Tender For Lowering Unlowering Work Under Sub Dn Bilara
Tender Overview
Project Description
Tender For Lowering Unlowering Work Under Sub Dn Bilara- 1 Unlowering Of Submersible Pump Set Along With Lowering Pipes With Depth Up To 120 Mtr And Submersible Cable With Safety From Tube Well, Checking The Pump Set, Transportation Of Pump Set From Tube Well Site To Store As Direction, Receiving Repaired / New Pump Set From Store/ Divisional Store , Testing The Same, Transportation To Site And Lowering Back Into Tube Well Along With Submersible Cable, Lowering Pipes, Specials Etc And Commissioning Of The Tube Well. The Job Also Includes Cable Jointing, Checking Of Discharge Of Pump Set, Interconnection Of Lowering Pipe From Nearby Distribution Pipe Line, Checking Of Starter And Reporting For Completion Of Job Or Fault/Problem If Any. (Upto 20 Km Distance Run By Lowering Machine) 2 For Three Phase Pump Set 3 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 50 Mm 4 65 Mm 5 80 Mm 6 Hdpe Pipe Lowering Assembly Of Nominal Dia 63 Mm 7 75 Mm 8 90 Mm 9 Add Above Item 1.1 For Depth Above 120 Mtr For Each 10 Mtr Depth 10% 10 Add Above Item 1.1 For Distance Run Above 20 Km For Each 5 Km Distance Run. 10 % 11 For Single Phase Pump Set 12 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 32 Mm 13 50 Mm 14 Hdpe Pipe Lowering Assembly Of Nominal Dia 15 32 Mm 16 40 Mm 17 50 Mm 18 Add Above Item 1.1 For Depth Above 120 Mtr For Each 10 Mtr Depth 10% 19 Add Above Item 1.1 For Distance Run Above 20 Km For Each 5 Km Distance Run. 10 % 20 Only Unlowering Of Submersible Pump Set Along With Lowering Pipes Depth Up To 120 Mtr And Submersible Cable With Safety From Tube Well, Checking The Pump Set, Reporting And Transportation Of Pump Set From Tube Well Site To Store As Per Direction. 21 For Three Phase Pump Set 22 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 50 Mm 23 65 Mm 24 80 Mm 25 Hdpe Pipe Unlowering Assembly Of Nominal Dia 63 Mm 26 75 Mm 27 90 Mm 28 Add Above Item 2.1 For Depth Above 120 Mtr For Each 10 Mtr Depth 10% 29 Add Above Item 1.1 For Distance Run Above 20 Km For Each 5 Km Distance Run. 10 % 30 For Single Phase Pump Set 31 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 32 Mm 32 50 Mm 33 Hdpe Pipe Lowering Assembly Of Nominal Dia 32 Mm 34 40 Mm 35 50 Mm 36 Only Lowering Of The Submersible Pump Set Into Tube Well Along With Submersible Cable, Lowering Pipes Depth Up To 120 Mtr, Specials Etc And Commissioning Of The Tube Well. The Job Also Includes Cable Jointing, Checking Of Discharge Of Pump Set, Interconnection Of Lowering Pipe From Nearby Distribution Pipe Line, Checking Of Starter And Reporting For Completion Of Job Or Fault/Problem If Any. 37 For Three Phase Pump Set 38 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 50 Mm 39 65 Mm 40 80 Mm 41 Hdpe Pipe Lowering Assembly Of Nominal Dia 63 Mm 42 75 Mm 43 90 Mm 44 Add Above Item 3.1For Depth Above 120 Mtr For Each 10 Mtr Depth 10% 45 Add Above Item 1.1 For Distance Run Above 20 Km For Each 5 Km Distance Run. 10 % 46 For Single Phase Pump Set 47 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 32 Mm 48 50 Mm 49 Hdpe Pipe Lowering Assembly Of Nominal Dia 32 Mm 50 40 Mm 51 50 Mm 52 Add Above Item 1.1 For Depth Above 120 Mtr For Each 10 Mtr Depth 10% 53 Add Above Item 1.1 For Distance Run Above 20 Km For Each 5 Km Distance Run. 10 % 54 Increasing Of Lowering Pipes In Tube Wells Including Cost Of Nut Bolts And Rubber Gaskets / Jointing Material And Pvc Rope And Transporatation Of Cable And Extra Lowering Pipe From Store.. However Submersible Cable And Extra Lowering Pipe Shall Be Provided By The Department At Store. 55 For Three Phase Pump Set 56 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia ( For Incease Up To 30 Mtr Length Of Pipe) 50 Mm 57 65 Mm 58 80 Mm 59 Hdpe Pipe Lowering Assembly Of Nominal Dia 63 Mm 60 75 Mm 61 90 Mm 62 For Single Phase Pump Set 63 G.I. Double Flanged Pipe Lowering Assembly Of Nominal Dia 32 Mm 64 50 Mm 65 Hdpe Pipe Lowering Assembly Of Nominal Dia For Increase 20 Mtr Assembly Pipe 32 Mm 66 40 Mm 67 50 Mm 68 Add Above Item For Depth Above 20 Mtr Or Two D/F Pipe Assembly For Each 10 Mtr Depth 10% 69 Add Above Item For Distance Run Above 20 Km For Each 5 Km Distance Run. 10% 70 Unlowering Of Pump Set Along With Lowering Pipes And Submersible Cable With Safety From Openwell For Three Phase Pump Set Having G.I Double Flanged/ Hdpe Pipe Lowering Asembly Of Size 50 Mm To 80 Mm, Checking The Pump Set, Reporting And Transportation Of Pump Set From Tube Well Site To Store. Add Above Item For Distance Run Above 20 Km For Each 5 Km Distance Run. 10% 71 Lowering Of Repaired/New Pump Set Along With Lowering Pipes And Submersible Cable With Safety In Openwell For Three Phase Pump Set Having G.I Double Flanged/ Hdpe Pipe Lowering Asembly Of Size 50 Mm To 80 Mm. It Includes Receiving Repaired / New Pump Set From Store / Work Shop With In Boundry Area Of Division And Testing The Same, Transportation To Site And Commissioning. Add Above Item For Distance Run Above 20 Km For Each 5 Km Distance Run.
BOQ
| Sl. No. | Item Description |
| 1 | Unlowering of submersible pump set along with lowering pipes with depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, transportation of pump set from tube well site to store as direction, receiving repaired / new pump set from store/ divisional store , testing the same, transportation to site and lowering back into tube well along with submersible cable, lowering pipes, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any. (Upto 20 Km distance run by lowering machine) |
| 2 | For three Phase pump set |
| 3 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50 mm |
| 4 | 65 mm |
| 5 | 80 mm |
| 6 | HDPE Pipe Lowering Assembly of nominal dia 63 mm |
| 7 | 75 mm |
| 8 | 90 mm |
| 9 | Add above item 1.1 for depth above 120 mtr for each 10 mtr depth 10% |
| 10 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. 10 % |
| 11 | For single Phase pump set |
| 12 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 32 mm |
| 13 | 50 mm |
| 14 | HDPE Pipe Lowering Assembly of nominal dia |
| 15 | 32 mm |
| 16 | 40 mm |
| 17 | 50 mm |
| 18 | Add above item 1.1 for depth above 120 mtr for each 10 mtr depth 10% |
| 19 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. 10 % |
| 20 | Only unlowering of submersible pump set along with lowering pipes depth up to 120 mtr and submersible cable with safety from tube well, checking the pump set, reporting and transportation of pump set from tube well site to store as per direction. |
| 21 | For three phase pump set |
| 22 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50 mm |
| 23 | 65 mm |
| 24 | 80 mm |
| 25 | HDPE Pipe UnLowering Assembly of nominal dia 63 mm |
| 26 | 75 mm |
| 27 | 90 mm |
| 28 | Add above item 2.1 for depth above 120 mtr for each 10 mtr depth 10% |
| 29 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. 10 % |
| 30 | For single Phase pump set |
| 31 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 32 mm |
| 32 | 50 mm |
| 33 | HDPE Pipe Lowering Assembly of nominal dia 32 mm |
| 34 | 40 mm |
| 35 | 50 mm |
| 36 | Only lowering of the submersible pump set into tube well along with submersible cable, lowering pipes depth up to 120 mtr, specials etc and commissioning of the tube well. The job also includes cable jointing, checking of discharge of pump set, interconnection of lowering pipe from nearby distribution pipe line, checking of starter and reporting for completion of Job or fault/problem if any. |
| 37 | For three phase pump set |
| 38 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 50 mm |
| 39 | 65 mm |
| 40 | 80 mm |
| 41 | HDPE Pipe Lowering Assembly of nominal dia 63 mm |
| 42 | 75 mm |
| 43 | 90 mm |
| 44 | Add above item 3.1for depth above 120 mtr for each 10 mtr depth 10% |
| 45 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. 10 % |
| 46 | For single Phase pump set |
| 47 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 32 mm |
| 48 | 50 mm |
| 49 | HDPE Pipe Lowering Assembly of nominal dia 32 mm |
| 50 | 40 mm |
| 51 | 50 mm |
| 52 | Add above item 1.1 for depth above 120 mtr for each 10 mtr depth 10% |
| 53 | Add above item 1.1 for distance run above 20 Km for each 5 Km distance run. 10 % |
| 54 | Increasing of lowering pipes in tube wells including cost of nut bolts and rubber gaskets / jointing material and PVC rope and transporatation of cable and extra lowering pipe from store.. However submersible cable and extra lowering pipe shall be provided by the department at store. |
| 55 | For three phase pump set |
| 56 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia ( For incease up to 30 Mtr length of pipe) 50 mm |
| 57 | 65 mm |
| 58 | 80 mm |
| 59 | HDPE Pipe Lowering Assembly of nominal dia 63 mm |
| 60 | 75 mm |
| 61 | 90 mm |
| 62 | For single Phase pump set |
| 63 | G.I. Double Flanged Pipe Lowering Assembly of nominal dia 32 mm |
| 64 | 50 mm |
| 65 | HDPE Pipe Lowering Assembly of nominal dia For Increase 20 Mtr Assembly pipe 32 mm |
| 66 | 40 mm |
| 67 | 50 mm |
| 68 | Add above item for depth above 20 mtr or two D/F pipe assembly for each 10 mtr depth 10% |
| 69 | Add above item for distance run above 20 Km for each 5 Km distance run. 10% |
| 70 | Unlowering of pump set along with lowering pipes and submersible cable with safety from Openwell For three Phase pump set having G.I double flanged/ HDPE pipe lowering asembly of size 50 mm to 80 mm, checking the pump set, reporting and transportation of pump set from tube well site to store. Add above item for distance run above 20 Km for each 5 Km distance run. 10% |
| 71 | Lowering of repaired/New pump set along with lowering pipes and submersible cable with safety in Openwell For three Phase pump set having G.I double flanged/ HDPE pipe lowering asembly of size 50 mm to 80 mm. It includes receiving repaired / new pump set from store / Work shop with in boundry area of division and testing the same, transportation to site and commissioning. Add above item for distance run above 20 Km for each 5 Km distance run. |
| 72 | Add above item for distance run above 20 Km for each 5 Km distance run. 10% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 3 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender