Tender For G-Schedule For Construction Work For New Proposed 33/11 Kv Nangli Medha S/S & Erection Of 33Kv Line & Cable With 11 Kv I/C Under Assistant Engineer(Htm),Jpd,Ramgarh.
Tender Overview
Project Description
Tender for G-Schedule For Construction Work For New Proposed 33/11 Kv Nangli Medha S/S & Erection Of 33Kv Line & Cable With 11 Kv I/C Under Assistant Engineer(Htm),Jpd,Ramgarh.
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 02-Sep-2026 | Date Extension | Date | 10-Sep-2026 |
| 2 | 10-Sep-2026 | Date Extension- II | Date | 22-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Levelling of ground |
| 2 | Levelling of ground above 30 cm.to 90 CM.depth. with tractor and T&P required as per condition of ground including removal of rubbish plants from ground & marking of boundary with lime powder.(Including all lead & lifting) |
| 3 | Excavation of pit in Hard soil (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13). |
| 4 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 5 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 6 | Earth work excavation and foundation of platfrom of transformers and brakers including dressing of sides and ramming of bottoms .Liftup to 1.5 Meter including taking out the excavated soil and depositing and refilling of jhiri, watering and ramming and disposal of surplus excavated soil as directed with in a lead of 50 Meter. |
| 7 | Hard /dense soil |
| 8 | Plaster on new surface on walls in cement ,sand mortar 1:6 including racking of joint etc. complete fine finsh 25 mm thick. |
| 9 | The rates for complete work including racking of joints,curing,grinding,mixing and finishing T&P and scaffolding material and cost of material with all lead and lift. |
| 10 | The rates cover protection of all place and things,requiring protection and cleaing such places and thing of all droppings and splashes of mortar etc. |
| 11 | Masonry for foundation and plinth |
| 12 | Randon Rubble stone masonry for foundation and plinth in cement sand mortar 1:6(1 Cement : 6 Sand) including labour charges. |
| 13 | Safe carriage of PCC poles including loading / un-loading |
| 14 | a) 9 Mtr. Long-400 Kg /11 Mtr. PCC pole |
| 15 | Within 10 Kms. |
| 16 | c) 9 Mtr.long 200 Kg. PCC pole |
| 17 | within 10 Kms.- |
| 18 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site |
| 19 | Within 10 Kms. |
| 20 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 21 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. |
| 22 | Within 10 Kms. |
| 23 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 24 | Safe carriage of 11/.4 KV 3 Phase distribution transformer including loading/unloading from store to site (these Charges will be 1.5 times for both sides) |
| 25 | b) 25 & 40 KVA |
| 26 | Within 10 Kms. |
| 27 | Safe Carriage of 33/11 KV Power Transformer |
| 28 | c) 5.0 MVA |
| 29 | Within 10 Kms |
| 30 | Above 10 Kms & upto 30 Kms . Add for each Km or part [email protected]/km |
| 31 | Safe carriage of breakers/kiosks etc. including loading/ unloading and stacking in Nigam stores |
| 32 | Within 10 KMs. |
| 33 | Above 10 Kms. and upto 30 Kms.Add per each km,or part [email protected]/km |
| 34 | Safe loading of power/ distribution transformer. |
| 35 | (A) 33/11 KV power transformer. |
| 36 | 5 MVA |
| 37 | Safe unloading of power/distribution transformers |
| 38 | a) 33/11 KV power transformer. |
| 39 | Above 3.15 MVA |
| 40 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. |
| 41 | (B) IN RURAL AREA |
| 42 | PCC Poles 9 Mtr. Long (400 Kg) |
| 43 | PCC Poles 9 Mtr. Long(200Kg.) |
| 44 | Erection &assembly of 2 Pole structures of steel supports or PCC poles in excavated pit in alignment after checking the same with plumb line.Including fixing of top bracing of M.S.Channels with pilot plates and clamps.The support is to be back filled with soil with proper ramming.The nuts &bolts are to be provided by the contractor as per Nigams specfication for which the payment will be made at the prevailing Discom store issue rates. |
| 45 | PCC Poles 9 Mtr. Long(200 Kg.) |
| 46 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. |
| 47 | Fixing of all type of fabricated material on erected supports with nut & bolts as per approved design & drawing of sub-station. |
| 48 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 Nos. disc.& 1set of H/W) on terminal point including fixing of hardware and strips. |
| 49 | Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 2 nos.disc.& 1set of H/ W ) on terminal point including fixing of hardware and strips. |
| 50 | Fixing of 33kv pin insulator with pins. |
| 51 | Fixing of 11 KV pin insulator with pins. |
| 52 | Assembly. Installation & commissioning of gang operated isolating switch on erected structure with setting for accurate operation including fixing of allied accessories completein all respect with post insulator and jumpering on both ends for connection with the system. The nuts and bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. |
| 53 | (B)G.O. switch . without earthing blade. |
| 54 | 33kv G.O.switch |
| 55 | 11kv G.O.switch |
| 56 | Assembly and installation of Horn Gap fuse set (set of 3nos)on erected structure as per design, complete in all respectwith post insulator including jumpering on both ends for connection with the system. The nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates. |
| 57 | 33kv Horn Gap fuse set. |
| 58 | 11kv Horn Gap fuse set. |
| 59 | Installation of lightening arrestors on erected structure /support (1 nos) including connection with earth by wire /strip as required and jumpering etc. The nuts & boltswill be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates, |
| 60 | (A)sub-station type |
| 61 | 33 KV L.A. each |
| 62 | 11 KV L.A. each |
| 63 | Installation testing as per Nigams norm & commissioning of 11/0.4KV distribution transformer on erected supports including fixing of base channels as per requirment jumpering on HV&LV side, crimping of lugs/ clamping earth connections of body and neutral of transformer with wire /strip (as already provided with earthing ) complete in all respect. The PG clamps nuts & bolts will be supplied by the contractor for which payment will be made as per prevailing Discom store issue rates, |
| 64 | 25 and 40 KVA |
| 65 | Fixing of PG clamp of Dog /Racoon Conductor |
| 66 | Assembly,installation & commisioning of 11 KV Roaster switchs on erected structures with stting for accurate operation including fixing of allied accessories completed in all respect with post insulators and jumpering on both ends for connection with systm.The nuts & bolts will be supplied by contractor for which payment will be made as per prevailing Dicom store issue rates. |
| 67 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) |
| 68 | 3 Nos. of earthing of 11/0.4 KV distribution transformer /sub-station with 3 pieces of M.S.Rod 20mm dia each 3 meter long and driving them into earth by mechanical means at a distance as per approved design & drawing & specification.The work includes flattening of top ends of M.S.rod drilling a hole of 9/16\\" dia.at flattened top and tightening of M.S.flat 50x6mm/25x3mm (having 3 hole 2ends and 1mm middle) with nuts and bolts with M.S.rods top end hole.The flat will also be welded with M.S.rod.The end will be connected to equipments as under in sequence. |
| 69 | Mesh earthing for 33/11 kv sub-station as per approved map &design usingMS flat 50X6mm/MS road 20mm dia includinglaying of flat/rod at the depth of 0.65 Mtrs.,welding & jointing at joints , structures & equipments etc.asunder: |
| 70 | Excavation of trench of 0.65 Mtrs.depth and 0.5 Mtr.width |
| 71 | Hard Soil |
| 72 | Laying of MS flat /MS rod in 0.65Mtr.deep excavated trench and welding of MS flat/rod continuosly with 100 mm overlaping for straight joint including coating of MS flat joints with molten bitumen and covering joint with bitumen impregnated tape to protect from rust. |
| 73 | Shaping of MS flat for connecting the equipments with earthmesh .The work includes the welding of MS flat with equipments/structure and also with earth mesh.The work also includes coating of MS flat joint with molten bitumen and covering jointwith bitumen impregnated tape to protect from rust. |
| 74 | Filling of trench with available excavated muck in layers of 20cm (Max.)consolidating each deposited layer by ramming & watering with lead up to 50 Mtr, and lift up to 1.5 Mtr. |
| 75 | Painting of exposed portion of MS flat/rod with two coats of red-oxide primer and two coats of green enamel paint.including material. |
| 76 | Pipe Earthing for Power Transformer at 33 / 11 KV S/S:- Supply & erection of earthing electrode shall consist of G.I. Pipe 100 mm,of 3 Mtr Length. The electrode shall be buried as far as practicable 3 meters below ground level. Wherever possible, earth electrodes shall be located as near the water tap, water drain or near down take pipe. Earth electrodes shall not be installed in proximity to a metal fence. It shall be kept clear of the buildings foundations and in no case it shall be nearer than 2 meters from the outer face of the wall. The electrode shall be surrounded with layer of charcoal dust and salt mixture through out the length. The 100 mm GI pipe shall be provided with holes of 12 mm dia. drilled at 75 mm interval upto 2.5 meters length from bottom. The top of the pipe shall be provided with a G.I. threaded cap for watering the earth through a pipe. A Clamp with Pati of 12\\" of M.S. Flat of size 50X6 mm shall be fixed (Bolted) on the top edge of the pipe which in turn shall be connected to Neutral / Body of the Power Transformer through M.S. Flat size 50X6 mm. The G.I. cap over the GI pipe shall be housed in a masonry chamber, approximately 300 mm x 300 mm x 300 mm deep. The masonry chamber shall be provided with a RCC inspection cover resting over a RCC frame, embedded in masonry. |
| 77 | Laying / stringing of bus bar with ACSR Dog & jumper connection using tie rod ,33KV /11KV insulator strings,required hardware,P.G.clamps/T clamps etc.as per requirement including Y-connections at bus bar jumpering point as per the direction of engineer in-charge. |
| 78 | ACSR DOG/RABBIT |
| 79 | Erection of OCB/Kiosk/VCB complete with accessories including use of special tools & conducting all pre-commissioning test before energization,filling oil etc. complete in all respect with erection & grouting of structure (excluding civil works). The relays will be tested by Discom. |
| 80 | 33 KV VCB/SF-6 Breaker |
| 81 | 11 KV VCB (Outdoor ) |
| 82 | Installation of control panel including checking of wiring and conducting all pre-commissioning tests before energization, satisfactory operation of all equipment existing thereof. ( The relay will be tested by Discom ). |
| 83 | 33 KV Control Panel |
| 84 | Erection & commissioning of battery set and battery charger including all required connection/wiring from battery set to battery charger and A.C.mains complete in all respect. |
| 85 | 110 Volts D.C. |
| 86 | Laying, testing termination of control cable 1100 volts PVC insulated including supply and installation of ferrules to designate various cores of control cables by terminal Nos. of identification including utilization of cable gland. The control cable should be clearly arranged in trenches avoiding crossings including clamping of control cable at regular interval and providing identify tags. |
| 87 | 2x2.5 Sq.mm. |
| 88 | 4x2.5 Sq.mm. |
| 89 | Installation of metering points on 11 KV Out going feeder at 33/11 KV S/S. |
| 90 | The installation work to be carried out as per drawing/design, under the supervision of concerned Assistant Engineer |
| 91 | Mounting structure |
| 92 | The requisite steel members will be supplied by contractor including the hardware. Contractor shall joint/weld the members to form the mounting structure as per drawing. Necessary tools, welding, machines, lifting devices etc. shall be arranged by contractor. |
| 93 | Painting with priming coats or ready mixed red-oxide paint 2 coats of approved make on steel works after cleaning with wire brush / sand paper.(including cost of red oxide) |
| 94 | On new surface |
| 95 | Painting with aluminium paint of approved brand and manufacturer to give an even surface.(including cost aluminium paint) |
| 96 | On new works with two coats. |
| 97 | Fabrication of steel structures of M.S angle ,M.S.channel & M.S.Flat including cutting ,drilling and continunous welding joint as per design and drawing. |
| 98 | Other steel items |
| 99 | Drilling of holes in MS Channel / Angle /Flat |
| 100 | 15/16\\" dia holes(23.81 mm dia.) |
| 101 | Installation , testing as per Nigams norms & commissioning of new 11KV CT PT set (all sizes) on erected supports including jumpering,crimping of lugs/ clamping earth connection of body &conducting pre commissioning test before energization and satisfactory operation in all respect |
| 102 | Transportation of 33 KV or 11 KV CT/PT/CTPT Set (All sizes)for replacement at 33/11 KV S/S along with their loading & unloading.. |
| 103 | 33 KV or 11 KV CT/PT/ CTPT set |
| 104 | Within 10 Kms |
| 105 | Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line. |
| 106 | Excavation of pit in Hard soil (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13). |
| 107 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 108 | 12.8/12.6 Mtr/ 1.5mx1.5m x2.10 m deep |
| 109 | (C)Stay set/Depth of pit |
| 110 | 8'x 3/4\\" -0.75x0.5x1.6 m |
| 111 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site |
| 112 | Within 10 Kms. |
| 113 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 114 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. |
| 115 | Within 10 Kms. |
| 116 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 117 | Safe carriage of fabricated lattice towers structures and sub-station structures type AB, AB beams, isolators structures etc. including loading/unloading and stacking in the Nigam. Stores / at work site. |
| 118 | Within 10 Kms. |
| 119 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 120 | Erection of all type of steel supports in the excavated pit in alignment after checking the same with plumb line including fixing of cross arms and top hamper before erecting the supports. The support should be grouted and muffed in cement concrete of ratio 1:3:6 as per item No. 5.7 the remaining portion of the pit will be back filled with soil. The nuts & bolts will be provided by the contractor as per Nigam's specification for which payment will be made at the prevailing store issue rates. The cost muffing and grouting will be paid extra. |
| 121 | Lattice Structure |
| 122 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire |
| 123 | 8\\"x3/4\\" with 7/8 SWG stay wire |
| 124 | Providing and laying of cement concrete in ratio 1:3:6 using 43 grade cement,river sand and 12 mm to 20 mm graded blast crusher broken in pit/foundation according to the size/type of supports/stay set including compaction/curing for 21days in steel plates shuttering /farmer base. |
| 125 | Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates. |
| 126 | 33 KV line |
| 127 | Fixing of 11kv B&S/T&C type disc insulator for 33kv lines (each unit consiting of 3 Nos. disc.& 1set of H/W) on terminal point including fixing of hardware and strips. |
| 128 | Fixing of 33kv pin insulator with pins. |
| 129 | Fixing of PG clamp of Dog /Racoon Conductor |
| 130 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. |
| 131 | (B) IN RURAL AREA |
| 132 | ACSR DOG |
| 133 | Earthing of line for all type of supports as per REC construction standards using Stay wire/GI wire with one pcs.of M.S.rod 20mm dia each 3 meter long and driving into earth by mechanical means as per approved design.Drawing &specification.All material except MS rod,MS flat & stay wirewill be supplied by the contractor.If material is supplied by the contractor ,the payment will be made as per prevailing Discomstore issue rates.(In case of PCC poles earthing must be connected with earthwire already available on PCC pole at bottom) |
| 134 | Drilling of holes in MS Channel / Angle /Flat |
| 135 | 15/16\\" dia holes(23.81 mm dia.) |
| 136 | Laying of 33 KV XLPE Cable ( Aluminium Conductor ) underground as per relevant ISS / JVVNL standard including excavation of 30 cm width x120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class bricks or concrete block covering refilling soil in the remaining portion and providing/fixing cable route indicators at every 30Mtr.of cable and at every turn. |
| 137 | B) 3x240 Sq mm to 3x400 Sq mm |
| 138 | Note:- Per mtr. Rate shall be paid extra for excavation of puccka road |
| 139 | For Extra Loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit. |
| 140 | 33 KV Cable:- |
| 141 | 3X240 Sq.mm to 3X400 Sq.mm |
| 142 | Intallation of 33 KV Cable (XLPE) termination / straight through joints ( Heat shrinkable type) as per manufacturer's kit guidance and direction including preparation of cable and testing refilling etc as required.(Including crimping of lugs) |
| 143 | (ii) Outdoor end terminal 3x240 Sq mm to 3x400 Sq mm |
| 144 | Trimming of tree branches/plants manually/ by machine and preparing route approchases for proposed line. |
| 145 | Excavation of pit in Hard soil (15% extra shall be payable for the designated desert area panchayat samities of Jodhpur Discom in pursuance to JdVVNL order No. 1240 dt. 18.07.13). |
| 146 | (A) Height of poles/R.S.Joist/M.S. Rail Size of pit |
| 147 | 9 Mtr/ 1.2mx0.6mx1.50 m deep |
| 148 | (C)Stay set/Depth of pit |
| 149 | 6'x 5/8\\" -0.75x0.5x1.35 m |
| 150 | Safe carriage of PCC poles including loading / un-loading |
| 151 | c) 9 Mtr.long 200 Kg. PCC pole |
| 152 | within 10 Kms.- |
| 153 | Safe carriage of steel( fabricated and unfabricated) I.e.M.S. Rails, R.S.Joists, M.S.Channels, M.S.Angles, M.S.Flat, G.I.Stay Sets, G.I. Stay Wire, G.I.Wire Nut & Bolts etc. and ACSR Conductor including loading and unloading and stacking in Nigam store /at work site |
| 154 | Within 10 Kms. |
| 155 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 156 | Safe Carriage of insulator, hardware, cable etc.including loading/unloading and stacking in Nigam.stores etc. |
| 157 | Within 10 Kms. |
| 158 | Above 10 Kms. & upto 30 Kms. Add for each Km.or part [email protected]/km |
| 159 | Erection of PCC poles in excavated pit with fixing of brackets,cross arms & top hampers as required in alignment after checking the same with plumb line. The support is to be back filled with soil with proper ramming. The nuts & bolts are to be provided by the contractor as per Nigam's specification for which the payment will be made at the prevailing Discom store issue rates. |
| 160 | (B) IN RURAL AREA |
| 161 | PCC Poles 9 Mtr. Long(200Kg.) |
| 162 | Erection & fixing of G.I.Stay sets with anchor plates in excavated pit in required position and back filling with soil with proper ramming.The work includes fixing of stay clamps.Stay insulator with stay wire at both ends with proper tension.Size of stay set/stay wire |
| 163 | 6\\"x5/8\\" with 7/10 SWG stay wire |
| 164 | Fixing of cross arms with clamp on erected support as per design. The nuts &bolts will be supplied by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates. |
| 165 | 11 KV cross arms (Dismantle@60%) |
| 166 | Fixing and assembly of disc.point channel pair with pilot plates&clamps on erected double pole structure as per design. The nuts &bolts are to be provided by the contractor as per Nigams specification for which payment will be made as per prevailing Discom store issue rates. |
| 167 | 11 KV line |
| 168 | Fixing of 11kv B&S/T&C type disc insulator of 11kv lines (each unit consiting of 1 Nos. disc & 1 set of H/W ) on terminal point including fixing of hardware and strips. |
| 169 | Fixing of 11 KV pin insulator with pins. |
| 170 | Fixing of 11 KV pin insulator with pins. (Dismantle@60%) |
| 171 | Laying ,jointing , stringing, tensioning and clamping of conductor with proper sag as directed , using bolted type hardware including binding on pin insulators,jumpering on section points with binding wire / P.G.clamps.Aluminium jointing sleeves will be used for jointing the conductor.The line must stand at proper voltage on charging.The contractor will be provide P.G.clamps for which payment will be made as per prevailing Discom issue rate. |
| 172 | (B) IN RURAL AREA |
| 173 | ACSR RABBIT |
| 174 | ACSR WEASEL(Dismantle@50%) |
| 175 | Drilling of holes in MS Channel / Angle /Flat |
| 176 | 15/16\\" dia holes(23.81 mm dia.) |
| 177 | Laying of 11 KV, XLPE, Cable (Aluminium conductor) underground as per relevant IS/JVVNL standards including excavation of 30 cm x 120 cm deep trench in Kaccha land 25 cm thick under layer of sand. 'A' class beicks covering refilling soil in the remaining(Including fixing of G.I.Pipe of required size at both end with 3 Mtr projected above the ground surface & 0.3 Mtr. below ground level) |
| 178 | a) 3x35 Sq mm to 3x185 Sq mm |
| 179 | Note: per meter shall be paid extra for excavation in Pakka Road. |
| 180 | Installation of cable termination / straight through joints on 11KV Aluminium conductor XLPE /PILCA Cable with outdoor/ indoor termination end and /or straight through joint including required excavation / remoral/ fixing / refixing/ testing etc. as required |
| 181 | A) (I) Outdoor end terminal 3x35 Sq mm to 3x185 Sq mm |
| 182 | C) (I) Straight through joint 3x35 to 3x185 Sq mm |
| 183 | For Extra Loop (Ghera) to be provided near the pole on termination point and the length of cable along the pole for mounting of cable jointing kit. |
| 184 | 11 KV Cable:- |
| 185 | 3X35 Sq.mm to 3X185 Sq.mm Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 2 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 3 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender