Defence Statutory Bodies & Commissions/Committees Closing in 9 days TDR #57073295

Tender For Addn/ Altn/ Improvement To Fire Fighting Infrastructure Under Ge(Af) Tughlakabad

Issued by Statutory Bodies & Commissions/Committees · Delhi, Delhi
Tender Value
2.69 Crore
Estimated cost
Bid Submission
28 Aug 2026
9 days left
EMD
3.44 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Delhi → Delhi
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Addn/ Altn/ Improvement To Fire Fighting Infrastructure Under Ge(Af) Tughlakabad

BOQ

Name of Work:- ADDN/ ALTN/ IMPROVEMENT TO FIRE FIGHTING INFRASTRUCTURE UNDER GE(AF) TUGHLAKABAD
Sl. No. Item Description
1B/R WORKSTaking down existing treatment of any description on roof etc including scrubbing down with water as in roof treatment etc complete all as specified and as directed
2Material & Labour for cement concrete (1:2:4) type B-0 using 12.5 mm graded stone aggregate in padding finishing surface of concrete topping even and smooth without using extra cement complete all as specified and directed.
3Material & Labour for 10mm thick rendering with cement mortar (CM1:3) on concrete finished even & fair complete all as specified and directed.
4Material & Labour for preparation of roof top surface for roof treatment using application of water proofing treatment by authorised applicator complete all as specified and as directed and comprising of the following:- (a) Preparation of roof top surfaces and cleaning all the dust and loose material by brush/blower/grinder including removing of vegetation/plantation from the surface and providing and applying single component elastic cold applied polyurethene modified acrylic roofing system, co-elastic technology (CET) based on modified polyurethene and fully fibre reinforced, having sun reflectivity index(SR) of 109 on top of concrete roof surfaces.(b) All cracks upto 3mm at corner joints, channel and parapets shall treated with crack seal.(c) Applying three coats incuding one coat of primer of polyurethene membrane having coverage @ min 0.75kg/sqm and dilution upto 10% and laying reiforced fibre net and applying two coats for maintaining minimum dry film thickness 1.5mm and elongation at break of free fall of apprx 350%(d) The material shall be appplied with brush or roller, complete in all respect as directed. (Note: 6hrs interval between two coat shall be maintained)(e) All auxillary and accessories involved during application should be supplied by single manufacturer as part of system. Name of Work: ADDN/ ALTN/ IMPROVEMENT TO FIRE FIGHTING INFRASTRUCTURE UNDER GE(AF) TUGHLAKABAD Contract No: CA NO. CE(AF)/NGP/TKD/TEMP 06 OF 2026- 27 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, the same shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount. 2. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.3. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible4. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.5. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.6. The credit amount of this schedule will be carried over to General Summary/BOQ here-in-after to arrive at the contract Sum.7. The materials listed in this schedule shall be recorded in the measurement Book and accordingly to be abstracted as per work done of the respective items of Schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of GE without any extra cost to the Deptt only after adjustment of the amount of credit in first payment. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs
5Material & Labour for preparation of roof top surface for roof treatment using application of water proofing treatment by authorised applicator complete all as specified and as directed and comprising of the following:- (a) Preparation of roof top surfaces and cleaning all the dust and loose material by brush/blower/grinder including removing of vegetation/plantation from the surface and providing and applying single component elastic cold applied polyurethene modified acrylic roofing system, co-elastic technology (CET) based on modified polyurethene and fully fibre reinforced, having sun reflectivity index(SR) of 109 on top of concrete roof surfaces.(b) All cracks upto 3mm at corner joints, channel and parapets shall treated with crack seal.(c) Applying three coats incuding one coat of primer of polyurethene membrane having coverage @ min 0.75kg/sqm and dilution upto 10% and laying reiforced fibre net and applying two coats for maintaining minimum dry film thickness 1.5mm and elongation at break of free fall of apprx 350%(d) The material shall be appplied with brush or roller, complete in all respect as directed. (Note: 6hrs interval between two coat shall be maintained)(e) All auxillary and accessories involved during application should be supplied by single manufacturer as part of system. Name of Work: ADDN/ ALTN/ IMPROVEMENT TO FIRE FIGHTING INFRASTRUCTURE UNDER GE(AF) TUGHLAKABAD Contract No: CA NO. CE(AF)/NGP/TKD/TEMP 06 OF 2026- 27 Name of the Bidder/ Bidding Firm / Company : SCHEDULE OF CREDITNOTES:-1. The unit rate of materials/items given under column 5 are minimum rate fixed by the department. The contractor shall quote his unit rate under column 7 and arrive at the amount under column 8 and there by total amount of sch of credit. However, if the quoted rate is lower than the rate inserted by MES, the same shall be treated as “AT PAR” and the amount shall be corrected accordingly to work out the total credit amount. 2. It will be responsibility of the contractor for removal of demolished material thereof, without any extra cost. The materials obtained from dismantling/demolition shall be the property of the contractor.3. The contractor is advised to inspect the buildings/structures to be demolished and ascertain the quantity and quality of material to be obtained from demolition. No claim whatsoever, on account of quality/quantity of material actually obtained on demolition shall be admissible4. The materials obtained by demolition / dismantling as per relevant part of schedule ‘A’ is given below and complete dismantled material shall be the property of the contractor and credit for the same shall be charged from the contractor. The credit assessed by the department is only rough indication and the contractor shall have no claims whatsoever against Government if the actual cost of the salvaged materials turn out to be different from the amount assessed by the department.5. The quantities inserted in the column 4 are approximate and the contractor will have no claim if the quantities obtained to be different on execution. The actual quantities shall be measured as per the work actually executed at site against the respective items of Sch ‘A’.6. The credit amount of this schedule will be carried over to General Summary/BOQ here-in-after to arrive at the contract Sum.7. The materials listed in this schedule shall be recorded in the measurement Book and accordingly to be abstracted as per work done of the respective items of Schedule ‘A’ and the total abstracted credit amount shall be deducted from the total value of work done.8. The materials so obtained by the contractor shall not be allowed to be reused in the work unless otherwise mentioned and the contractor shall remove the same from the work site with prior permission of GE without any extra cost to the Deptt only after adjustment of the amount of credit in first payment. Sl No Description of material Unit Approx Nos of unit Assessed Rate in Rs. per unit Amount in Rs. Quoted by the contractor Rate per unit Amount in Rs
6Old steel ventilators / windows
7Chowkats with shutters any size
8Old steel tubing any size
9Old u/s bib tap, stop valve, shower rose,
10Old PVC flushing cistern
11Old u/s wash hand basin with fittings
12Old PVC connection
13Old u/s SS sink
14Old u/s SS kitchen rack
15Old u/s curtain rod
16Old u/s towel rail
17Old PVC tank
18Old CI pipe any size
19Old u/s mirror
20Old u/s aluminium/ copper point wiring
21Old u/s switch, socket, fan regulator, ceiling rose, plugs, and switch socket combination junction boxes, sunkcn box of any type and capacity
22Old u/s DB of any type, size and capacity
23Old u/s MCB of any type and capacity
24Old u/s tube light of any type
25Old u/s sub-main wiring of any size & type
26Old u/s earthing.
27Old u/s switch, socket, any type and capacity
28Old u/s LED light fitting 1x16 Watt flame proof, any type and capacity
29Old u/s flame proof exhaust fan & 300mm sweep
30Old u/s flame proof Ceiling fan 1200mm sweep
31Old U/S Intelligent Addressable Fire Alarm Panel, 2 Loop capacity expandable up to 5 loop with minimum 250 addresses on every loop. minumum 160 characters
32Old U/S analogue addressable fire control panel repeater of having full display & optional control from a small and unobtrusive local control station,
33Old U/S Detectors complying with and type certified to EN-45 addressable type mutisensor detector with smoke and heat detector combination with base with self built intelligence as per IS:11360
34Old U/S Beam master detector Transceiver type
35Old U/S cable for Analog Addressable fire alarm system 1.5 sqmm x 2 core (Red).
36Old U/S \\" Fire Ray 2000\\" Optival Beam Complete with Transmitter Receive, Controller ,& ,Apolo XP95 Addressable Zone Monitor unit for Addressing.
37Old U/S Apolo XP95 intelligent Analouge Addressable Manual Call Point
38Old U/S Apolo XP95 intelligent Analouge Addressable loop Sounder ( hooter)
39Old U/S REMOTE RESPONSE INDICATOR with necessary materials
40Old U/S Apolo XP95 input / output Unit ( Control Module)
41Old U/S Apolo XP95 Fault Isolator ( Fault Module) -20 OD ( in lieu of XP95Base) Total amount as applicable with respect to Note No. 1 shall be carried over to BOQ Rs.96,584.00 0.0 GENERAL SUMMARY (CONTD…………………..) 1. Total Lump Sum amount brought forwarded from Serial Page No. 54 Rs. 0.0 2. Deduct Amount of Schedule of Credit brought forwarded from Serial Page No. 58 (-) Rs. 0.0 3. NET LUMP SUM AMOUNT Rs. 0.0 ( Zero Only) SIGNATURE OF CONTRACTOR AD (CONTRACTS) DATED : FOR ACCEPTING OFFICER Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57073295
AUTHORITY Statutory Bodies & Commissions/Committees
TENDER VALUE 2.69 Crore
LAST DATE 28-08-2026
Authority
Authority Name Military Engineer Services
Work Description Tender for Addn/ Altn/ Improvement To Fire Fighting Infrastructure Under Ge(Af) Tughlakabad
Basic Detail
Tender No AF_TKD_801259
Bidding Type Tender
Location
City Delhi
State Delhi
Key Dates
Publish Date 18 Aug 2026
Submission Date 28 Aug 2026
Open Date 01 Sep 2026
Finance
Tender Value 2.69 Crore
Tender Fee 2000
EMD 3.44 Lakhs
Exemption Available
Document List
801259NIT.pdf
801259TENDERDOCUMENTS.pdf
BOQ_879708.xls
e991286b-db9c-4785-99a1-d6dd06823cc3.html
Tendernotice_1.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 9 days
Sep 01, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 13 days

Tender Documents

Download All (ZIP) ↓
pdf

801259NIT.pdf

pdf

801259TENDERDOCUMENTS.pdf

xls

BOQ_879708.xls

html

e991286b-db9c-4785-99a1-d6dd06823cc3.html

pdf

Tendernotice_1.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders