin construction and immediate irrigation (Pindi Plant) SOR Gorakhpur 2023 Forest Department
17Irrigation of plants including diesel cost per block plantation (70x 24 times = 1680) SOR Gorakhpur 2023 Forest Department
18S/F Sumbercible Moter Pump make of 2.5 H.P Carpation moter Fixng and drillng and loring , boring P.V.C pipe ( Supremo PVC Pipe ,60 mtr,Sige 110 mm make )as lend 60 Mtr boring pipe and testng all completed of the work Engineer in charje M.R
19Providing & laying of Selection no. 1 Doob grass turf with earth 50mm to 60mm thickness of existing ground prepared with proper level and ramming with required tools wooden and than rolling the surface with light roller make the surface smoothen and light watering the same and maintenance for 30 days or more till the grass establish properly, as per direction of the officer-in-charge. DSR
20Providing, fixing, jointing and testing, uPVC SWR pipes, - type B conforming to IS : 13592 to Water Pipe approved quality, complete, for soil, waste & water drain including pushfit jointing with seal ring. (i) Single socketed pipes.110 mm
21electrical connectionADD FOR ELECTRICAL CONNECTION and Texting Provided as per ste electrical connection all Completed of the workEngineer charje Propesed E.Supplay U.P.P.C.L
22maintenance 24 ManthComplete maintenance of the entire Garden featured having as per yard stick in the garden area ie lawn trees, shrubs, herbs, ledge, flower, wedding, pruning, replacement of paints gap filing. bed foliage creeper etc including hoeing watering, mowing of lawn, grass cutting by lawn moved and brush cutter, removal of garden waste. applying in secticide, pesticide & fertilizer, Whenever required) top dressing of lawn with cood earth and manure and maintenance of other garden related works as per directed by officer in charge, (cost of good eawrth, manure, fertilizer. provided by insecticide, pesticide will be constractor) and as per direction 2023 Forest Department officers in charge.2023 Forest Department
23Maintenance of seasonal/hedge/ground cover at road side includling weeding hocing and prunning (cutting) in required shape etc of ground bed complete item. (0.45 mtr to 0.60mtr bed) and watering of seasonal flowers by water tanker at road side including source of water Pol etc. complete 2023 Forest Department
24Providing profuse watering arrangement for lawn/Park at site to make available for irrigation PVC pipes conforming to IS : 13592 Type A, including jointing with seal ring as per direction of office in Charge in change of work. DSR-12.41.20.58X24 = 11.04 Months
25Complete maintenance of Shrubs in RSP (Out side garden features) jobs like making of basin at regular interval i/c watering, weeding pruning & application of fertilizer etc. (excluding the cost of material which shall be supplied by the department and other T&P material/articles shall be provided by the contractor) and as per direction of officer in charge Complete maintenance in green belt (out side garden)SOR 2023 Forest Department
26Supply of Neem Oil cake pulverized and un-decordicated packed in bags (As per market rate)
27Supply of Water Tanker with driver and including POL(AR/GIDA)
28Insecticide SOR Gorakhpur 2023 Forest Department2023
29Soil Improver / Cow Dung Manure etc. for Pits Pre-Sanctioned Rate SOR GKP 2023 Forest Department
30Grassing with selection No. 1 Doob grass including watering and maintenance ofthe lawn for 24 Manth or more till the grass forms a thick lawn, free from weeds and fitfor mowing including supplying of good earth, if needed (the grass and good earthshall be paid separately). Morth Forest department DSR 2.10.2
31Store RoomEarth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on lan), including dressing of sides and ramming of bottoms, for all lift, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m. Engineer-In DSR 2023
32Providing and laying Cement concrete 1:4:8 (1 cement : 4coarse sand : 8 graded stone ballast 40 mm nominal size) including supply of all materials.labour and T&P etc. required for proper completion of the work and curing complete. also including cost of formwork in foundation DSR 2023
33Providing and laying in position ready mixed M-25 or site batched design mix cement concrete for reinforced cement concrete work; using coarse aggregate and fine aggregate derived from natural sources, Portland Pozzolana / Ordinary Portland /Portland Slag cement, admixtures in recommended proportions as per IS: 9103 to accelerate / retard setting of concrete, to improve durability and workability without impairing strength; including pumping of concrete to site of laying, curing, carriage for all leads; but excluding the cost of centering, shuttering, finishing and reinforcement as per direction of the engineer-in-charge; for the following grades of concrete . Concrete of M25DSR 2023 grade with minimum cement content of 330 kg /cum
34Suppling Fitting and Placing HYSD Bar Reinforcement iin Sub Struccture Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar
35Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) M-150
3612 mm Thick plaster with cement mortar in proportion of 1:3 cement andcoarse sand over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface)
37Kota stone slab flooring over 20 mm (average) thick base laid over and jointed with grey cement slurry mixed with pigment to match the shade of he slab, including rubbing and polishing complete with base of cement mortar 1 : 4 (1 cement : 4 coarse sand) : 25 mm thick DSR 11.26
38Cement concrete flooring 1:2:4 (1 cement :2 coarse sand :4 graded stone aggregate 12-20mm nominal size laid in one layer neat cement (40 mm thick floor).DSR 11.1
39Supply & fixing of flush doors commercial quality conforming to I.S. 2202 Part 1 (1983) including fixing and adjustment of hinges bolts locks handles springs fitting with necessary screws to be supplied departmentally. (a) 35mm thick(a) Single leaf
40M.S. or Iron work of small sizes and sections such as holding down bolts, hold fast tie rods, gratings etc. wrought to required from including supply of steel bolts, nuts wastage etc and fixing required for proper completion of the work.M.S or iron work in hold fasts Door/Window/Ventilator
41Finishing walls with Putty approved brand and manufacture and of required shade on undacorated wall surface to give even shade over including curing and cost of all material, labour, T&P etc. required for proper completion of work.DSR -13.80Ground Floor
42Distempering (Two coat) with oil bound distemper of approved brand and manufacture & of required shade on ceiling to give an even shade over & including a priming coat with cement primer of approved brand & manufacture such as Berger, J & N, Shalimar, Asian paints after thoroughly brushing the surface free from mortar droppings & other foreign matters including cost of all labour & materials. Ground Floor
43Finishing walls with Premium Acrylic Smooth exterior paint with Silicone additives of required shade. New work (Two or more coats applied @ 1.25 ltr/ 10 sqm. over and including priming coat of exterior primer applied @ 2.20 kg/ 10 sqm).Ground Floor
44Painting or vanishing two coats on iron works in small areas or new wood work with one coat of ready mixed priming paint & one coat of approved superior quality ready mixed paint of clear synthetic varnish including supply of all materials labour and T & P etc. required for proper completion of work.Paint to be used should confirm to the I.S.I No.103 1950
45Providing & fixing glass panes with putty and glazing clips in steel doors, windows, clerestory windows, all complete with :4.0 mm thick glass panes
46Providing & laying \\"brick Coba\\" 120mm thick laid with M-150 class brick bat coba 7.50 cm thick with gap of 15mm to each other, over 20mm thick base of cement mortar 1:4 cement and coarse sand mixed with water proofing compound spreading cement slurry mixed with acrylic cement concrete water proofing compound filled gaps ofcoba & top of coba mortar mixed with water proofing compound in 1:4 cement and coarse sand mortar finished smooth & top mashed false square 30 cm x 30 cm and side wall parapet shall be mono lythic plaster wall upto 30cm higher an
47BouNDARY WALL, Excavation in foundation in ordinary soil (loam clay or sand) including lift upto 1.5 m. & lead upto 30 m. Including filling watering & ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth removal & disposal of surplus earth as directed by engineer in charge upto a distance of 30m from the foundation trenches. (Excluding
48Cement concrete with 4 cm. (1½\\") gauge approved stone, ballast, approved coarse sand and cement in the proportion of 4:2:1 including supply of all materials, labour and T&P etc. required for proper completion of the work. Sor No 279
49Providing Concrete For Rainforcment concrete M-25 in open Foundations complete Asper Drawing and Technical Specification MoRTH Clauses 12.08 E Case II
50Mild steel or iron in plain work such as reinforced concrete or reinforced brick work (when not included in an over all rates) wrought to required shape as necessary including bending for proper completion of the work and including supply of all steel and wastage and over lapping & hooks. SOR SNO - 504 only use for sail brand Tmt bar
51M 150 class brick work in 1:6 cement and coarse sand mortar in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
52Fabrication Supply and Fixing Of M.S Angle Mild steel or iron work in heavy sizes such as trusses; builts up gates, door, frames, record racks roof work, gates etc. wrought to required form including drilling holes, rivetting or welding where necessary, and also including supply of steel, bolts, nuts etc. & their fixing required for proper completion of the work.Sor
5312mm Thick plaster with cement mortar in proportion of 1:3 cement and Corse sand of over brick work minimum thickness not be less than 10mm including supply of all materials, labour and T&P etc. required for proper comletion of the work. (including racking & washing surface)
54Finishing walls with' one coat. of water' proof cement paint of approved quality of previously' old 'treated surface with this paint to give an even shade including supply of all materials, labour 'and T&P etc. required for the proper completion of the work.
55Apply priming coat over new steel and other metal surface after and including preparing the surface throughly cleaning oil grease dirt and other foreign matter and scoured with wire brushes, fine steel/wood scrappers sand papering and knotting including cost of all materials, labour and T&P etc. required for proper completion of the work. S.I.No-1 Chapter 15 New Item
56Painting first coat over priming coat (but excluding cost of priming cost) on wood or steel and other metal surface with superior synthetic enameland finish and inclucoat after first coat on wood or steel surface
57GAZEBOExcavation in foundation in ordinary Soil (Loam clay or sand) including lift upto 1.5m lead upto 30.0 m & including filling watering and ramming of excavated earth into the space between the building & sides of foundation trenches or into the plinth and removal & disposal surplus earth as directed by the engineer I/C within a lead of 30 m.from foundation trenches.
58Providing and laying cement concrete 1:2:4 (1 cement: 2 coarse sand: 4 graded stone ballast D. 40 mm nominal size) including supply of all materials, labour and T&P etc. required for proper completion of the work and curing complete, also including cost of form work in foundation and floorsSame as item no 279 (a) above but in 8: 4:1
59R.C.C. Work with cement approved coarse sand and 2 cmgauge stone grit in the proportion of 1: D. 1.5:3 (M-30) in Column Footing excluding supply of reinforcement and its bending but including fixing and bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. also including supply of all material, labour, and T& P etc requiterd for proper completion of work. (In Foundation)
60M-150 brick work in 1: 4 cement and approved PWD coarse sand in foundation and plinth including supply of all materials, labour and T&P etc. required for proper completion of the work.
61R.C.C. Work with cement approved coarse sand and 2 cmgauge stone grit in the proportion of 1: 1.5:3 (M-30) in super structure excluding supply of reinforcement and its bending but including fixing and bending the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc, also including supply of all material labour, and T& P etc requiterd for proper completion of workRCC Column
62RCC Beam
63For RCC Slab
64Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level & above plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more
6515 mm cement plaster of mix: 1:4 (1 cement: 4 coarse sand) in single coat on rough side of single or half brick wall
66Providing and laying vitrified floor tiles in different sizes (thickness to be specified by the manufacturer) with water absorption less than 0.08% and conforming to IS: 15622, of approved make, in all colours and shades, laid on 20mm thick cement mortar 1:4 (1 cement: 4 coarse sand), jointing with grey cement slurry @ 3.3kg/sqm including grouting the joints with white cement and matching pigments etc., complete. Size of Tile 600x600 mm
67Providing and laying Polished Granite stone flooring in required design and patterns, in linear as well as curvilinear portions of the building all complete as per the architectural drawings with 18 mm thick stone slab over 20 mm (average) thick base of cement mortar 1:4 (1 cement: 4 coarse sand) laid and jointed with cement slurry and pointing with white cement slurry admixed with pigment of matching shade including rubbing curing and polishing etc. all complete as specified and as directed by the Engineer-in-Charge. Polished Granite stone slab jet Black, Cherry Red, Elite Brown, Cat Eye or equivalent.
68Providing and applying white cement based putty of average thickness 1 mm, of approved brand and manufacturer, over the plastered wall surface to prepare the surface even and smooth complete
69Painting two coats over priming coat on new iron or steel surfaces up to 10 cm width or sq,mt in areas with superior synthetic enamel such as Luxol-3 Hi-gloss apcolite superlac, Dulux specified finishing to give an even shade & incl. cleaning the surface of all dirt, dust & other foreighn matter 07) sand preparing and knotting incl. cost of all etc. required for proper completion of work.
70Providing and fixing Terracota Tile on Roof
71Electrical work in Gazebo Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57082076
AUTHORITY Government Departments
TENDER VALUE 1.38 Crore
LAST DATE 08-09-2026
Authority
Authority Name Gorakhpur Industrial Development Authority
Work Description Tender for Construction Work Of Earth Filling Boundary Wall , Gazebo And Store Room Etc Of The Park No 1 Under Gida Area Resdential Sec 11 And Digging Of 500 Pits For Tree Plantation Work N The Financial Year 2026-27 Row Binding Of Pits Pit Filling Pestcides Soil Improver/Cow Dung Manure Irrigation Etc.Along With Maintenance Work For 24 Months ,Gida Gorakhpur
Basic Detail
Tender No 2662/GIDA/2026-27 DT. 05.08.2026
Bidding Type Tender
Location
City Gorakhpur
State Uttar Pradesh
Key Dates
Publish Date 19 Aug 2026
Submission Date 08 Sep 2026
Open Date 08 Sep 2026
Finance
Tender Value 1.38 Crore
Tender Fee 2950
EMD 8.93 Lakhs
Exemption Not Available
Document List
BOQ_2213586.xls
fce9e0ff-e7c0-49f2-bd4d-45a78903c852.html
Tendernotice_1 (52).pdf
Tendernotice_2 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 19, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 08, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Sep 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_2213586.xls

html

fce9e0ff-e7c0-49f2-bd4d-45a78903c852.html

pdf

Tendernotice_1 (52).pdf

pdf

Tendernotice_2 (11).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders