Housing Urban and Rular Development Government Departments Closing in 10 days TDR #57077237

Tender For Permanent Restoration Of Road From Awan To Charoon Tehsil Mendhar District Poonch.

Issued by Government Departments · Punch, Jammu And Kashmir
Tender Value
91.57 Lakhs
Estimated cost
Bid Submission
31 Aug 2026
10 days left
EMD
1.83 Lakhs
Bank guarantee accepted
Document Fee
1600
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Punch → Jammu And Kashmir
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Permanent Restoration Of Road From Awan To Charoon Tehsil Mendhar District Poonch.

BOQ

Name of Work:- Permanent Restoration of road from Awan to Charoon Tehsil Mendhar District Poonch.
Sl. No. Item Description
1R/ wall Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
2Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
3Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
4RANDOM RUBBLE MASONRYRandom Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand).
5Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone.
6Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25 mm thick with 20mm nominal size stone aggregate.
7Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
8Carriage of material sand avg lead 50 km BY MT.
9Carriage of material Agg below 40mm avg lead 10 km.
10Carriage of material Agg Above 40mm avg lead 10 km.
11Carriage of Stone avg lead 5 km.
12R/ wall Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
13Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
14Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
15RANDOM RUBBLE MASONRYRandom Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand).
16Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone.
17Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25 mm thick with 20mm nominal size stone aggregate.
18Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
19Carriage of material sand avg lead 10 km BY MT.
20Carriage of material Agg below 40mm avg lead 10 km.
21Carriage of material Agg Above 40mm avg lead 10 km.
22Carriage of Stone avg lead 10 km.
23B/ wall Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
24Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
25Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
26RANDOM RUBBLE MASONRYRandom Rubble masonry with hard stone in foundation and plinth including leveling up with cement concrete 1:6:12 (1 Cement : 6 coarse sand : 12 graded stone aggregate 20mm nominal size) upto plinth level and curing complete with: Cement mortar 1:6 (1 Cement : 6 coarse sand).
27Dry random rubble masonry with hard stone in foundation and plinth: Without bond stone.
28Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25 mm thick with 20mm nominal size stone aggregate.
29Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
30Carriage of material sand avg lead 50 km BY MT.
31Carriage of material Agg below 40mm avg lead 10 km.
32Carriage of material Agg Above 40mm avg lead 10 km.
33Carriage of Stone avg lead 5 km.
34Drain. Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
35Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
36Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
37Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc.complete. 25 mm thick with 20mm nominal size stone aggregate.
38Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete.
39Carriage of material sand avg lead 13 km BY MT.
40Carriage of material Agg below 40mm avg lead13 km.
41Carriage of material Agg Above 40mm avg lead 13 km.
42Crated wall Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
43Hand Packed stones in wire -crate including cost of crates and stones.
4403 NO 02 METRE SPAN CULVERT Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
45Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work uptoplinthlevel 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
46Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size).
47Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size).
48Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more.
49.Dumping stone Including cost of stones in Horizontal on level .
50Centering and shuttering including strutting, propping, etc and removal of form work for foundations , footings ,bases of columns etc.
51Centering and shuttering including strutting, propping, etc and removal of form work for R/wall.
52Suspended floors, roofs, landings, balconies and access platforms.
53Edges of slabs and breaks in floors and walls Above 20 cm wide .
54RBM filling behind culvert.
55Carriage of Sand avg.50 KM by MT
56Carriage of Stone Agg. av. Below 40mm 10 KM by MT
57Carriage of Stone agg.Above 40mm av lead 30 km by MT
58Hpcculvert Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil :
59Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size)
60Cement concrete flooring 1:2:4 (1cement: 2 coarse sand: 4 graded stone aggregate) finished with a floating coat of neat cement including cement slurry and curing complete, but excluding the cost of nosing of steps etc. complete. 50 mm thick with 20mm nominal size stone aggregate.
61Providing and laying non-pressure of specified class R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement: 2 fine sand) including testing of joints etc. complete.1000 mm dia. R.C.C. pipe (laying by manual/mechanical means).
62Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each depositedlayer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
63Carriage of material Agg below 40mm avg lead 18 km by MT .
64Carriage of material Agg Above 40mm avg lead 18 km by MT .
65Carriage of material Stone avg lead 10 km by MT.
66Supplying and stacking at site Graded crushed stone aggregate of size 63 mm to 45 mm.
67Laying, spreading and compacting stone aggregate of specified sizes to WBM specifications in uniform thickness, hand picking, rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening /binding material to fill up interstices of coarse aggregate, watering and compacting to the required density.
68Supplying and stacking at site 11.2 mm nominal size (Type B) .
69Supplying and stacking at site Moorum
70Carriage of material Screening/Moorum avg lead 8 km.
71Carriage of material Agg Above 40mm avg lead 8 km. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57077237
AUTHORITY Government Departments
TENDER VALUE 91.57 Lakhs
LAST DATE 31-08-2026
Authority
Authority Name Public Works Department
Work Description Tender for Permanent Restoration Of Road From Awan To Charoon Tehsil Mendhar District Poonch.
Basic Detail
Tender No e-NIT No 65 of 2026-27 Dated 18-08-2026
Bidding Type Tender
Location
City Punch
State Jammu And Kashmir
Key Dates
Publish Date 18 Aug 2026
Submission Date 31 Aug 2026
Open Date 01 Sep 2026
Finance
Tender Value 91.57 Lakhs
Tender Fee 1600
EMD 1.83 Lakhs
Exemption Not Available
Document List
722fe77d-c9dd-482d-8eac-51c73056283d.html
BOQ_1073088.xls
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Sep 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
html

722fe77d-c9dd-482d-8eac-51c73056283d.html

xls

BOQ_1073088.xls

pdf

Tendernotice_1.pdf