Short Dated Tender - E-Tender For Engineering/ Manufacturing /Eletrical /Installation Annual Maintenance Contract And Servicing Works - (2026-27)
Tender Overview
Project Description
Short Dated Tender - E-Tender For Engineering/ Manufacturing /Eletrical /Installation Annual Maintenance Contract And Servicing Works - (2026-27)-1 Amc For Electrical Repairing & Servicing Vfd Pm330 Siemens 415Volt, 376Amp. (Siemens Only Manufacturer/Authorized Dealer) 2 Weigh Bridge- 80Mt (01) & 40 Mt (02) Of Amc Work 1. Technical Qualification. 2. Nap Tol Dept. Licence. 3. Weigh-Bridge Repairing/Maintanance 3 Years Experience. 3 Spot Balancing (Site) I.D Fan 02 Nos. Make - Batliboi Speed-740Rpm, Capacity- 144000M³/Hr, Static Pressure- 3510Mm Wg, Temp. -180ºc Power- 165.308Kw (Iso Certified Service Provider ) 4 Spot Balancing (Site) F.D Fan 02 Nos.Make - Batliboi Speed-1440Rpm, Capacity- 64800M³/Hr, Static Pressure-285Mm Wg, Temp. -45ºc Power- 63Kw (Iso Certified Service Provider ) 5 Spot Balancing (Site) Sa Fan 02 Nos. Make - Batliboi Speed-1440Rpm, Capacity- 28800M³/Hr, Static Pressure- 695Mm Wg, Temp. -45ºc Power- 66Kw (Iso Certified Service Provider ) 6 Spot Balancing (Site) P.S. Fan 01 No. Make - Batliboi Speed-1440Rpm, Capacity- 12600M³/Hr, Static Pressure- 695Mm Wg, Temp. -450ºc Power- 30Kw (Iso Certified Service Provider ) 7 Spot Balancing (Site) Can Chopper 01 No. Make - Uttam Speed-600Rpm, 1600Mm Swing Diameter No Of Knives-36 Power- 134Kw (Iso Certified Service Provider ) 8 Spot Balancing (Site) Fibrizer 01No. Make - Uttam Speed-750Rpm, 2200Mm Swing Diameter No Of Hammer-124, Wight -20Kg. Each Hammer, Power- 750Kw (Iso Certified Service Provider ) 9 Spot Balancing (Site) Continouns Machine 06 Nos. Make - Uttam Uc- 1500 Speed-1440Rpm, Power - 90Kw (Iso Certified Service Provider ) 10 Spot Balancing (Site) Batch Type Centrifugal Machine 02 Nos. Make - Uttam Uc- 1750 Speed-1200Rpm, Power - 280Kw (Iso Certified Service Provider ) 11 Spot Balancing (Site) Bagacillo Blower 01 Make - Uttam (Iso Certified Service Provider ) 12 Spot Balancing (Site)Sugar Hopper Hot & Cold Blower Each 01 No. (Iso Certified Service Provider ) 13 Spot Balancing (Site) Sugar Dust Catcher 01 No. Make - Uttam (Iso Certified Service Provider ) 14 75 Tph High Pressure Boiler 87 Kg/Cm² Pressure And 515° C Temperature Water Panel, Bank Tube , Primary & Secoundry Superheater, Economiser Coil And Air Heater Ultrasonic Thickness Testing Job Work (Asnt Certification) 15 Dust Collector Air Blower Balacing Work Iso Certified. 16 Bagasse Blower Balancing Work Iso Certified. 17 Dg Set 750 Kva Make- Sterling Servicing 18 Heating Vantilation And Air Conditioning (Hvac) Maintenance And Servicing Work Make - Dynaflow 19 Ac Maintenance Work 2 Ton 20 Ac Maintenance Work 4 Ton 21 Ac Maintenance Work 9 Ton 22 Job Work For Mill Bearing Lubrication Conection Each Mill 10 Conection Number Of Mill 4 Nos Total No Conection Mat Copper Pipe 8Mm Or Od With Spare Format. Nut With Socket Location Main Pipe Distubetor To Mill Bearing (40 Conection) 23 Mill Setting Hydrolic Pump (Hand Pump) Repair Job 24 100Kg. Weigh Calibration Work 1. Technical Qualification 2. Nap Tol Dept. Licence 25 Sugarcane Supply Slip Size- 1/8 (As Per Sample) For Printing Work 26 Sugarcane Weight Slip Size- 1/8 (As Per Sample) For Printing Work 27 Sugarcane Survey Book (As Per Sample) For Printing Work 28 Gas Refilling Work Of 10 Ltr. Cylinder (Pure Nitrogen Gas) (Authorised And 3 Years Similer Work Experience) For Hitech Esp Sox Pollution Panel 29 Gas Refilling Work Of 10 Ltr. Calibration Gas Mixture Cylinde (Carbon Monoxide N2.5, Nitrogen N 5.0 & Carbon Dioxide N5.0) (Authorised And 3 Years Similer Work Experience) For Hitech Esp Sox Pollution Panel 30 Gas Refilling Work Of 10 Ltr. Calibration Gas Mixture Cylinder (Oxygen- N4.0, Nitrogen N5.0) (Authorised And 3 Years Similer Work Experience) For Hitech Esp Sox Pollution Panel 31 Gas Refilling Work Of 10 Ltr. Gas Mixture Cylinder (Nitrogen & Sulphur) (Authorised And 3 Years Similer Work Experience) For Hitech Esp Sox Pollution Panel 32 Servicing, Repairing & Maintainace Work Of 04 Nos. Atlas Copco Air Compressors & 02 Nos. Atlas Air Dryers (Atlas Copco Autorised) Per Man Days 33 Complete Automation Work And Electronic Circuit, Programmed Work Modification Work Of Existing Lubrication System (Mill House) With Proper Data And Controling Unit Job Work ( With 01 Year Servive Warranty) Make - Elccon Peripherals Limited ,Type- Lcpforz Pump Fl-5 W.C No. 2158 , Suply - 415V Load - 1.1Kw.Control-22Dv, Sr. 2158/Drg No.- Df-2Bb-2001 -Ro , Plc Siemens , Model No.-Dm8-230R , Terms Conditions , (A) Service Provider Should Have Experiance In Similar Of Work & Service Provider Must Performence Certificate Of Semilar Work , (B) Electronic Equipment Program Controler & Part Will Be Arrange By The Service Provider , (C) They Will Be Fully Rensposible For Safety Of Their Support Staff , (D) They Will Be Registered Under Gst , (E) They Will Be Submit Detaiols Of Technicals Team Related To Job , (F) They Should Provided Fully Service Support For Two Year. (G) They Should Complete The Job Before Crushing Season Start Warranty - 02 Year 34 (A) Calibration Work Of Mass Flow Meter With Calibration Certificate Validity - 01 Year, Model - Rccs39/Ir-A10 A1Sl /Bg/V2 Serial No. D15900959 Meter Factors. Sk20 1956 . 29 Kd 18904 , F120 , 180. 091 And Withits Rotamass Flow Converter Model - Rccf31 - Ah2A /Bg Mb3/4P/Iei , Serial No. - D15900961 , Supply - 90.264Vac , 47.63Hz , Make-Yokogawa (Note Its Auxiliary Display Not Show Any Data, Data Showing On Dcs) (B) Required New Programmed Display Module- 01 Nos, Make-Yokogawa Data Connected With Dcs, Complete Installation & Trail Work, Warranty - 02 Year 35 Calibration Work Of Flow Transmitter With Calibration Certificate Validity - 01 Year , Make- Yokogawa , Digital Yew Flo Vortex Flow Meter , Model - Dyo 80 , Style -52 Suffix - Nblba1 -N , Mwp - 1.89 , Mpa At 38 °C Process Tem - (-29 To 250°C) K- Factor - Km 3.298 P/1 , No. S5Xao 9152 14-2 2021 . 10 (For - Cigar To Dereator Tank Link Flow Measarment) 36 Overhauling . Servicing Checking And Calibration Of Sugar Silo Newlong Make Automatic Weighing And Bagging Machine Indudects Overhauling Servicing Of All Pneumatic Air Cylinders . Solenoid Valves , Calibration , Testing And Recommissioning Work With Load Trails . No. Of Cotroller -02 , Make - Uni Pluse , Plc-Mitsubishi , Fx3G.5Dm, Load Cell Minibey Service Warranty - 01 Season 37 Overhauling. Servicing Cheking And Trail Work Of Conductivity Control Valve (With Solenoid On/Off) With Its Ph And Conductivity Sensor. Mounted On (Cigar To Boiler Line) For Safety Purpose 1. Thay Will Be Fully Responsible For Safety Of Their Own & Their Support Staff. 2. Thay Will Be Submitt Detail Of Technical Team Related To Job. 3. Lodging And Boarding Will Be Arranged By The Service Provider. 4. They Will Be Taken Max 15 Days. 5. Service Warranty For 0Ne Year 38 Amc For Dcs Automation Software Make- Abb, Version- Abb Workplace Industrial It800Xa Abb800Xa 6.1.1.1 & Wondows 10 Dcs Panels- 2Pairs Cpu Model Abb800Xa 6.1.1.1 Abb Ac A With A1810 (2W & 4W), A0810, D1818, D0818, Rto Aa1830 & Th_A1835A Modules. (Manufacturer/Authorized Dealer/Sub Dealer Having 1 Year Similar Work Experience) Server 02 Nos, Oprating Stations 04 Nos, Moniter 06 Nos 39 Calibration Work Of Magnetic Water Flow Meter Make - Yokogawa, Model Axf100G & Its Transmitter Model - Axfa14G At Standard Calibration Laboratory (Calibration Certificate For One Year Validity To Be Provide After Calibration) Nabl/Yokogawa Approved. 40 Compelete Automation Work & Electronic Circuit Modification Work Of Existing Molasis Weighing System With Proper Data Storage & Controlling Unit (With 01 Year Service Warrenty) Terms & Conditions 1. Service Provider Should Have Minimum 3 Years Experienc In Similar Nature Of Work. 2. Lodging And Boarding Will Be Arranged By The Service Provider. 3. They Will Be Fully Responsible For Sefety Labour And Tools, Tackle Required Related To Job. 4. They Will Be Registered Under Gst. 5. They Will Be Submit Deails Of Technical Team Related To Job. 6. They Will Be Taken Maximum One Month Period To Do The Job. 41 Calibration Work Of 10 Nos. Siemens/Yokogawa Flow Transmitter, 05 Nos. Draft Transmitter, 03 Nos. Drum Level Transmitter At Factory Site ( Calibration Certificate Valid For 01 Year To Be Provided After Calibration By Standard Calibration Laboratorty Nabl Authorized 42 Dcs Upgredation Work From Existing Window 7 Abb800Xa5.1 To Window 10 Abb800Xa 6.1.1.1 Present System 1. Version- Abb800Xa5.1, Upgrade System - Abb800Xa 6.1.1.1 Present System 2. Work Stations Windows Os- Windows 7, Upgrade System - Windows 10 Present System 3. Servers - 02 Nos, Upgrade System - 02 Nos Present System 4. Operating Stations - 04 Nos, Upgrade System - 04 Nos Present System 5. Monitors - 06 Nos, Upgrade System - 06 Nos Thay Should Provided Full Services Support For Two Year Or 2 Crushing Season. 43 Compelete Automation Work & Electronic Circuit Modification Work Of Contineu Emmission Monitoring System (Cems) With Proper Data Storage And Controling Unit (With 01 Year Service Warenty) 1. Service Provider Should Have Experience In Similar Of Work . And Service Provider Must Performance Certificate Of Similar Work 2. Elctronic Equipment, Programmed Controller And Parts Will Be Arranged By The Service Provider. 3. They Will Be Fully Responsible For Safety Of Their Own & Their Support Staff 4. They Will Be Registered Under Gst. 5. They Will Be Submit Details Of Technical Team Related To Job. 6. They Should Complete The Job Before Crushing Season Starts. 7. Thay Should Provided Full Services Support For Two Year Or 2 Crushing Season. 44 Overhauling. Servicing Cheking And Trail Work Of Conductivity Control Valve (With Solenoid On/Off) With Its Ph And Conductivity Sensor. Mounted On (Cigar To Boiler Line) For Safety Purpose 1. Thay Will Be Fully Responsible For Safety Of Their Own & Their Support Staff. 2. Thay Will Be Submitt Detail Of Technical Team Related To Job. 3. Lodging And Boarding Will Be Arranged By The Service Provider. 4. They Will Be Taken Max 15 Days. 5. Service Warranty For 0Ne Year 45 Modification Of Acs 800 Drive With Complete Panel Make - Abb 46 Modification Of Capaciter Bank Make- Prabodhan 47 Multi Point Conductive Probe Chute Level Sensor With Its Controller Type – Capacitive And (Ir) Infrared Sensor For Mill House Level Monitoring, Installation & Trail Work Also Connected With Dcs . No Of Mill 04 Nos. No Of Controller 04 Nos. Warranty – 03 Year, Service Warranty – 03 Year Term & Conditions – 1. Lodging And Boarding Will Be Arranged By The Service Provider. 2. They Will Be Fully Responsible For Safety Labour And Tools Tackles Required Related To Job. 3. They Will Be Submit Detail Of Techniclas Team Related To Job. 4. They Will Be Taken Max 20Days To The Job. 48 A.M.C. Work Of Cctv Camera 49 A.M.C. Work Of Fiber Cable 50 Scraping & Painting Work Tank Shell With Roof. Ladder, Railing, Cooling Pipe Circulating Pipe, Vertical Tank For Various Area With All Structure Bidder Should Have Experience To Work On 15Mtrs Height In Similar Or Work Experience Of 15 Mtrs Height In Mechanical Erection Work, Job Description 1. Scraping Work 2. Primary Coating With Red Oxide 3. Final Second Coating With 2 Round Oil Paint Complete Work 51 Profile Sheet Shede Repairng Work (Sugar Godown, Sugar House, Boiling House, Boiler, Turbibe And Mill House Etc.) Service Provider Should Have Minimum 2 Years Experienc In Similar Nature Of Work. Labor Skill And Labor Insurance For Contractor
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 1 dayBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 1 dayTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender