Defence Government Departments Closing in 1 days TDR #57071800

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Tabar At Nd (Mbi); Routines On Deep Sea Seal, Rudder, Stabiliser And Underwater Valves Ins Tabar; Service Provider - Degutting Of Guards

Issued by Government Departments · Mumbai, Maharashtra
Tender Value
Ref. Documents
Estimated cost
Bid Submission
25 Aug 2026
1 days left
EMD
4.10 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Mumbai → Maharashtra
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Tabar At Nd (Mbi); Routines On Deep Sea Seal, Rudder, Stabiliser And Underwater Valves Ins Tabar; Service Provider - Degutting Of Guards, Pipelines, Fittings And Associated Fittings To Access Deep Sea Seal Assembly. , Opening Of Deep Sea Seal Housing And Complete Dismantling Of Seal Assembly, Mantex. ‘O Cords, Inflatable Seal And Associated Sealing Elements. , Thorough Cleaning Of Seal Housing, Liner And Mating Surfaces And Seal Seating Area. , Inspection Of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring And Corrosion, Repair/Refurbish Defects. , Renewal Of Mantex Packing, O Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)). , Inspect And Renewal Of Fasteners, Studs, Mounting Threads And Gaskets. , Reassembly Of Seal Assembly With Correct Clearances And Alignment. , Refitment Of All Removed Pipeline/Fittings. , Pressure Testing Of Inflatable Seal System And Functional Test And Leak Test Is To Be Carried Out, Repair Defects If Any. , Dismantle The Existing Gland Assemblies Of Port & Starboard Rudders Comprising Of Planetary Gear Arrangement , Overhauling Of Planetary Gear Arrangement , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangement Including Re-Tapping Of Damaged Threads. Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing. , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers. , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Degutting Of Valves (Type - Nrp/ Sdnr 125Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. , Degutting Of Valves (Type - Nrp/ Sdnr 150Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop , Degutting Of Valves (Type - Nrp/ Sdnr 200Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop , Repair/Renewal (Type - Nrp/ Sdnr 125Mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Repair/Renewal (Type - Nrp/ Sdnr 150Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones , Repair/Renewal (Typo - Nrp/ Sdnr 200Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings, , Reassembly: (Type - Nrp/ Sdnr 125Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test , Reassembly: (Type - Nrp / Sdnr 150Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Reassembly. (Type - Nrp/ Sdnr 200Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test , Testing At Workshop (Type - Nrp/ Sdnr 125Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 150Mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 200Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard (Type - Nrp/ Sdnr 125Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard - (Type - Nrp/ Sdnr 150Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard (Type- Nrp/ Sdnr 200Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any.

BOQ

Sl. No. Item TitleItem Description
1Degutting of Guards, Pipelines, Fittings and Associated Fittings to Access Deep Sea Seal Assembly.Degutting of Guards, Pipelines, Fittings and Associated Fittings to Access Deep Sea Seal Assembly.
2Opening of Deep Sea Seal Housing and Complete Dismantling of Seal Assembly, Mantex. ‘O' Cords, Inflatable Seal and Associated Sealing Elements.Opening of Deep Sea Seal Housing and Complete Dismantling of Seal Assembly, Mantex. ‘O' Cords, Inflatable Seal and Associated Sealing Elements.
3Thorough Cleaning of Seal Housing, Liner and Mating Surfaces and Seal Seating Area.Thorough Cleaning of Seal Housing, Liner and Mating Surfaces and Seal Seating Area.
4Inspection of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring and Corrosion, Repair/Refurbish Defects.Inspection of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring and Corrosion, Repair/Refurbish Defects.
5Renewal of Mantex Packing, 'O' Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)).Renewal of Mantex Packing, 'O' Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)).
6Inspect and Renewal of Fasteners, Studs, Mounting Threads and Gaskets.Inspect and Renewal of Fasteners, Studs, Mounting Threads and Gaskets.
7Reassembly of Seal Assembly With Correct Clearances and Alignment.Reassembly of Seal Assembly With Correct Clearances and Alignment.
8Refitment of All Removed Pipeline/Fittings.Refitment of All Removed Pipeline/Fittings.
9Pressure Testing Of Inflatable Seal System and Functional Test and Leak Test is To Be Carried Out, Repair Defects if any.Pressure Testing Of Inflatable Seal System and Functional Test and Leak Test is To Be Carried Out, Repair Defects if any.
10Dismantle The Existing Gland Assemblies of Port & Starboard Rudders Comprising of Planetary Gear ArrangementDismantle The Existing Gland Assemblies of Port & Starboard Rudders Comprising of Planetary Gear Arrangement
11Overhauling of Planetary Gear ArrangementOverhauling of Planetary Gear Arrangement
12Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside.Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside.
13Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent to Remove Dirt, Rust, Oil & Old Packing Traces.Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent to Remove Dirt, Rust, Oil & Old Packing Traces.
14Inspect The Following Components For Wear Deformation or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned.Inspect The Following Components For Wear Deformation or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned.
15Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly AlignedCheck The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned
16Carry Out Repair/Replacement as Required In Defective Pressing & Securing Arrangement Including Re-Tapping of Damaged Threads. Replacement of Corroded or Worn Fasteners Correction of Distorted Gland Follower Faces or Pressing Plates.Carry Out Repair/Replacement as Required In Defective Pressing & Securing Arrangement Including Re-Tapping of Damaged Threads. Replacement of Corroded or Worn Fasteners Correction of Distorted Gland Follower Faces or Pressing Plates.
17Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation.Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation.
18Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai)Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai)
19Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing.Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing.
20Verify Free Movement Of Rudder & Main Shaft After Packing Renewal.Verify Free Movement Of Rudder & Main Shaft After Packing Renewal.
21Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing.Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing.
22After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings.After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings.
23Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers.Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers.
24Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside.Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside.
25Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces.Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces.
26Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned.Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned.
27Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly AlignedCheck The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned
28Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates.Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates.
29Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation.Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation.
30Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai)Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai)
31Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective SealingRefit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing
32Verify Free Movement Of Rudder & Main Shaft After Packing Renewal.Verify Free Movement Of Rudder & Main Shaft After Packing Renewal.
33Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing.Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing.
34After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings.After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings.
35Degutting of Valves (Type - NRP/ SDNR 125mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop.Degutting of Valves (Type - NRP/ SDNR 125mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop.
36Degutting of Valves (Type - NRP/ SDNR 150mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To WorkshopDegutting of Valves (Type - NRP/ SDNR 150mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop
37Degutting of Valves (Type - NRP/ SDNR 200mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To WorkshopDegutting of Valves (Type - NRP/ SDNR 200mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop
38Repair/Renewal (Type - NRP/ SDNR 125mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones.Repair/Renewal (Type - NRP/ SDNR 125mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones.
39Repair/Renewal (Type - NRP/ SDNR 150mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New OnesRepair/Renewal (Type - NRP/ SDNR 150mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones
40Repair/Renewal (Typo - NRP/ SDNR 200mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings,Repair/Renewal (Typo - NRP/ SDNR 200mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings,
41Reassembly: (Type - NRP/ SDNR 125mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure TestReassembly: (Type - NRP/ SDNR 125mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test
42Reassembly: (Type - Nrp / Sdnr 150mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test.Reassembly: (Type - Nrp / Sdnr 150mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test.
43Reassembly. (Type - NRP/ SDNR 200mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure TestReassembly. (Type - NRP/ SDNR 200mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test
44Testing At Workshop (Type - NRP/ SDNR 125mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure.Testing At Workshop (Type - NRP/ SDNR 125mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure.
45Testing At Workshop (Type - NRP/ SDNR 150mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure.Testing At Workshop (Type - NRP/ SDNR 150mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure.
46Testing At Workshop (Type - NRP/ SDNR 200mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times of Working Pressure.Testing At Workshop (Type - NRP/ SDNR 200mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times of Working Pressure.
47Refitting Onboard (Type - NRP/ SDNR 125mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.Refitting Onboard (Type - NRP/ SDNR 125mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.
48Refitting Onboard - (Type - NRP/ SDNR 150mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.Refitting Onboard - (Type - NRP/ SDNR 150mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any.
49Refitting Onboard (Type- NRP/ SDNR 200mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any.Refitting Onboard (Type- NRP/ SDNR 200mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any.

AI Tender Summary

OUR REF NO 57071800
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 25-08-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Tabar At Nd (Mbi); Routines On Deep Sea Seal, Rudder, Stabiliser And Underwater Valves Ins Tabar; Service Provider - Degutting Of Guards, Pipelines, Fittings And Associated Fittings To Access Deep Sea Seal Assembly. , Opening Of Deep Sea Seal Housing And Complete Dismantling Of Seal Assembly, Mantex. ‘O Cords, Inflatable Seal And Associated Sealing Elements. , Thorough Cleaning Of Seal Housing, Liner And Mating Surfaces And Seal Seating Area. , Inspection Of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring And Corrosion, Repair/Refurbish Defects. , Renewal Of Mantex Packing, O Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)). , Inspect And Renewal Of Fasteners, Studs, Mounting Threads And Gaskets. , Reassembly Of Seal Assembly With Correct Clearances And Alignment. , Refitment Of All Removed Pipeline/Fittings. , Pressure Testing Of Inflatable Seal System And Functional Test And Leak Test Is To Be Carried Out, Repair Defects If Any. , Dismantle The Existing Gland Assemblies Of Port & Starboard Rudders Comprising Of Planetary Gear Arrangement , Overhauling Of Planetary Gear Arrangement , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangement Including Re-Tapping Of Damaged Threads. Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing. , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers. , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Degutting Of Valves (Type - Nrp/ Sdnr 125Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. , Degutting Of Valves (Type - Nrp/ Sdnr 150Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop , Degutting Of Valves (Type - Nrp/ Sdnr 200Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop , Repair/Renewal (Type - Nrp/ Sdnr 125Mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Repair/Renewal (Type - Nrp/ Sdnr 150Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones , Repair/Renewal (Typo - Nrp/ Sdnr 200Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings, , Reassembly: (Type - Nrp/ Sdnr 125Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test , Reassembly: (Type - Nrp / Sdnr 150Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Reassembly. (Type - Nrp/ Sdnr 200Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test , Testing At Workshop (Type - Nrp/ Sdnr 125Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 150Mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 200Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard (Type - Nrp/ Sdnr 125Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard - (Type - Nrp/ Sdnr 150Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard (Type- Nrp/ Sdnr 200Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any.
Basic Detail
Tender No GEM/2026/B/7901999
Bidding Type Tender
Location
City Mumbai
State Maharashtra
Key Dates
Publish Date 18 Aug 2026
Submission Date 25 Aug 2026
Open Date 25 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 4.10 Lakhs
Exemption Not Available
Document List
7af39146-8805-4880-acba-d5b977aa575a.pdf
1786531631.pdf
1786531634.pdf
1787041368.xlsx
FINAL_8649ab35-1a21-4a80-86581787045942334_COM_FM.pdf
SafetyClau_0d7f3a97-d273-4524-bda41787046523293_COM_FM.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 25, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 1 day
Aug 25, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 1 day

Tender Documents

Download All (ZIP) ↓
pdf

7af39146-8805-4880-acba-d5b977aa575a.pdf

pdf

1786531631.pdf

pdf

1786531634.pdf

xlsx

1787041368.xlsx

pdf

FINAL_8649ab35-1a21-4a80-86581787045942334_COM_FM.pdf

pdf

SafetyClau_0d7f3a97-d273-4524-bda41787046523293_COM_FM.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders