Tender For Sh Wbm Carpeting Seal Coat Pucca Drain Block Protection Work And Other Allied Works Portion From Ch 0.900 Km To Ch 1.280 Km
Tender Value
24.27 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
4 days left
EMD
48542
Bank guarantee accepted
Document Fee
1000
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Sepahijala → Tripura
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Sh Wbm Carpeting Seal Coat Pucca Drain Block Protection Work And Other Allied Works Portion From Ch 0.900 Km To Ch 1.280 Km
BOQ
| Sl. No. | Item Description |
| 1 | Stripping excess soil from the shoulder surface to aciheve the approved level and compacting with plate compactor at OMC as per drawing & MoRD technical specification clause 1903 |
| 2 | Construction of unlined surface drains of average cross-sectional area 0.4 sqm in ordinary soil to specified lines, grades, levels and dimensions. Excavated material to be used in embankment with a lift upto 3 m and lead of 50 m (average lead 25 m) as per MoRD Technical Specification Clause 307. i) Surface Drains in Ordinary Soil A. Manual Means |
| 3 | Providing and laying flat brick brick soling layer on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 4 | Providing and laying brick edging laid lengthwise on prepared subgrade according to lines, grades and cross-section shown on the drawing, filling joints with Earth, free from clay with a Plasticity Index not exceeding 6, watering and rolling the same with three wheeled road roller 80-100 kN as per MoRD Technical Specification Clause 412. |
| 5 | 1) WBM Grading 3 Providing, laying, spreading and compacting jhama brick aggregates of specific sizes to water bound macadam specification including spreading inuniform thickness, hand packing rolling with three wheel roller 80-100 KN in stages to proper grade and camber, applying and brooming binding materials to fill up the interstices of coarse aggregate, watering and compacting to the required density Grading- 3 as per MoRD TechnicalSpecification Clause 405.. A. By Manual Means |
| 6 | Tack coat using hot straight run bitumen of grade VG30 on WBMProviding and applying tack coat using hot straight run bitumen of grade VG30 including heating the bitumen , spraying the bitumen, cleaning and preparing the existing road surface the existing road surface as per specification on WBM @ 0.75 kg / sqm |
| 7 | Providing , laying and rolling of open-graded premix carpet of 20 mm thickness composed of 13.2 mm to 5.6 mm aggregates either using penetration grade bitumen or emulsion to required line, grade and level to serve as wearing course on a previously prepared base , including mixing in a suitable plant, laying and rolling with a three wheel 80 - 100 kN static roller capacity, finished to required level and grades to be followed by seal coat of either Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 508. Case - I : By Manual means i) Bitumen (60/70 Grade)VG-30 |
| 8 | Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using Type A or Type B or Type C or Type D as per MoRD Technical Specification Clause 510 A. By Manual Means Case - IV : Type D (premix with fine sand) i) Bitumen (60/70 Grade)VG-30 |
| 9 | A. Without dewatering. Earthwork in excavation for structures as per drawing and MoRD technical specifications Clause 305.1 including setting out, construction of shoring & bracing, removal of stumps & other deleterious material and disposal upto a lead of 50 m, dressing of sides & bottom and backfilling in trenches with excavated suitable material. a) Ordinary Soil i) Upto 3 m depth |
| 10 | Filling in foundation trenches as per drawing & MoRD technical specification Clause 305.3.9, 1200 I) Sand filling |
| 11 | Providing concrete for plain concrete ( using jhama brick aggregate ) in open foundations complete including formwork as per drawings & MoRD technical specifications Clauses 802, 803, 900, 1202 and 1203. (including centring, shuttering, staging etc. but excluding reinforcement ) A. P.C.C grade M 10 ( using jhama brick aggregate ) a) Nominal mix 1:3:6 |
| 12 | Brick masonry work in cement mortar in foundation complete excluding pointing & plastering as per drawing & MoRD technical specification Clauses 600, 1202 and 1203 (II) Brick Masonry in 1:4 Cement mortar |
| 13 | Providing & laying reinforced cement concrete in superstructure as per drawings & MoRD technical specifications Clauses 800, 900, 1205.4 & 1205.5 (including centring, shuttering, staging etc. but excluding reinforcement ) (I) R.C.C grade M 25 Upto 5m height |
| 14 | Supplying, fitting, & placing Thermo Mechanically treated bar/Cold twisted deformed steel bar reinforcement in superstructure complete as per drawing & MoRD technical specifications Clauses 1002, 1010 & 1202 |
| 15 | Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per MoRD Technical Specification Clause 301.5 |
| 16 | Plastering with cement mortar (1:4) 12 mm thick on brickwork / c.c work including a finishing coat of neat cement punning with 2.75 kg of cement / sqm in substructure as per MoRD technical specification Clauses 613.4 & 1204. |
| 17 | Construction of toe walls for protection of slopes as per Drawing and MoRD technical specifications Clause 1302.5 (including centering, shuttering staging etc. but excluding reinforcement) Cement concrete grade M 10 in case of concrete block pitching Nominal mix 1:3:6 Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 18, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 24, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysAug 24, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender