Tender For Maintenance Of Link Road From Bamaur Gadwai Marg Par Gram Singar To Sutta Under K.U.M.S. Gursarai. Length - 2.50 Km
Tender Value
Ref. Documents
Estimated cost
Bid Submission
29 Aug 2026
6 days left
EMD
4.62 Lakhs
Bank guarantee accepted
Document Fee
9400
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Jhansi → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Maintenance Of Link Road From Bamaur Gadwai Marg Par Gram Singar To Sutta Under K.U.M.S. Gursarai. Length - 2.50 Km
BOQ
| Sl. No. | Item Description |
| 1 | Earth work in cutting or in embankment in Ordinary soil excavation to be in the form of a regular pits not exceeding 0.50m in depth and earth work in embankment to be in 20cm layers including ramming and dressing the surface to required levels and slopes and also including 1.5 m lift and 30m lead. The earth in form of cutting (b) to be used as spoil banks within 50m distance as directed by the Engineer-in-Charge. (Excluding royality) SI No. 253 |
| 2 | Providing, laying, spreading and compacting 45-63mm gauge stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber, applying and brooming requiste type of screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading III as per technical specification clause |
| 3 | Providing, laying, spreading and compacting 22.4-53mm gauge stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with 3-wheeled steel/vibratory roller 80-100 tonnes in stages to proper grade and camber, applying and brooming requiste type of screening/binding material to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading III as per technical specification clause |
| 4 | Providing and Applying Primer Coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of raod surface any spraying primer at the rate 0.70 kg/Sqm using mechanical means. As per M.O.R.T.&H. specification clause 5.1 SI No -502 |
| 5 | Providing and Applying tack coat with Bitumen VG-10 using Pressiure distributor at the rate of 0.30 kg per sqm on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 III |
| 6 | Providing and laying 20 mm thick open-graded premix carpet using Bitumen VG-10 composed of 13.2 mm to 5.6 mm aggregates to required line, grade and evel II serve as per MORD Specific 508 Clause by HMP |
| 7 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type C as per Technical Specification Clause 510 |
| 8 | Supply and layng of 600mm dia humepipe required for proper completion of the work as direted by Engnee-in-charge |
| 9 | Supply and fixing of Road Sign Board of approved drawing and design including cost of all materials, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge. |
| 10 | Maintenance of First year (0.00% of Total Amount of Premixing etc. work) from Item no 01 to 17 |
| 11 | Maintenance of Second year (0.75% of Total Amount of Premixing etc. work) |
| 12 | Maintenance of Third year (1.50% of Total Amount of Premixing etc. work) |
| 13 | Maintenance of Fourth year (2.25% of Total Amount of Premixing etc. work) |
| 14 | Maintenance of Fifth year (3.00% of Total Amount of Premixing etc. work) |
| 15 | M- 150 class brick work in edge floor and Fine sand of 1.25 F.M. mortar in foundation and plinth Including cost all materials, labour & T&P, etc. required for proper completion of the work. S.I.No. 303 |
| 16 | Supply and laying of 125 microne polythene sheet of approved quality including cost of all materials, labour, T&P etc. required for proper completion of the work as directed by Engineer-in-charge. Analysis |
| 17 | Plain cement concrete with 2cm gauge approved stone grit and approved coarse sand and cement in proportion of 1:1.5:3 including cost of all materials, labour, tools and plants, etc. required for proper completion of the work. S.I. No. New item a and analysis |
| 18 | Maintenance of First year (0.00% of Total Amount of C.C. work) |
| 19 | Maintenance of Second year (0.25% of Total Amount of C.C. work) |
| 20 | Maintenance of Third year (0.50% of Total Amount of C.C. work) |
| 21 | Maintenance of Fourth year (0.75% of Total Amount of C.C. work) |
| 22 | Maintenance of Fifth year (1.00% of Total Amount of C.C. work) Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 19, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 29, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysAug 29, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender