Chemicals and Fertilizers Private Organizations Closing in 5 days TDR #57068296

Tender For Annual Rate Contract For Mdpe Pipe Network Layig, Lmc Installtion And Associated Works At Ioagpl Baddi Location And Nearby Area

Issued by Private Organizations · Gautam Buddha Nagar, Uttar Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
28 Aug 2026
5 days left
EMD
Ref. Documents
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Gautam Buddha Nagar → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Annual Rate Contract For Mdpe Pipe Network Layig, Lmc Installtion And Associated Works At Ioagpl Baddi Location And Nearby Area

BOQ

Name of Work:- ANNUAL RATE CONTRACT FOR MDPE PIPE NETWORK LAYIG, LMC INSTALLTION AND ASSOCIATED WORKS AT IOAGPL BADDI LOCATION AND NEARBY AREA
Sl. No. Item Description
1MDPE SECTION
2MDPE pipeline laying
3Route survey of allotted areas and Preparation /Submission of detailed route plan for approval by EIC in AutoCAD format. Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes & fittings and other free issue items from IOAGPL designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Proper storing, stacking, identification, providing security and insurance cover for the materials. Making trial pits to determine the underground utilities/ services etc., restoration of the abandoned excavation/ trial pits (excavated to depth of 1.00 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / Site-in-charge; uncoiling / stringing of pipes, jointing of the pipe ends/ fittings / Transition fittings/ valves by qualified personnel, using approved electro fusion techniques as per specification.. Entire work shall be executed as per scope of work, specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities.
4Route survey of allotted areas and Preparation /Submission of detailed route plan for approval by EIC in AutoCAD format. Receiving, handling, loading, transportation and unloading of owner supplied MDPE pipes & fittings and other free issue items from IOAGPL designated stock yards to Contractor's own stock-yards/ work-sites. Proper storing, stacking, identification, providing security and insurance cover for the materials. Proper storing, stacking, identification, providing security and insurance cover for the materials. Making trial pits to determine the underground utilities/ services etc., restoration of the abandoned excavation/ trial pits (excavated to depth of 1.00 m or more as per satisfaction to EIC) to original condition, barricading the work area as per the procedures & drawings provided in the tender and as per the directions of EIC / Site-in-charge; uncoiling / stringing of pipes, jointing of the pipe ends/ fittings / Transition fittings/ valves by qualified personnel, using approved electro fusion techniques as per specification.. Entire work shall be executed as per scope of work, specification, PNGRB T4S and/or any other specification as per requirement of statutory authorities.
5Installation of Gl sleeves, 2.5\\" NB x 300 mm length pipe sleeve/ half round concrete sleeves for domestic connections, 3\\" NB x 300 mm length Gl sleeve for commercial and industrial installations, excavation, breaking through any obstructions, insertion of pipe, sealing the annulus, fixing of the sleeves/RCC Half Round Guard with concrete mix, preparation of pedestal & restoration of excavated pits within the size of pedestal & the same pit with the laying of 20/32 mm dia MDPE pipe as defined in scope of work, technical specification and instruction of ElC/ SIC.
6Carrying out GIS Data Collection & Entry at every 12 meters, Pipe fittings / Cut Points /Joints/Crossings/Valves/SR etc. (Latitude / Longitude) With attributes as per satisfaction of Owner and / Or as directed by Engineer I/C.Submission of Data in the GIs format of. Shp,. Kml. Accuracy of the collection of assets / Cut points/ Joints to be in accuracy to be maintained 30cm -60cm.Using Hardware Components like- GNSS Receiver’s - Arrow 100 GNSS Receiver / Spectra Precision Sp20 Receiver / Trimble R2 / Trimble R1 Receiver having Capability to get submeter accuracy 30cm -50cm or better with Indian SBAS-GAGAN Satellite or RTK in Real-time along with Field replaceable Battery in the device.Software Components - Data collection via Mobile application: To digitize the collection of data duringconstruction and provide real-time data in the field.
7Flushing, cleaning, pneumatic testing, purging with nitrogen and commissioning as per scope of work, specification and approved procedures providing all tools and tackles, nitrogen, instruments, manpower and other related accessories and as per instructions of the EIC/ SIC. Maintaining the completed pipelines/ installation for any defect, failures during defect liability period.
8Handing over the completed works to owner for their operation/ use, returning of all surplus material to owner stores, reconciliation of free issue material area wise and obtaining no objection certificate.
9On completion of gas charging of pipelines, preparation and submission of as-built drawings, crossings details, termination, utility graphs and deviation statements. Submission of all documents required for contract closure in numbers as mentioned in contract.
10In case more than 1 MDPE pipelines are laid in a common trench, SOR rate of higher dia plus 1/3rd SOR rate of lower dia will be paid.
11MDPE pipeline laying in normal soil with all type of surface by open trench methodology
12MDPE pipeline laying in normal soil with all type of surface by open trench methodology by maintaining clear top cover of minimum 1.0 m from the pipeline.
1320 mm Dia
1432 mm Dia
1563 mm Dia
1690 mm Dia
17125 mm Dia
18MDPE pipeline laying in Rocky terrain/with larger boulders exceeding 200mm in width by open trench methodology
19MDPE pipeline laying in Rocky terrain/with larger boulders exceeding 200mm in width with all type of surface by open trench methodology by maintaining clear top cover of minimum 1.0 m from the pipeline.
2032 mm Dia
2163 mm Dia
2290 mm Dia
23125 mm Dia
24MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe
25MDPE pipeline laying in normal soil with all type of surface by moling methodology without HDPE casing pipe by maintaining clear top cover of minimum 1.0 m from the pipeline.
2620 mm Dia
2732 mm Dia
2863 mm Dia
2990 mm Dia
30125 mm Dia
31MDPE pipeline laying in normal soil with all type of surface by moling methodology with HDPE casing pipe
32MDPE pipeline laying in normal soil with all type of surface by moling methodology with HDPE casing pipe by maintaining clear top cover of minimum 1.0 m from the pipeline.
3363 mm Dia (in 125 mm HDPE casing pipe)
3490 mm Dia (in 200 mm HDPE casing pipe)
35125 mm Dia (in 250 mm HDPE casing pipe)
36MDPE pipeline laying in Normal Soil by HDD method without HDPE casing pipe.
37MDPE pipeline laying by HDD method without casing pipe in Normal terrian including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.
3863 mm Dia
3990 mm Dia
40125 mm Dia
41MDPE pipeline laying in Rocky terrain by HDD method with casing pipe in Normal soil /gravel/mixed strata.
42MDPE pipeline laying by HDD method with casing pipe in Normal soil /gravel/mixed strata including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.
4363 mm Dia
4490 mm Dia
45125 mm Dia
46MDPE pipeline laying in Rocky terrain by HDD method without HDPE casing pipe.
47MDPE pipeline laying by HDD method without casing pipe in Rocky terrian including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.
4863 mm Dia
4990 mm Dia
50125 mm Dia
51MDPE pipeline laying by HDD method with casing pipe in Rocky terrian/large boulders.
52MDPE pipeline laying by HDD method with casing pipe in Rocky terrian/large boulders including survey of the underground utilities, intimation to all other utility agencies through owner, submission of HDD profile for approval, execution of the work as per the scope of work, standard procedure, specifications & PNGRB T4S, including excavation of the pits, jointing and insertion of carrier pipe, subsequent backfilling, compaction, restoration, submission of as-built drawings/ graphs as per specification and the instructions of EIC/ SIC of owner.
5363 mm Dia
5490 mm Dia
55125 mm Dia
56Restoration of trenches
57Restoration to original conditions surface like bituminous/ asphalted road, concrete pavement, RCC pavements, tiles/ slabs/ blocks/ curb stones/ Agra/ Kota stones (chequered/ interlocking etc.), brick lining/ channels pavement as per the scope of work, technical specifications after laying of pipeline in built-up surface, as per the directions of EIC/SIC. Scope includes providing of the approved quality material, testing of materials by third party agencies as per scope of work, technical specification/ CPWD/ IRC standards, submission of the restoration reports, obtaining no objection certificates from the concern local authorities/ statutory authorities/ land owners/ third party inspection agencies designated by land owing agencies and owner.
58EIC,asset to provide cross section details of the trench as per statutory agency for restoration as detailed belowRestoration for all trenches shall be carried out as per PWD (kerela) Specification irrespective of nature of road.
59BM&BC
60Interlocking Tiles
61Concrete Surface
62Fabrication & installation of pipeline markers
63Fabrication and installation of pipeline RCC route markers/ steel pole markers/ steel plate markers as per the scope of work, specification & PNGRB T4S along the route/ boundary wall, lamp posts including all associated civil works such as excavation and construction in all types of soils, construction of pedestals and grouting with concrete, cleaning, application of approved color and quality of primer and paint, stencil letter cutting of numbers, direction, chainage etc., restoration of area to original condition and performing all works as per scope of work, specification, PNGRB T4S and instructions of EIC/ SIC.
64RCC route markers
65Steel pole markers with foundation
66Steel Plate Markers
67Liasioning with Land Agencies for permission (Optional) bidder will not have any right to claim this amount unless it has been approved in advance by the HO.This line item is optional and IOAGPL’s right. This line item is entirely up to IOAGPL's discretion.
68Submission of applications as per approved drawings provided by owner (Initial route survey, preperation of drawings, measuring and providing details of surface type shall be in scope of contractor with approval from owner), obtaining & submission of demand note, coordination, liaisoning, obtaining written permissions from land owing agencies like municipal corporation, PWD, development authority, NHAI, railways and any other government agencies who maintains the public lands. These rates are not applicable for private lands i.e. apartments/ institutions etc.
69MDPE pipeline of all sizes
70GI SECTION
71Installation of GI service pipe & fittings
72Survey of designated area and survey drawings of societies / colonies/ localities shall be provided by the contractor. installation of GI fittings like elbows, tees, unions, sockets, reducers, GI plugs,any other GI fittings, adopter for appliance valves & Anaconda, Domestic Adoptor, GI Sleeves, RCC Crimping Guard, Meter clamp & Pipe clamps etc. as required to complete the job including supply of all consumables like Teflon tape, soldering consumables, flux application and all other required material to complete the job. Excluding only Supply of GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, & GI fittings which shall be issued by Owner as FIM.
73Receiving and taking-over as defined in the scope of work & specifications, handling, loading, transportation and unloading of owner supplied GI pipes of all dia.,GI fittings, Isolation valve, appliance valve,brass adopter Anaconda, Meters,Regulators,Suraksha hose pipe with clamps,GI sleeves, GI fittings and other free issue items from owner's designated place(s) of issue to contractor's own stock-yard(s)/ Work Shop(s)/ work-site(s) including proper storing, stacking, identification, providing security & insurance cover, including installation of GI line (alongwith installation of required accessories as mentioned above) of following sizes, including fabrication, consumables, labour and other incidental works and handing over the same after return of the surplus pipes, fittings, valves & other accessories to the owner's designated store; carrying out all temporary, ancillary, auxiliary works required to make the GI line ready for commissioning as per drawings, specifications, scope of work and other provisions of contract document and instructions of EIC/ SIC, including but not limited to carrying out the following:
74Preparation and approval of schedules, execution procedures, sketches
75Finalization of optimum route with consent of customer, from transition fitting to cooking oven/ appliance. A tentative sketch shall be prepared and shall be signed by customer, contractor & SIC/ TPIA
76Making temporary but stable platforms/ scaffolding / rope ladders and all other safety devices
77Installation of Powder Coated GI Pipes & Fittings, Isolation & Appliance Valves including NPT/BSPT threading, Anaconda, Suraksha Hose etc.. painting as specified including installation of regulators and meters.
78Supply & Fixing of approved clamps, Dowell Plugs with screws, grout material, suitable thread sealant i.e. Teflon Tape/ lock tight, drilling of holes through wall /tiles / wood/ marble/ Granite etc jointing of PE to aboveground service GI pipes, testing, purging and commissioning of the complete installation.
79Touchup/ Painting of entire length of pipe along with fittings after proper surface finish by one coat of approved primer paint and two coats of approved synthetic enamel paint complete as per specification & direction of EIC. Restoring the wall surface to original by cleaning/ touching of corresponding paint to original as per instructions & to satisfaction of the owner. Preparation of laying records, meter reading etc. Reconciliation of free issue material.
80Drilling of holes through walls with proper heavy duty hammer drill Machine, tools & tackles, using proper sealant/ grout material & colours to match original, replacement of damages during drilling, restoring the area to original condition to the satisfaction of Owner/ EIC & as per specification for 1/2\\" & 1\\" NB in brick wall and RCC wall. PVC sleeve with proper sealant to be provided in the drilled section to protect GI pipe.
81All above activities to be carried out as per scope of work, specifications and to the complete satisfaction of consumer & EIC/ SIC.
82Handing over the completed works to owner for their operation/ use, returning of all free issue surplus material to owner stores, reconciliation of free issue material area wise and obtaining \\"no objection certificate\\" from owner/ EIC/ SIC/ TPIA
83Any other activity not mentioned/ covered, explicitly above, but otherwise required for satisfactory completion/ safety/ statutory/ maintenance of works shall also be covered under scope of work and has to be completed by contractor within specified schedule at no extra cost to owner
84Arrangement of all tools, tackles and consumables required to execute the work in an efficient manner.
85In case of independent house with single connection, Riser isolation valve can be considered as lateral isolation valve.
86NON LMC
87Installation, testing & commissioning of powder coated GI riser of 1” & ½” from TF to Riser Isolation Valve, from Riser Isolation Valve upto lateral Isolation Valve by providing plug at all levels upto all floors including supply and fixing of all type of pipe supports/ clamps/ brackets.
88Installation of Welded powder coated GI/ MS riser at all length in buidlings above 8 floors and confined spaces like basements by using forged fittings confirming to IS 1239 - Part 2, duly polyester powder coated with 70 micron thickness. GI pipe & required fittings shall be first coupled with threaded joint. Teflon/PTFE tape should not be used in threaded joint for welded riser. Alternatively, plain ended pipes and fittings can also be used for welding in welded riser.The entire riser shall be constructed with SOCKET weld only, threaded joints are permitted only on the laterals on account of workability & for future maintenance only. The electrodes (Welding Rods) used for welding on risers shall be of E 6013 grade & 2.5mm thickness of reputed make used for industrial application. The Vendor is required to provide the Batch Test Certificate (TC) for the electrodes. The Weld joint shall be thoroughly cleaned with wire brush and examined visually for its quality. Welding shall be free from defects like porosity, crack, undercut, incomplete fusion etc. Spatter, slag must be removed from pipe.
89Installation of Common Ring/ Header of Powder coated GI Pipe/MS Pipe in Basement/ Terrace of the High Rise Building.
90Installation of powder coated GI pipe/MS Pipe (Horizontal/ Vertical) in Flats & Bulidings.
91Installation of 1/2\\" powder coated GI pipe(Threaded)
92Installation of 1\\" powder coated Gl pipe (Threaded)
93Installation of 1\\" powder coated Gl pipe (Welded)
94Installation of 1.5\\" powder coated Gl pipe (Welded)
95Installation of 2\\" powder coated Gl pipe (Welded)
96Installation/Fixing of Commercial/Non-Commercial meter and regulator with associated inlet & outlet connections fittings,anaconda,valves. Using approved meters & regulator brackets and other supports by proper scaffolding/grouting. Restoring the area/walls to original condition as per specification and to complete satisfaction of consumer and EIC.
97Installation, testing & commissioning of 1/2\\" Powder Coated GI pipe & Fittings with Installation of lateral isolation valve (included) at all length after lateral isolation valve along with installation of regulator, meter with associated inlet & outlet connections/ fittings/ anaconda, supply and fixing of approved meter brackets and other supports upto Appliance Valve (excluded). Installation of Appliance Valve is covered in Conversion of Domestic Appliances.
98Installation of 1/2\\" Powder Coated GI pipe & Fittings up to 5 meters from lateral isolation valve up to appliance valve/gas tap along with meter & regulator installation at domestic household for connecting PNG connection with GI Riser network with end Blind/cap/plug/ (included). After 5 meters,Installation of 1/2\\" powder coated GI pipe(Threaded) rates will be applicable over and above this rate.Note:- SOR can only be claimed if the complete work is done from LIV(RIV incase of single connection) to appliance valve including installation of meter and regulator)
99Installation of 1/2\\" powder coated GI pipe(Threaded)
100Conversion of Domestic Appliance
101Conversion of all types of LPG kitchen appliances to NG based appliances by installing appliance valve, suraksha hose of 1 meter, changing/ converting nozzles, jets and associated controls for domestic & imported appliances with proper tools & tackles.
102Cleaning and performing minor maintenance, greasing etc of appliance, testing/ showing performance to the customer, signing of joint meter records (JMR) and instructing customer on use & safety norms, complete as per scope of work, specifications & to the satisfaction of owner/ EIC/ SIC.
1032 Burner Stove
1043/4 Burner Stove
105Other Applicances
106INSTALLATION WORKS
107Construction of Foundation & Installation of DRS/ MRS/ Metering Skid/ Service Regulator
108Receiving and taking over, handling, loading, transportation and unloading of DRS/ Service Regulator/MRS/ Metering Skid from owner's designated stockyards to site, installation and hooking up with Steel & MDPE pipe.
109Installation of DRS with RCC pedestal, foundation and Structural Works. Providing and laying reinforced cement concrete of grade M-20 with 20 mm and down grade crushed stone aggregate in all types of structures like foundations, pedestals, pedestal bases, pipe supports, sleepers, columns, equipment, foundation, etc. including providing fencing with gate wherever required.
110Hook up from the existing steel tapping to DRS inlet and installation of all the items like pipe, fittings, valves, etc. supplied as FIM by owner as per the directions of the EIC/ SIC.
111Supply of all materials, fabrication and erection of chain link fencing 2.5 m high with mesh upto 2 m height providing proper bracing & supprots at safe intervals and barbed wire fencing complete in all respect including painting as per technical specification on all steel items, all works as per specification including foundations and RCC beams. The fence shall be suitably earthed as per the IS 3043.The Earthing pit also to be constructed as per the required specification.
112Supply fabrication and erection of all types of pipe supports like clamps, saddle, guide, stops, cradles, neoprene sheet, turn buckles, anchors, T-posts, stockade/ trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc, including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawing, specifications and instructions of EIC/ SIC. Please Enable Macros to View BoQ information
113Supply fabrication and erection of all types of pipe supports like clamps, saddle, guide, stops, cradles, neoprene sheet, turn buckles, anchors, T-posts, stockade/ trestle and pipe bridge for overhead piping, frames for canopy, approach ladders and platforms, crossover, cable tray supports etc, including painting suitable for highly corrosive area as per specification, labour and supervision & complete work as per drawing, specifications and instructions of EIC/ SIC. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57068296
AUTHORITY Private Organizations
TENDER VALUE Ref. Documents
LAST DATE 28-08-2026
Authority
Authority Name Indianoil Adani Gas Private Limited
Work Description Tender for Annual Rate Contract For Mdpe Pipe Network Layig, Lmc Installtion And Associated Works At Ioagpl Baddi Location And Nearby Area
Basic Detail
Tender No IOAGPL/PE/OPEN/2026-27/46
Bidding Type Tender
Location
City Gautam Buddha Nagar
State Uttar Pradesh
Key Dates
Publish Date 18 Aug 2026
Submission Date 28 Aug 2026
Open Date 29 Aug 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD Ref. Documents
Exemption Not Available
Document List
9bedf1b5-cb8d-4df5-949c-e3dd700d3b62.html
BOQ_335944.xls
Tendernotice_1.pdf
Vol1.pdf
Vol2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 18, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 28, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 5 days
Aug 29, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 6 days

Tender Documents

Download All (ZIP) ↓
html

9bedf1b5-cb8d-4df5-949c-e3dd700d3b62.html

xls

BOQ_335944.xls

pdf

Tendernotice_1.pdf

pdf

Vol1.pdf

pdf

Vol2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders