Power Government Departments Closing in 7 days TDR #57074678

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 160 Kva To 1000 Kva Damaged Distribution Transformer At Workshop Shikohabad Under Ewd, Agra; Damaged Distribution Transformer; As Per B

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
11.80 Lakhs
Estimated cost
Bid Submission
31 Aug 2026
7 days left
EMD
10000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 160 Kva To 1000 Kva Damaged Distribution Transformer At Workshop Shikohabad Under Ewd, Agra; Damaged Distribution Transformer; As Per Boq And Gem Bid Docume.. - 160 Kva Three Phase Alu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 250 Kva Three Phase Alu./Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 400 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 630 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 1000 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor).

BOQ

Sl. No. Item TitleItem Description
1160 KVA Three Phase Alu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).160 KVA Three Phase Alu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
2Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
3Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
4Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
5Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
6Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
7Refiting/Replacement/Fixing of HT Bushings.Refiting/Replacement/Fixing of HT Bushings.
8Refiting/Replacement/Fixing of LT Bushings.Refiting/Replacement/Fixing of LT Bushings.
9Refiting/Replacement/Fixing of HT Bushing Rods.Refiting/Replacement/Fixing of HT Bushing Rods.
10Refiting/Replacement/Fixing of LT Bushing Rods.Refiting/Replacement/Fixing of LT Bushing Rods.
11Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
12Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
13Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
14Refiting/Replacement/Fixing of Arching Horns/Breather.Refiting/Replacement/Fixing of Arching Horns/Breather.
15Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
16Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
17250 KVA Three Phase Alu./Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).250 KVA Three Phase Alu./Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
18Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
19Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
20Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
21Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
22Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
23Refiting/Replacement/Fixing of HT Bushings.Refiting/Replacement/Fixing of HT Bushings.
24Refiting/Replacement/Fixing of LT Bushings.Refiting/Replacement/Fixing of LT Bushings.
25Refiting/Replacement/Fixing of HT Bushing Rods.Refiting/Replacement/Fixing of HT Bushing Rods.
26Refiting/Replacement/Fixing of LT Bushing Rods.Refiting/Replacement/Fixing of LT Bushing Rods.
27Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
28Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
29Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
30Refiting/Replacement/Fixing of Arching Horns/Breather.Refiting/Replacement/Fixing of Arching Horns/Breather.
31Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
32Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
33400 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).400 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
34Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
35Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
36Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
37Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
38Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
39Refiting/Replacement/Fixing of HT Bushings.Refiting/Replacement/Fixing of HT Bushings.
40Refiting/Replacement/Fixing of LT Bushings.Refiting/Replacement/Fixing of LT Bushings.
41Refiting/Replacement/Fixing of HT Bushing Rods.Refiting/Replacement/Fixing of HT Bushing Rods.
42Refiting/Replacement/Fixing of LT Bushing Rods.Refiting/Replacement/Fixing of LT Bushing Rods.
43Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
44Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
45Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
46Refiting/Replacement/Fixing of Arching Horns/Breather.Refiting/Replacement/Fixing of Arching Horns/Breather.
47Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
48Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
49630 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).630 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
50Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
51Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
52Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
53Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
54Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
55Refiting/Replacement/Fixing of HT Bushings.Refiting/Replacement/Fixing of HT Bushings.
56Refiting/Replacement/Fixing of LT Bushings.Refiting/Replacement/Fixing of LT Bushings.
57Refiting/Replacement/Fixing of HT Bushing Rods.Refiting/Replacement/Fixing of HT Bushing Rods.
58Refiting/Replacement/Fixing of LT Bushing Rods.Refiting/Replacement/Fixing of LT Bushing Rods.
59Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
60Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
61Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
62Refiting/Replacement/Fixing of Arching Horns/Breather.Refiting/Replacement/Fixing of Arching Horns/Breather.
63Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
64Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).
651000 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).1000 KVA Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling of DamageTransformer from stacking yard to Dismantling area. Draining of Oil into pit/drum. Opening of top cover plate by T&P or cutting of sealed Transformer top cover plate by chisel Hammer Process, taking out the core and coil assembly from the tank. Dismantling core and coil assembly. Assembly of displaced core and cleaning of dust and dirt by cotton waste and wooden dust from every leaf of laminations if required (Welding/Brazing/Gas Cutting/Wooden Dust required for this work shall be arranged by the contractor).
66Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of L.V. Coils as per original design/design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
67Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).Making of HV Leg coils of same size and dimensions as old one or design approved by concern JE/AE (Using either new coil or reconditioning old coil as per technical conditions of old coil).
68Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.Assembly of core and coils and fitting of other parts requiring replacements such as press board etc. Making supports between adjacent section by insulation spacers barriers etc. and tapping etc (Brazing/Soldering required, shall be arranged by the contractor). Shifting and keeping the assembled core and coils etc. In OVEN from the repairing and assembly place.
69Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.Cleaning of tank in cleaning yard. Repairing of burst body & radiator properly with welding including repairing of bended base channel. Painting of inner side of transformer tank and channels with heat proof zinc chromate paint of good quality. (Berger, Nerolac, Jenson & Necholson etc) Paint material shall be provided by contractor at his own cost.
70Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).Dragging out clean empty tank from yard to repairing hall. Taking out assembled core and coils assembly from the \\"OVEN\\" after proper megger value and shifting to repairing hall. (Meggar will be arranged by the contractor at his own cost.). Retanking of complete assembly into painted tank and Proper tightening of the assembly in the tank safely by using nut bolts and spring washer of good quality, Fitting of all accessories of the transformer including fixing of pressure release valve/vent pipe and filling of oil in transformer (Vent Pipe will be arranged by the contractor at his own cost.). Punching of unique no. on MS plate 100x50x3 mm. size & Welding of MS Plate on Transformer Body containing following information:- Uniqe Number, Capacity (MS Plate & Punching Machine shall be provided by contractor).
71Refiting/Replacement/Fixing of HT Bushings.Refiting/Replacement/Fixing of HT Bushings.
72Refiting/Replacement/Fixing of LT Bushings.Refiting/Replacement/Fixing of LT Bushings.
73Refiting/Replacement/Fixing of HT Bushing Rods.Refiting/Replacement/Fixing of HT Bushing Rods.
74Refiting/Replacement/Fixing of LT Bushing Rods.Refiting/Replacement/Fixing of LT Bushing Rods.
75Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of HT Gasket/Oil Seal for all phase.
76Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.Refiting/Replacement/Fixing of LT Gasket/Oil Seal for all phase.
77Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.Refiting/Replacement/Fixing of Top Cover Plate Gasket with typing of top cover plate by using nut bolt & washer.
78Refiting/Replacement/Fixing of Arching Horns/Breather.Refiting/Replacement/Fixing of Arching Horns/Breather.
79Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.Painting of T/F outside with super enemal synthetic paint in two coats after de-rusting and providing primer of red oxide paint etc.(color should be decided by EE WS) Paint & Painting Material shall be arranged by the contractor. Painting of 02 No. 50 mm. wide Green/Yellow/Orange/Red strip & writing name of workshop and ^^fo|qr lEcU/kh f'kdk;r gsrq Vksy Qzh ua0 1912 ij lEidZ djsaa**] Dragging of repaired T/F upto the test cabin /testing place and making full arrangement for the testing of transformer and their re-dragging to yard and its stacking at indentified place.
80Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).Daily cleaning of Workshop floor area, Open Shade and Open Area including the scrap material such as old paper, old pressboard, old cotton waste etc. (Wood dust, Sweeper, other required man power and T&P shall be arranged by the contractor).

AI Tender Summary

OUR REF NO 57074678
AUTHORITY Government Departments
TENDER VALUE 11.80 Lakhs
LAST DATE 31-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 160 Kva To 1000 Kva Damaged Distribution Transformer At Workshop Shikohabad Under Ewd, Agra; Damaged Distribution Transformer; As Per Boq And Gem Bid Docume.. - 160 Kva Three Phase Alu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 250 Kva Three Phase Alu./Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 400 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 630 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 1000 Kva Three Phase Cu. Wound (Workshop Mathura) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor).
Basic Detail
Tender No GEM/2026/B/7932917
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 18 Aug 2026
Submission Date 31 Aug 2026
Open Date 31 Aug 2026
Finance
Tender Value 11.80 Lakhs
Tender Fee Ref. Documents
EMD 10000
Exemption Not Available
Document List
cdd2e553-816c-4567-8b49-8dea02c652c6.pdf
1787058590.xlsx
1787058600.pdf
1787058604.pdf
1787058611.pdf
FORMAB_a931f96b-6d1a-4ded-a8351787058668443_EWCAGRABUYER.pdf
GEMBidATC_0426da44-bb44-4980-b0d91787058648767_EWCAGRABUYER.pdf
GEMBidATC_e38bff77-fe00-4108-b6001787058657923_EWCAGRABUYER.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 31, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 7 days
Aug 31, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 7 days

Tender Documents

Download All (ZIP) ↓
pdf

cdd2e553-816c-4567-8b49-8dea02c652c6.pdf

xlsx

1787058590.xlsx

pdf

1787058600.pdf

pdf

1787058604.pdf

pdf

1787058611.pdf

pdf

FORMAB_a931f96b-6d1a-4ded-a8351787058668443_EWCAGRABUYER.pdf

pdf

GEMBidATC_0426da44-bb44-4980-b0d91787058648767_EWCAGRABUYER.pdf

pdf

GEMBidATC_e38bff77-fe00-4108-b6001787058657923_EWCAGRABUYER.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders