Tender For Upgradation Of Sdh System With Ip/Mpls System At Stations Of Line 3 And 6 Of Dmrc
Tender Overview
Project Description
Tender for Upgradation Of Sdh System With Ip/Mpls System At Stations Of Line 3 And 6 Of Dmrc
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 07-Sep-2026 | Addendum-01 | Date | 23-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Preamble |
| 2 | The bill Quantities shall be read in conjunction with Notice Inviting Tenders, Instructions to tenderers, General and Special Conditions of Contract, Employers Requirements and other relevant documents |
| 3 | BoQ1 consists of Schedule ‘A’ for Supply of Hardware and Schedule ‘B’ for Service.The rates and prices to be tendered in the unit Priced Bill of Quantities of Schedule ‘A’ and Schedule ‘B’ are for completed and finished items of works and complete in all respect. |
| 4 | Tenderers shall quote their offer in Indian Rupees (₹) only. |
| 5 | Tenderers shall quote their offer in Indian Rupees (INR) only. Tenderers are required to be quoted percentage (%) Excess/Less/At par for schedule-A and Schedule-B in figures in the appropriate highlighted cells in the BoQ1 sheet. All the quoted rates will be deemed to include Duties, Taxes, Octroi, Royalty etc., cost of all plants, labour, supervision, materials, transport, all temporary works, erection, maintenance, utility identification, contractor’s profit and establishment/ overheads, together with preparation of design and drawings, all general risks, insurance liabilities, compliance of labour laws and obligations set out or implied in the contracts. For taxes and duties refer clause C2.5 of ITT & clause 10 of SCC. |
| 6 | The price offer in the BOQ shall be given without considering any deviation mentioned in Appendix-3 of FOT i.e. price in the box shall be quoted as per tender conditions without any deviation. |
| 7 | If the tenderer fails to quote percentage against BOQ item, the tender may be treated as incomplete and non- responsive and shall be rejected. |
| 8 | Errors will be corrected by the employer for any arithmetical errors in computation or summation as per contract conditions. |
| 9 | The Financial Proposal (as per BOQ) shall be uploaded online on the website http://eprocure.gov.in/eprocure/app. The rates/ percentages shall be quoted in the excel file provided in the bid documents. The tenderer shall download the excel file and quote percentage in figures against BOQ amount in the appropriate highlighted cells in Excel sheet namely \\"BoQ1\\". After quoting their rates the excel file shall be uploaded accordingly. The rates shall not be offered/quoted elsewhere in the technical submission/ tender submission. |
| 10 | The actual work executed against all the BOQ as detailed in tender document would be paid on measurement basis. |
| 11 | The contractor may raise their “On Account” payments on monthly basis as per the status of work on the last day of the respective month as per clause 12 of SCC. |
| 12 | Schedule 'A' |
| 13 | Schedule 'B' Delhi Metro Rail Corporation Bill of Quantity Name of Work: Contract: Tele-13/2026 “Upgradation of SDH System with IP/MPLS System at Stations of Line 3 and 6 of DMRC” S.NO. Description UNIT QTY Unit price (Exculsive of GST) (in INR) GST Price per unit(in INR) Total unit price inclusive of GST(in INR) Total Amount (Exculsive of GST)(in INR) Total Amount(Inclusive of GST)(in INR) Schedule A \\"Supply of Hardware\\" |
| 14 | Supply of IP/MPLS node/equipment/router with chassis capacity of minimum 30 Gigabit (Full duplex). Equipment must provide minimum 32 E1's drop at each node , minimum 24 X 100/1000 Mbps Ethernet ports and minimum 02 X 10 Gbps full duplex Optical fiber enabled ports each, for upline station and downline station connected in a ring with relevant SFP (Short haul or Long Haul as the case maybe). Redundancy must be provided across electrical,optical,ethernet and E1 interface card level and slot level + Redundant CPU & power supply unit. Node/Equipment/Router must have conformal coating or PCB Enhanced Plating for corrosion mitigation. (The cost of each node must include cost for Power Distribution box containing appropriate incomer MCB or ELCB as the case maybe at which power source will be provided by DMRC, Required number of MCCB's or RCCB's whichever applicable, MCBs and RCCBs at IP/MPLS node/equipment router rack , patch cords (single mode Optical Fiber), SFP's (Short haul 10KM or Long Haul 40 KM as the case may be), DDF/patch panel for terminating 32 E1's ,UTP data cables from IP/MPLS node/equipment/router E1 card to DDF to be terminated for all 32 E1s and upto all subsystems at stations which are using ethernet and E1s, all required connectors, terminations, thimbles, glands, glass wool and any other installation material or accessories and minor civil work as required for the installation, testing and commissioning of Router in Telecom Equipment Room of stations , OCC MB and BCC SHPK.OCC/MB and BCC/SHPK nodes must be installed in full redundancy (1:1). |
| 15 | Supply of Patch Panel (24 Port) |
| 16 | Supply of UTP data cable (Cat5e or better) FRLSZH |
| 17 | Suppy of Cable Tray 100 mm. |
| 18 | Supply of GI flexible 25/32 mm. |
| 19 | Supply of power cables (3 coreX10 sq. mm or 2 coreX10 sq. mm for AC or DC as the case maybe). |
| 20 | Supply of Earthing cable ( minimum 16 sq mm.) |
| 21 | Supply of 19 inch, 42U rack along with under False Floor Base Frame. Total of Schedule 'A' 92224648.0 108825084.64 Schedule B \\"Services\\" |
| 22 | Installation, testing, commissioning, customization, configuration cost of all IP/MPLS nodes/equipment/router at stations and at Occ/MB and BCC/Shpk nodes and Integration of all IP/MPLS nodes/equipment/routers with Existing NMS servers (Everest) at OCC/MB and BCC/Shpk as well as Integration testing with existing SDH system as and where required. |
| 23 | Software licences of Everest NMS for monitoring and managing of all MPLS Nodes from existing NMS installed at OCC MB and BCC Shpk. |
| 24 | Installation of Patch Panel (24 Port) |
| 25 | Laying of UTP data cable (Cat5e or better) FRLSZH. |
| 26 | Installation of cable tray 100 mm. |
| 27 | Installation of GI flexible 25/32 mm. |
| 28 | Laying of power cables (3 coreX10 sq. mm or 2 coreX10 sq. mm for AC or DC as the case maybe). |
| 29 | Installation and fixing of 19 inch, 42U rack along with under False Floor Base Frame. |
| 30 | Laying of Earthing cable ( minimum 16 sq mm.) |
| 31 | Training for IP/MPLS system. (3 weeks local) of minimum 15 staff per batch. |
| 32 | Defect Liability Period support |
| 33 | Application Engineering and documentation which should include handing over of all application, Installation Procedures, node management related software and Drawing/documentalon related to whole project.Any future upgradation of software/patch by OEM to be provided during DLP period as part of this project. Total of Schedule 'B' 14320545.0 16898243.1 Total Schedule 'A' + Schedule 'B' (Inclusive of GST) 106545193.0 125723327.74 Tele-13/2026 APPENDIX- 3A PROFORMA FOR STATEMENT OF MINOR DEVIATIONS (Refer Clause C 2.2(d) and C 15.1 of ITT) 1. The following are the particulars of minor deviations from the requirements of the Tender Document: Sr. No Clause Deviations Price reduction for each deviation/s Note : 1. The Tenderer shall indicate price reduction against each deviation in Appendix-3A of BOQ. This price is the price which the tenderer shall reduce from this tender price if deviation(s) is/are accepted by the Employer. 2. Where there is no deviation, the statement should be returned duly signed with an endorsement indicating ‘No Deviations’. In case, Performa of deviations is not submitted or submitted as blank, it will be construed that the tenderer has not proposed any deviations from tender documents. 3. It shall be noted that in case Nil/Zero/NA Price quoted by Tenderer in Appendix-3A then it shall mean that contractor has quoted same price for deviation and undeviation bid. 4. If the tenderer proposes deviations in tender documents, and/or any other terms and conditions of the tender, other than in this Appendix, it will have no effect. Signature of authorized signatory On behalf of Tenderer Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents