Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Tabar At Nd (Mbi); Routines On Deep Sea Seal, Rudder, Stabiliser And Underwater Valves Ins Tabar; Service Provider - Degutting Of Guards
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard Ins Tabar At Nd (Mbi); Routines On Deep Sea Seal, Rudder, Stabiliser And Underwater Valves Ins Tabar; Service Provider - Degutting Of Guards, Pipelines, Fittings And Associated Fittings To Access Deep Sea Seal Assembly. , Opening Of Deep Sea Seal Housing And Complete Dismantling Of Seal Assembly, Mantex. ‘O Cords, Inflatable Seal And Associated Sealing Elements. , Thorough Cleaning Of Seal Housing, Liner And Mating Surfaces And Seal Seating Area. , Inspection Of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring And Corrosion, Repair/Refurbish Defects. , Renewal Of Mantex Packing, O Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)). , Inspect And Renewal Of Fasteners, Studs, Mounting Threads And Gaskets. , Reassembly Of Seal Assembly With Correct Clearances And Alignment. , Refitment Of All Removed Pipeline/Fittings. , Pressure Testing Of Inflatable Seal System And Functional Test And Leak Test Is To Be Carried Out, Repair Defects If Any. , Dismantle The Existing Gland Assemblies Of Port & Starboard Rudders Comprising Of Planetary Gear Arrangement , Overhauling Of Planetary Gear Arrangement , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangement Including Re-Tapping Of Damaged Threads. Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing. , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers. , Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. , Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces. , Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. , Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned , Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. , Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. , Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) , Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing , Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. , Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. , After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. , Degutting Of Valves (Type - Nrp/ Sdnr 125Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. , Degutting Of Valves (Type - Nrp/ Sdnr 150Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop , Degutting Of Valves (Type - Nrp/ Sdnr 200Mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop , Repair/Renewal (Type - Nrp/ Sdnr 125Mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. , Repair/Renewal (Type - Nrp/ Sdnr 150Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones , Repair/Renewal (Typo - Nrp/ Sdnr 200Mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings, , Reassembly: (Type - Nrp/ Sdnr 125Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test , Reassembly: (Type - Nrp / Sdnr 150Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. , Reassembly. (Type - Nrp/ Sdnr 200Mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test , Testing At Workshop (Type - Nrp/ Sdnr 125Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 150Mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Testing At Workshop (Type - Nrp/ Sdnr 200Mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times Of Working Pressure. , Refitting Onboard (Type - Nrp/ Sdnr 125Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard - (Type - Nrp/ Sdnr 150Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. , Refitting Onboard (Type- Nrp/ Sdnr 200Mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any.
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Degutting of Guards, Pipelines, Fittings and Associated Fittings to Access Deep Sea Seal Assembly. | Degutting of Guards, Pipelines, Fittings and Associated Fittings to Access Deep Sea Seal Assembly. |
| 2 | Opening of Deep Sea Seal Housing and Complete Dismantling of Seal Assembly, Mantex. ‘O' Cords, Inflatable Seal and Associated Sealing Elements. | Opening of Deep Sea Seal Housing and Complete Dismantling of Seal Assembly, Mantex. ‘O' Cords, Inflatable Seal and Associated Sealing Elements. |
| 3 | Thorough Cleaning of Seal Housing, Liner and Mating Surfaces and Seal Seating Area. | Thorough Cleaning of Seal Housing, Liner and Mating Surfaces and Seal Seating Area. |
| 4 | Inspection of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring and Corrosion, Repair/Refurbish Defects. | Inspection of Shaft Liner, Seal Seating Area And Housing For Wear, Scoring and Corrosion, Repair/Refurbish Defects. |
| 5 | Renewal of Mantex Packing, 'O' Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)). | Renewal of Mantex Packing, 'O' Cords And Inflatable Seal With New Fittings (Spares Will Be Provided By Dockyard)). |
| 6 | Inspect and Renewal of Fasteners, Studs, Mounting Threads and Gaskets. | Inspect and Renewal of Fasteners, Studs, Mounting Threads and Gaskets. |
| 7 | Reassembly of Seal Assembly With Correct Clearances and Alignment. | Reassembly of Seal Assembly With Correct Clearances and Alignment. |
| 8 | Refitment of All Removed Pipeline/Fittings. | Refitment of All Removed Pipeline/Fittings. |
| 9 | Pressure Testing Of Inflatable Seal System and Functional Test and Leak Test is To Be Carried Out, Repair Defects if any. | Pressure Testing Of Inflatable Seal System and Functional Test and Leak Test is To Be Carried Out, Repair Defects if any. |
| 10 | Dismantle The Existing Gland Assemblies of Port & Starboard Rudders Comprising of Planetary Gear Arrangement | Dismantle The Existing Gland Assemblies of Port & Starboard Rudders Comprising of Planetary Gear Arrangement |
| 11 | Overhauling of Planetary Gear Arrangement | Overhauling of Planetary Gear Arrangement |
| 12 | Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. | Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. |
| 13 | Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent to Remove Dirt, Rust, Oil & Old Packing Traces. | Clean The Stuffing Box Gland Follower & Stock Surfaces Thoroughly Using Approved De-Greasing Agent to Remove Dirt, Rust, Oil & Old Packing Traces. |
| 14 | Inspect The Following Components For Wear Deformation or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. | Inspect The Following Components For Wear Deformation or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. |
| 15 | Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned | Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned |
| 16 | Carry Out Repair/Replacement as Required In Defective Pressing & Securing Arrangement Including Re-Tapping of Damaged Threads. Replacement of Corroded or Worn Fasteners Correction of Distorted Gland Follower Faces or Pressing Plates. | Carry Out Repair/Replacement as Required In Defective Pressing & Securing Arrangement Including Re-Tapping of Damaged Threads. Replacement of Corroded or Worn Fasteners Correction of Distorted Gland Follower Faces or Pressing Plates. |
| 17 | Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. | Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. |
| 18 | Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) | Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) |
| 19 | Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing. | Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing. |
| 20 | Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. | Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. |
| 21 | Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. | Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. |
| 22 | After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. | After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. |
| 23 | Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers. | Dismantle The Existing Gland Assemblies Of Port & Starboard Stabilisers. |
| 24 | Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. | Removal Of All Old Gland Packing Completely From Stuffing Boxes Ensuring No Remnants Remain Inside. |
| 25 | Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces. | Clean The Stuffing Box Gland Follower & Shaft Surfaces Thoroughly Using Approved De-Greasing Agents To Remove Dirt, Rust, Oil & Old Packing Traces. |
| 26 | Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. | Inspect The Following Components For Wear Deformation Or Damage Gland Follower & Gland Body Stuffing Box Bore & Stealing Surfaces Shaft Area In Way Of Gland Packing Gland Pressing & Securing Arrangement For Free Movements And Uniform Pressure Application Ensure Securing Arrangements (Studs Bolts, Nut & Washers) Are In Sound Condition And Properly Aligned. |
| 27 | Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned | Check The Gland Pressing Arrangements For Free Movement & Uniform Pressure Application Ensure Securing Arrangements Are In Sound Condition & Properly Aligned |
| 28 | Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. | Carry Out Repair/Replacement As Required In Defective Pressing & Securing Arrangements Including Re-Tapping Of Damaged Threads Replacement Of Corroded Or Worn Fasteners Correction Of Distorted Gland Follower Faces Or Pressing Plates. |
| 29 | Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. | Apply Suitable Marine Grade Lubricant Or Grease To The Packing Area & Shaft Prior To Installation. |
| 30 | Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) | Install New Gland Packing Ensure Correct Numbers Of Turns & Staggered Joint Placement (Packing Will Be Provided By Naval Dockyard Mumbai) |
| 31 | Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing | Refit Gland Packing Follower & Progressively Tighten Securing Bolts In A Crisis - Cross Pattern To Ensure Uniform Compression & Effective Sealing |
| 32 | Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. | Verify Free Movement Of Rudder & Main Shaft After Packing Renewal. |
| 33 | Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. | Conduct Leak/Pressure Test Under Supervision Of Ship Staff To Confirm Satisfactory Performance Of Gland Sealing. |
| 34 | After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. | After Successful Testing Apply Suitable Corrosion Preventive Compound & Touch-Up Painting On Gland Body & Associated Fittings. |
| 35 | Degutting of Valves (Type - NRP/ SDNR 125mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. | Degutting of Valves (Type - NRP/ SDNR 125mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop. |
| 36 | Degutting of Valves (Type - NRP/ SDNR 150mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop | Degutting of Valves (Type - NRP/ SDNR 150mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages Remove Foundation Bolts/Studs. Provide Blanking Of Open Pipe Ends/Valve Chest After Removal Tag Type And Location Of Valve Lift And Transport Valves Safely To Workshop |
| 37 | Degutting of Valves (Type - NRP/ SDNR 200mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop | Degutting of Valves (Type - NRP/ SDNR 200mm) Disconnect Pipelines, Actuators, Hand Wheels And Linkages. Remove Foundation Bolts/Studs Provide Blanking Of Open Pipe Ends/Valve Chest After Removal. Tag Type And Location Of Valve. Lift And Transport Valves Safely To Workshop |
| 38 | Repair/Renewal (Type - NRP/ SDNR 125mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. | Repair/Renewal (Type - NRP/ SDNR 125mm) Completely Dismantle/Degut The Valve Including Body, Bonet. Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings Bushes, Bearings, Studs, Nuts, Seals And Packing Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required. Replace All Rubber Components And Sealing Elements With New Ones. |
| 39 | Repair/Renewal (Type - NRP/ SDNR 150mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones | Repair/Renewal (Type - NRP/ SDNR 150mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Seat Rings, Bushes, Gland Packing, Seals, Fasteners Etc. Clean All Components And Carry Out Detailed Inspection. Renew Defective/Worn Out Parts Such As Spindle, Disc, Seat Rings, Bushes, Bearings, Studs, Nuts, Seals And Packing. Carry Out Machining, Lapping Of Seats/Discs And Approved Welding/ Build-Up If Required, Replace All Rubber Components And Sealing Elements With New Ones |
| 40 | Repair/Renewal (Typo - NRP/ SDNR 200mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings, | Repair/Renewal (Typo - NRP/ SDNR 200mm) Completely Dismantle/Degut The Valve Including Body, Bonet, Spindle/Stem, Disc, Sent Rings, Bushes, Gland Packing, Seals, Fasteners Etc Clean All Components And Carry Out Detailed Inspection Renew Defective/Worn Out Parts Such Ns Spindle, Disc, Soul Rings, Bushes, Bearings, |
| 41 | Reassembly: (Type - NRP/ SDNR 125mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test | Reassembly: (Type - NRP/ SDNR 125mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances. Lubricate With Approved Grade Lubricants Conduct Hydrostatic Body Pressure Test |
| 42 | Reassembly: (Type - Nrp / Sdnr 150mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. | Reassembly: (Type - Nrp / Sdnr 150mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test. |
| 43 | Reassembly. (Type - NRP/ SDNR 200mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test | Reassembly. (Type - NRP/ SDNR 200mm) Reassemble Valve With New Gaskets And Packing Ensure Correct Alignment And Clearances, Lubricate With Approved Grade Lubricants. Conduct Hydrostatic Body Pressure Test |
| 44 | Testing At Workshop (Type - NRP/ SDNR 125mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure. | Testing At Workshop (Type - NRP/ SDNR 125mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure. |
| 45 | Testing At Workshop (Type - NRP/ SDNR 150mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure. | Testing At Workshop (Type - NRP/ SDNR 150mm) Conduct Hydrostatic Body Pressure Test. Conduct Sea Leakage Test. Carryout Functional / Operational Testing At 2 Times of Working Pressure. |
| 46 | Testing At Workshop (Type - NRP/ SDNR 200mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times of Working Pressure. | Testing At Workshop (Type - NRP/ SDNR 200mm) Conduct Hydrostatic Body Pressure Test Conduct Sea Leakage Test Carryout Functional / Operational Testing At 2 Times of Working Pressure. |
| 47 | Refitting Onboard (Type - NRP/ SDNR 125mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. | Refitting Onboard (Type - NRP/ SDNR 125mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts. Renew Worn Out Foundation Studs/ Bolts All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System. Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. |
| 48 | Refitting Onboard - (Type - NRP/ SDNR 150mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. | Refitting Onboard - (Type - NRP/ SDNR 150mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connections And Foundation Bolts, Renew Worn Out Foundation Studs/ Bolts. All Fasteners Shall Be Replaced With New Corrosion-Resistant, Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification. Reconnect Actuators/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard. Rectify Defects If Any. |
| 49 | Refitting Onboard (Type- NRP/ SDNR 200mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any. | Refitting Onboard (Type- NRP/ SDNR 200mm) Refit Overhauled Valves Onboard With New Joint Gaskets Tighten All Connection And Foundation Bolts Renew Worn Out Foundation Studs/Bolts All Fastener Shall Be Replaced With New Corrosion Resistant Marine Grade Fasteners Suitable For Continuous Sweater Exposure, As Per Specification Reconnects/Linkages And Restore System Carry Out System Pressure Testing And Operational Trial Onboard Rectify Defects If Any. |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender