Tender For Construction Of New Sub-Registrar Office Building, Waiting Hall, Lavatory, Record Room, Parking Place, Boundary Wall And Approach Road At Sub Register Office At Sukinda For The Year 2025-26 In The District Of Jajpur
Tender Overview
Project Description
Tender for Construction Of New Sub-Registrar Office Building, Waiting Hall, Lavatory, Record Room, Parking Place, Boundary Wall And Approach Road At Sub Register Office At Sukinda For The Year 2025-26 In The District Of Jajpur
BOQ
| Sl. No. | Item Description |
| 1 | 375 mm dia 9 mtr long double under ream pile (AS per design) in foundation in RCC M20 Grade of concrete etc completeSUB REGISTER OFFICE |
| 2 | WAITING HALL |
| 3 | Earthwork in excavation for foundation of in hard soil including dressing and leveling the bed fit for laying concrete and deposited the excavated materials away from work site etc complete. SUB REGISTER OFFICE |
| 4 | WAITING HALL |
| 5 | BOUNDARY WALL & APPROACH ROAD |
| 6 | Lavatory |
| 7 | Parking Space |
| 8 | Filling foundation and plinth with sand well watered and rammed with cost carriage royalty etc. SUB REGISTER OFFICE |
| 9 | WAITING HALL |
| 10 | BOUNDARY WALL & APPROACH ROAD |
| 11 | Lavatory |
| 12 | Parking Space |
| 13 | C.C.(1:4:8) in foundation and plinth with 4cm. size H.B. H.G. metal with all cost, carriage and royalty etc. complete.SUB REGISTER OFFICE |
| 14 | WAITING HALL |
| 15 | C.C.(1:3:6) in foundation and plinth with 4cm. size h.g. metal including cost carriage etc complete.as per specification & direction of the EIC.SUB REGISTER OFFICE |
| 16 | WAITING HALL |
| 17 | BOUNDARY WALL & APPROACH ROAD |
| 18 | Lavatory |
| 19 | Parking Space |
| 20 | Fly ash brick masonry in cement mortar ( 1:6 ) in foundation & plinth cost, carriage, royalty etc. complete.SUB REGISTER OFFICE |
| 21 | WAITING HALL |
| 22 | Lavatory |
| 23 | R.C.C. (1:1.5:3) with 12 mm size h.g. c.b. chips with cost carriage royalty of all materials etc. including centering and shuttering etc. complete.Column Base & footingSUB REGISTER OFFICE |
| 24 | WAITING HALL |
| 25 | Lavatory |
| 26 | Parking Space |
| 27 | Column and BeamSUB REGISTER OFFICE (G F) |
| 28 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 29 | WAITING HALL (G F) |
| 30 | WAITING HALL (FIRST FLOOR) |
| 31 | BOUNDARY WALL & APPROACH ROAD |
| 32 | Lavatory |
| 33 | Parking Space |
| 34 | Column BaseBOUNDARY WALL & APPROACH ROAD |
| 35 | Plinth BandSUB REGISTER OFFICE (G F) |
| 36 | WAITING HALL (G F) |
| 37 | BOUNDARY WALL & APPROACH ROAD |
| 38 | Lavatory |
| 39 | Parking Space |
| 40 | LintelSUB REGISTER OFFICE (G F) |
| 41 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 42 | WAITING HALL (G F) |
| 43 | WAITING HALL (FIRST FLOOR) |
| 44 | Lavatory |
| 45 | ChajjaSUB REGISTER OFFICE (G F) |
| 46 | WAITING HALL (FIRST FLOOR) |
| 47 | Lavatory |
| 48 | Roof BEAM Lavatory |
| 49 | Parking Space |
| 50 | Roof SlabSUB REGISTER OFFICE (G F) |
| 51 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 52 | WAITING HALL (GROUND FLOOR) |
| 53 | WAITING HALL (FIRST FLOOR) |
| 54 | Lavatory |
| 55 | Parking SpaceStaircase |
| 56 | SUB REGISTER OFFICE (G F) |
| 57 | WAITING HALL (GROUND FLOOR) |
| 58 | Labour for cutting bending binding M.S./Tor rod with cost , carriage etc. complete as per design,drawing,technical specification and direction of the EIC.SUB REGISTER OFFICE (G F) |
| 59 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 60 | WAITING HALL (GROUND FLOOR) |
| 61 | WAITING HALL (FIRST FLOOR) |
| 62 | BOUNDARY WALL |
| 63 | Lavatory |
| 64 | Parking Space |
| 65 | Brick masonary using Fly ash bricks in CM(1:6) in Super Structure and plinth with cost of all labour and materials, etc complete.SUB REGISTER OFFICE (G F) |
| 66 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 67 | WAITING HALL (GROUND FLOOR) |
| 68 | WAITING HALL (FIRST FLOOR) |
| 69 | BOUNDARY WALL |
| 70 | Lavatory |
| 71 | Parking Space |
| 72 | 12mm thick cement plaster ( 1:6 ) over brick work with cost, carriage royalty etc. complete. SUB REGISTER OFFICE (G F) |
| 73 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 74 | WAITING HALL (GROUND FLOOR) |
| 75 | WAITING HALL (FIRST FLOOR) |
| 76 | Lavatory |
| 77 | Parking Space |
| 78 | 16mm thick cement plaster ( 1:6 ) over brick work with cost, carriage royalty etc. complete. SUB REGISTER OFFICE (G F) |
| 79 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 80 | WAITING HALL (GROUND FLOOR) |
| 81 | WAITING HALL (FIRST FLOOR) |
| 82 | BOUNDARY WALL |
| 83 | Lavatory |
| 84 | Providing 20mm thick grading plaster using Cement Plaster (1:4) on roof slab including all materials,labour,T & P required for the work as per the direction of the Engineer in Charge.SUB REGISTER OFFICE |
| 85 | WAITING HALL |
| 86 | Distempering two coats over one coat of Primer with any approved shade including cost of distemper & Primer on New Plastered surface and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.SUB REGISTER OFFICE (G F) |
| 87 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 88 | WAITING HALL (GROUND FLOOR) |
| 89 | WAITING HALL (FIRST FLOOR) |
| 90 | Finishing walls with weather coat paint two coats over one coat of primer of approved shade on new work 2 coats to give an even shade including including cost of weather coat paint etc. complete as per direction of the Engineer in chargeSUB REGISTER OFFICE (G F) |
| 91 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 92 | WAITING HALL (GROUND FLOOR) |
| 93 | WAITING HALL (FIRST FLOOR) |
| 94 | BOUNDARY WALL |
| 95 | Lavatory |
| 96 | Parking Space |
| 97 | Supplying, fixing and fitting of M.S.Door and window shutters and grills with frames and all other fittings including all cost, conveyance and taxes etc.SUB REGISTER OFFICE |
| 98 | WAITING HALL |
| 99 | BOUNDARY WALL |
| 100 | Lavatory |
| 101 | Cement washing two coats including cost of all materials,labour,T & P required for the work as per the direction of the Engineer in ChargeSUB REGISTER OFFICE (G F) |
| 102 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 103 | WAITING HALL (GROUND FLOOR) |
| 104 | WAITING HALL (FIRST FLOOR) |
| 105 | Painting two coats over a coat of primer with any approved paint on new iron work including cost conveyance,taxes of all materials to site and all labour charges complete.SUB REGISTER OFFICE |
| 106 | WAITING HALL |
| 107 | BOUNDARY WALL |
| 108 | Wall Painting Two coats with plastic emulsion paint of approved shed on new work to give an even shade excluding cost of Paint. Lavatory |
| 109 | Providing two coats of enamel paiting over one coat of priming including all costs of labour etc. complete as per direction of E.I.C. Lavatory |
| 110 | Fixing tiles in floors treads or steps and landing (Vetified tile) on 25mm thick bed of cement mortar (1:1) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost as per direction of theEngineer in ChargeSUB REGISTER OFFICE |
| 111 | WAITING HALL |
| 112 | Lavatory |
| 113 | Fixing Kota tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing with cost carriage royalty of all materials etc. complete.SUB REGISTER OFFICE |
| 114 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of precast tiles as per as per direction of the Engineer in ChargeSUB REGISTER OFFICE |
| 115 | WAITING HALL |
| 116 | Lavatory |
| 117 | Fixing Chequered tiles in floors,treads etc. on 25mm thick bed of cement mortar ( 1:1 ) jointed with neat cement slury mixed with pigment to match the shades of the tiles including cost of tiles & rubbing and polishing etc.complete.Parking Space |
| 118 | 6mm thick Cement plaster (1:4) for RCC Surface finished smooth including closed deep chipping and slurry treatment including all charges etc complete as per direction of the Engineer in ChargeSUB REGISTER OFFICE (G F) |
| 119 | SUB REGISTER OFFICE (FIRST FLOOR) |
| 120 | WAITING HALL (GROUND FLOOR) |
| 121 | WAITING HALL (FIRST FLOOR) |
| 122 | Lavatory |
| 123 | Parking Space |
| 124 | Finishing wall surface with acrylic wall putty ( water Based ) of approved make and finished smooth and even surface to receive painting including cost of scaffolding ,staging including cost of all materials , labour etc.complete.SUB REGISTER OFFICE |
| 125 | SUB REGISTER OFFICE |
| 126 | Supplying , fitting , fixing of two track UPVC Sliding window made up Aluminium section 9778 as window frame 4095 ,4096 & 9777 ,3994 as shutter frame with 6mm (Frosted glass) as pannel fitted with rubber beading including fran locking arrangement including all fitting including cost of materials all taxes , labour , T & P etc. complete as per directon of Engineer in ChargeSUB REGISTER OFFICE |
| 127 | WAITING HALL |
| 128 | Supplying , fitting , fixing 32 mm thick flush door shutter with approved quality of 30 mm thick BWR block board pasted with 1mm thick sunmica on both sides of approved design & quality including cost of all fittings and fixtures etc.complete as per directon of Engineer in ChargeSUB REGISTER OFFICE |
| 129 | WAITING HALL |
| 130 | Lavatory |
| 131 | Supplying ,fitting & fixing of stainless of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mmx32mm x2mm @ rate 0.90mtr . c/c and stainless square pipe bracing of size 32mmx32mmx2mm in 3 rows in stair case as per approved design and specification, buffing , polishing etc with cost ,conveyance, taxes of all materials , labour, T&P etc. required for the complete in all respect.SUB REGISTER OFFICE |
| 132 | WAITING HALL |
| 133 | Providing, Laying and Fixing RCC Ventileter including cost conveyance,taxes of all materials to site and all labour charges complete.WAITING HALL |
| 134 | Fixed ventilator with Alm anodised sec. 9210& 9207 as single groove & double groove respectively as horizontal & vertical member and section 4660 as tappered clip and jointing angle no 1855 etc Lavatory |
| 135 | Providing and lying cement concrere C.C (1:2:4) with 12 mm size HBG chips with cost of all labour and materials.Boundary Wall & Approach Road |
| 136 | Supplying and fixing of 80 mm thick cement concrete interlocking Paver block of M-40 grade of approved make design.colour and size made by block making machine with proper compaction laid in require patten etc.complete in all respect confirming to IRC SP 63 :2018Boundary Wall & Approach Road |
| 137 | E.IWiringRecessed wiring to light point with 1.5 sq.mm FR PVC insulatedsingle core multistrand copper conductor of ISI marked with 20 mm dia non-metalic PVC flexible conduit with 5Amp, 250 V modular switch ISI marked and ceiling rose ISI marked mounted on MS box having front Modular base & cover of suitable size , MS box with 1 sq.mm FR PVC insulated single core multistrand copper conductor as earth wire including all accesories and connection as per direction of Engineer in Charge. ( Make of wire Finolex/ L&T / Anchor / Havels /HPL/ V Guard )do- Group A |
| 138 | do Group B |
| 139 | do Group C |
| 140 | Recessed wiring to Fan Point in do Group B |
| 141 | do Group C |
| 142 | Recessed wiring to Call Bell Point in do Group C |
| 143 | Recessed wiring to Exhaust Fan Point in do Group B |
| 144 | S/F of fan hook S type made of 16 mm MS rod for fixing in the Existing RCC Roof. |
| 145 | S/F of Angle holder replacing Ceilling RoseSwich Boards |
| 146 | S/F of 5A. Modular Switch & 5A. Modular Socket outlet of ISI marked on existing board |
| 147 | S/F of extension board of 6 modular Metal box with modular base & cover in recess including providing and fixing of 2 nos of 3pin 5/6amp modular socket out let & 2 nos of 5/6 amp modular switch, connection, painting etc as required. |
| 148 | S/F of Power point with 4 modular metal box with modular base & cover in recess including providing and fixing of 5 pin 15/16 amp. Modular switch & Socket, connection, painting etc as required |
| 149 | S/F of computer board consisting of 3 nos of 5amp modular plug and modular switch & 1 no of Mini MCB complete with wiring on 12 modular M.S. box with modular cover. |
| 150 | S/F of 1 no of 5 pin 15/16 amp. Socket , 1 no of switch & 1 no of 15/16A top with modular mini MCB, in 6 modular box with cover with connection, painting etc as required for Inverter connection |
| 151 | S/F of 18 SWG Modular metal box of following sizes (Nominal size) in recess with suitable size of Modular base & cover in front including cutting the wall and making good the same in case of recessed conduit as required. 2 Modular box with base & cover |
| 152 | 6 Modular box with base & cover |
| 153 | 8 Modular box with base & cover |
| 154 | 12 Modular box with base & cover |
| 155 | Sub-MainWiring for circuit / sub main wiring along with earth wire with following sizes of PVC insulated single core multistrand copper conductor with ISI marked conforming to IS-694/1990 in 20mm dia non metalic heavy duty flexible conduit 1.6mm in recessed PVC conduit as required (Make of wire - Finolex/L&T/Anchor/Havels/V-guard) 2x1.5+1x1.5 (1.8.1) |
| 156 | 2x2.5+1x1.5 (1.8.2) |
| 157 | 2x4+1x1.5 (1.8.3) |
| 158 | 2x6+1x2.5 (1.8.4) |
| 159 | 2x10+1x4 (1.8.5) |
| 160 | Inverter wiring (1x1.5smm) Copper wire (1.19.1) |
| 161 | Circuit Breakers S/F of C series SP MCB of 6 to 10A amp rating (As per direction of engineer in charge) 440Volt for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 162 | S/F of C series 4P MCB of 63A amp rating (As per direction of engineer in charge) 440Volt for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 163 | S/F of C series DP MCB of 16 amp rating (As per direction of engineer in charge) 440Volt for lighting and other loads in the existing MCB Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 164 | S/F of 4Way (8+12) TPN Double Door Distribution board ISI marked complete with connection, testing and commissioning etc. as required without MCB box (Make : Legrand / Hager / Scheider / Seimens) |
| 165 | Main switchesSupply, Installation testing & commissioning of Main Switches (IS13940 part 3/1993) of following coopacity on existing surface/wall mounting & complete with H.R.C fuse links, inter connections earthing etc as required as per direction of Engineer Incharge (Make Seimens/HPL/Anchor/L&T /Havels/C&S/R. K.) S/F of 63A ICDP main switch with MS box of 250mmx300mmx60mm deep ( (2.15A)+(1.24.16 ) |
| 166 | EarthingS/L of 25mm x 5mm Cu. earth strip in 40 mm dia G.I.Pipe |
| 167 | Item No.4. EARTHING Provision of maintenance free Chemical Earthing with 250 micron non corrosive copper bonded rod (CPRI Certified) of 2.4 mtr length and minimum 17.2 mm dia with provision of 25kg x 2=50kg back filling ground resistance improvement compound with ROHS certified including supply and installation of heavy duty envionmental friendly poly plastic earth pit chamber with cover as per I.E Rules .The earthing should be minimum 1.5 mtr. away from the building and the two earthings must be 10 feet apart from each other as per I.E Rules . |
| 168 | FittingsSupply and fixing of 230mm Exhust fan with all accessories and connections (Make:Usha-Aero Clean Plus DBB/Crompton- Trans Air 12 reversiable /Havells-Venti Air DS (HS)/Anchor Anmol delus R/Orient Power Flow DBB// Pollycab -Fresh on DBB ) |
| 169 | S/F of Call bell/Buzzer(Ding dong type) ISI marked suitable for DC/AC single phase 230 volts complete as required. (1.30) |
| 170 | S/F of 18-25Watt L.E.D Tube light fitting with all accessories and connections (Make:HPL/ Havells/PAC/Crompton/Polycab / Klite / Panasonic) |
| 171 | Supply and fixing of 1200mm A.C. Ceiling fan (1 star) with all accessories and connections with out fan regulator (Make:Usha Striker neo HS/CromptonHighspeed/Havells-Samrat ES/Anchor- Turbo Speed Star/Orient Summer Breeze Pro/ Great White - Aldous/ Pollycab - Vital HS ) |
| 172 | S/F step type modular fan regulator |
| 173 | Supply and fixing of 400 mm wall fan with all accessories and connections (Make:Usha-Maxx Air Ultra /Crompton WM Hiflow wave /HavellsAccelro(HS)/Anchor Altrix HS- OWH /Orient-Wall 43/ Great White - WYNO WF/ Pollycab -Aery HS ) |
| 174 | Supply & fixing of superior type Led bulk head fitting general domestic use ISI marked square oval type including necessary connections. ( M-5 ) |
| 175 | Supply and fixing of 60 Watt Single LED Street Light Fitting with LED & Electronic driver with all accessories and connections ( MakeCrompton/Phillips/HPL/Polycab/Havells / Klite / Panasonic ) |
| 176 | S/F of 10w Watt LED Bulb ( MakeCrompton/Phillips/HPL/Polycab/Havells / Klite / Panasonic ) |
| 177 | S/F of 2000VA/24V Invertor machine with 2 nos 180Ah tall tubular Battery including Trolly (Make Luminous /microtek/v-guard) |
| 178 | S/F of 24 watt LED recessed (Round / Square) shape Ceiling light fitting compoete with all connection.\ including fixing and all accessories as per direction of Engineer in Charge (Make: Havels / Phillps / Crompton / Polycab / HPL) |
| 179 | S/F of 15A socket on 2Modular Board board for A.C |
| 180 | S/F of 25A Moter Starter switch for A.C (Make: Havells / Anchor/Le-Grand) |
| 181 | CablesProvision of Armoured cable size 3 1/2 x50sqmm (26) |
| 182 | Laying of MV cable above 25sqmm to 120 sqmm in ground (5.1.2) |
| 183 | Laying of MV cable above 25sqmm to 120 sqmm on surface (Horizontally)(5.5.2) |
| 184 | PanelsSupply & fixing of 100 A TPN Panel board 1. 100A MCCB (Make : Legrand / Hager / Scheider / Seimens)-1no 2. 16 A DP MCB (Make : Legrand / Hager / Scheider / Seimens)- 3nos 3. TPN Busbar-2set4. 63Amp 4P Changeover-1No.5. Digital Volt meter & Ameter three phase 6. All accesories & Connection (Rating & Danger borad) |
| 185 | P.HSupplying all materials, labour, T&P and fitting and fixing UPVC SWR soil waste ventilating pipes and fittings of the following outside diameter conforming to ISI No 13592/1992 to walls with nails, bobbins and wooden plugs including jointing with supply of approved rubber lubricant by non heat application method/as per manufacturers specification, testing etc all complete as per P.H specification and direction of the E.I.C. 110mm diameter UPVC SWR pipes |
| 186 | 110mm UPVC P trap |
| 187 | 110mm UPVC Single junction door |
| 188 | 110mm UPVC Double junction door |
| 189 | 110mm UPVC door bend |
| 190 | 110mm UPVC Offset |
| 191 | 110mm UPVC plain bend |
| 192 | 110mm UPVC vent cowl |
| 193 | 125 mm dia C.P Grating |
| 194 | 75mm diameter UPVC pipes |
| 195 | 75mm UPVC Plain bend |
| 196 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 40mm H.G metal including watering, curing and conveyance of all materials to site payment of royalry, taxes etc all complete as per P.H specification and direction of the E.I.C.Ground Floor |
| 197 | Supplying all materials, labour, T&P and fixing porcelain glazed tiles in floors, on 25mm thick bed of cement mortar 1:1 joined with neat cement slurry mixed with pigment to match the shades of the tiles including rubbing and polishing etc. all complete as per specification and direction of the E.I.C.a) Ground Floor |
| 198 | b) 1st Floor |
| 199 | Supplying all materials, labour, T&P and fixing porcelain glazed tiles in dados/skirtings on 12mm thick cement plaster (1:3) joined with neat cement slurry mixed with pigments to match the shades of the tiles including rubbing and polishing etc. all complete as per direction of the E.I.C.a) Ground Floor |
| 200 | b) 1st Floor |
| 201 | supplying all materials, labour, T&P and cutting holes through existing brick/stone masonry walls for taking HCI/PVC pipes and fittings including making good the damages in cement mortar (1:4) etc. all complete as per P.H. specification and direction of E.I.C.375 mm thick wall |
| 202 | 250 mm thick wall |
| 203 | Supplying all materials, labour, T&P and laying in trenches UPVC SWR soil waste ventilating pipes and fittings of the following outside diameter conforming to ISI No 13592/1992 including jointing with supply of approved rubber lubricant by nonheat application method/as per manufacturers specification, testing, earthwork in excavation in all kinds of soil and providing bed concrete in P:C:C (1:4:8) using 40 mm size metal and haunch top the pipe with refilling of trenches etc all complete as per P.H specification and direction of the E.I.C.110 mm dia PVC Pipe all round |
| 204 | 160 mm dia PVC Pipe all round |
| 205 | Supplying all materials, labour, T&P and fixing wash down water closet(E.W.C) with integral S or P trap to the floor with wooden plug and C.P screw including jointing the trap with soil waste pipe in C.M(1:1) & PVC Seat cover etc all complete as per specification and direction of the E.I.C.EWC with Seat Cover(Hindware/Parryware) |
| 206 | Supplying all materials, labour, T&P and Factory made FRP(alternately called GRP) door frame of size 75mmx100mm fabricated using E glass Chopped Strand Mat (CSM) U.V stabilised Inopthalic Gelcoat and impregnated with Inopthalic resin. The thickness of the GRP skins shall not be less than 2.00mm. The door frame consist of four segments which are provided with plug in socket arrangement in situ in the mould. The segments are plugged in and are joined together by means of screw. The GRP frame shall be provided with wooden reinforcement on six locations for high screw holding capacity for for fixing metallic hold fast and shall be consolidated by filling with medium density foam/plaster of paris with fibre reinforcement, Six numbers of 260mm x 25mm x 5mm size S shaped M.S flat hold fast shall be provided with the frame. The material and process for manufacturing the door frames shall conform to RV-TIFAC composites Design Centres standards and specifications. The finish of door frame will be plain colour white/ Ivory/ Beige/ Light grey/ Golden brown/Mahogany/ Teak wood/sand stone/Champagne/Pastel blue or any other colour using high quality pigments complete in all respect as per specification and direction of the E.I.C |
| 207 | Supplying all materials, labour, T&P and fixing the Factory made single leaf rigid FRP(alternately called GRP) sandwich composite door shutter of 32mm thick laminated with two GRP skins with wood grain finish fabricated using UVstabilised Isopthalic Gelcoat and one layer of 450 gsm Eglass Chopped Strand Mat (CSM) impregnated with orthopthalic palyester resin. The thickness of the skins shall not be less than 1.50mm Expanded Polystyrone(EPS) structural foam panel of 29mm thickness and a density of 20kg/cu.mtr shall be used as core material. Wooden reinforcements made of seasoned sal wood block of cross section not less than 28mmx32mm and also necessary sal wood reinforcements for fitting the metal fittings such as tower bolts, aldrops, handles etc shall be provided. A structural adhesive compatible with (EPS) foam shall be used for bending the core material, the sal wood reiforcements and the skins. The material and process for manufacturing the door shutters shall conform to RV-TIFAC composites Design Centres standards and specifications and the door shutters tested in conformation to IS: 4020-1998. The finish of door shutter will be plain colour white/ Ivory/ Beige/Light grey/ Mahogany/Teak wood or any other colour using high quality pigments. Three heavy whight mild steel butt hinges type-I(ISI marked) size 100mm are to be fitted on one side of shutter. |
| 208 | Supplying all materials, labour, T&P and constructing Inspection Chamber of the following sizes with cement concrete (1:3:6) using 40 mm size HG metal on bed, 1st class KB Brick work in CM (1:6) moulding and shaping the channel inside and benching with C:C (1:1.5:3) using 12 mm size H.G chips, 12 mm thick cement plaster (1:3) with punning to inside, cement flush pointing (1:3) to outside, RCC cover slab in C.C(1:1.5:3) using 12 mm size H.G chips with RCC man hole cover, earth work excavation in all kinds of soil and refilling the cavity around the chamber including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per approved specification and direction of E.I.C. (a) Inside size 760mm x 760mm x 460mm |
| 209 | Supplying all materials, labour, T&P and constructing Manhole Chamber of the following sizes with cement concrete (1:3:6) using 40 mm size HG metal on bed, 1st class KB Brick work in CM (1:6) moulding and shaping the channel inside and benching with C:C (1:1.5:3) using 12 mm size H.G chips, 12 mm thick cement plaster (1:3) with punning to inside, cement flush pointing (1:3) to outside, RCC cover slab in C.C(1:1.5:3) using 12 mm size H.G chips with RCC man hole cover, earth work excavation in all kinds of soil and refilling the cavity around the camber including watering, curing, conveyance of all materials to worksite, payment of royalty, taxes etc. all complete as per approved specification and direction of E.I.C. (a) Inside size 900mm x 900mm x 900mm |
| 210 | Supplying all materials, labour, T&P and constructing Gully Trap chamber of the following inside size with 8 cm thick precast cover slab in CC (1:2:4) mix using 12 mm size H.G chips, foundation concrete (1:4:8) using 40 mm size HG metal on bed and around trap , !st class KB Brick work in CM (1:6) in F & P and inside 12 mm thick cement plaster (1:3) finished with a floating coat of neat cement including fixing 100mmx100mm size HCI gully trap 150mmx150mm size C.I grating etc. all completed as per approved drawing, specification and direction of E.I.C.(a) 250MM X 250MM Gully Trap Chamber |
| 211 | Supplying all materials, labour, T&P and constructing soakway pit of the following size with dry brick walling from bottom upto invert of inlet pipe and 1st class KB brick work in CM (1:6) for the remaining height at top, 12mm thick Cement Plaster (1:4) inside and outside over masonry brick work, gravel packing in the rear of well steining, RCC cover slab in CC (1:1.5:3) using 12mm HG chips, fitted with iron lifting handles including earthwork in open well excavation in all kinds of soil and refilling of cavity around the pit & painting the iron works, watering, curing, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per approved specification and direction of the E.I.C.(a) 1.20 m diax 2.0 m deep soakway pit |
| 212 | 1.00 m diax 2.0 m deep soakway pit |
| 213 | Supplying all materials, labour, T&P and constructing soakway pit of the following size with precast R.C.C rings joined loose gravel backing in the rear of well steining, RCC cover slab in CC (1:1.5:3) using 12mm HG chips, fitted with iron lifting handles including earthwork in open well excavation in all kinds of soil and refilling of cavity around the pit & painting the iron works, watering, curing, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per approved specification and direction of the E.I.C.(a) 0.91 m diax 2.10 m deep soakway pit |
| 214 | Supplying all materials, labour, T&P and providing and fixing to wall or ceiling or floor G.I. pipes and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling,and floor, testing all complete as per specification and the direction of the E.I.C.(a) 20mm dia C-PVC pipes |
| 215 | 15mm dia UPVC pipes |
| 216 | supplying all materials, labour, T&P and cutting holes through existing brick/stone masonry walls for taking GI/PVC pipes and fittings including making good the damages in cement mortar (1:4) etc. all complete as per P.H. specification and direction of E.I.C.(a) walls |
| 217 | Cutting Hole in RCC Roof/Floor |
| 218 | supplying all materials, labour, T&P and cutting grooves in pucca Floors, and walls for taking G.I/PVC pipes and fittings and repairing the holes after insertion of pipes etc with C.C (1:3:6) including finishing with 12mm C.P (1:3) complete so as to make it leak proof etc. all complete as per P.H. specification and direction of E.I.C. |
| 219 | Supplying all materials, labour, T&P and fixing bowl pattern urinal including connecting the urinal with waste pipeby means of white lead mixed with chopped hemp etc all complete as per specification and direction of the E.I.C.(a) Flat back lipped wall Urinal Magnum urinal |
| 220 | Supplying all materials, labour T&P and fixing wash basins with C.I. or M.S.brackets painted white including cutting holes in walls and making good the damages with supply of wooden plugs, screws and cement etc, fixing PVC waste pipe of 32mm nominal diameter for wash basin including brass check nut complete, fixing 32mm dia CP brass waste, etc all complete as per specification and direction of the E.I.C.(a) 550mm x 400mm W.H.basin |
| 221 | Supplying all materials, labour, T&P and fixing mirror of superior glass mounted on 6mm thick A.C.sheet or plywood sheet and fixed to wooden plugs with CP screws and washers complete as per specification and direction of the E.I.C.(a) Mirror with plastic moulded frame |
| 222 | Supplying all materials,labour, T&P and fixing standard sized CP towel rail complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the E.I.C. a) 20mmx450mm long CP towel rail |
| 223 | b) C.P Towel ring (St) |
| 224 | Supplying all materials, labour, T&P and fixing CP soap holder complete with CP brass brackets fixed to wooden plugs with CP screws as per specification and direction of the E.I.C. (a) CP soap holder |
| 225 | Supplying all materials, labour T&P and fitting and fixing of C.P Shower with 15mm or 20mm inlet with C.P Shower arm including polishing etc all complete as per specification and direction of the E.I.C. (a) 15 mm dia C.P Shower with arm (Parryware make) |
| 226 | Earthwork in all kinds of soil in excavation of foundation trenches within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30m in depth etc all complete as per direction of the E.I.C.(a) Initial lift upto 1.5 mtr |
| 227 | From 1.5 mtr to 3.0 mtr depth |
| 228 | Supplying all materials, labour, T&P and filling in foundation and plinth with river sand well watered and rammed including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per the direction of the E.I.C. |
| 229 | Supplying all materials, labour, T&P and providing cement concrete (1:3:6) with 40mm H.G metal including watering, curing and conveyance of all materials to site payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 230 | Supplying all materials, labour, T&P and providing plain cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 231 | Supplying all materials,labour, T&P and providing Brick work with Fly ash Brick having crushing strength not less than 75 Kg/CM2 with dimensional tolerence of +/- 8% in C.M including watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.(a) In Foundation and Plinth in C:M (1:4) |
| 232 | Supplying all materials, labour, T&P and providing cement plaster on brick/stone work including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.(a) 20mm thick C.P in C:M (1:3) |
| 233 | Supplying all materials, labour, T&P and providing cement punning on plastered surface including watering,curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 234 | Supplying all materials, labour, T&P and providing rigid and smooth centering and shuttering for RCC work including false work and dismantling them after casting including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 235 | Supplying all materials, labour, T&P and providing M.S.reinforcements for RCC work including cutting, bending, binding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 236 | Supplying all materials, labour, T&P and providing Reinforced cement concrete (1:1.5:3) with 12mm size H.G chips including watering, curing and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 237 | Supplying all materials, labour, T&P and making M.S. Step Iron in 20mm Dia M.S Steel bars and fixing into walls of Manhole/ Septic Tanks duly embeded in C.C(1:2:4) etc all complete as per P.H specification and direction of the E.I.C. |
| 238 | Supplying all materials, labour, T&P and providing 50mm thick pre-cast R.C.C. baffle wall in R.C.C(1:1.5:3) including reinforcement cage using 12mm size HG chips fitted and fixed in position, finished smooth etc. complete including cutting grooves and mending good the damages etc all complete as per P.H specification and direction of the E.I.C. |
| 239 | Supplying all materials, labour, T&P and providing 110mm dia P.V.C Tee inside the septic tank including cutting holes and duly embeded in P.C.C(1:1.5:3) using 12mm size HG chips fitted and fixed in position and mending good the damages etc all complete as per P.H specification and direction of the E.I.C. |
| 240 | Supplying all materials, labour,T&P and providing 12mm thick cement flush pointing in C:M (1:3) to Brick Masonry works including watering curring and conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C. |
| 241 | Supplying all materials, labour,T&P and filling Foundation and Plinth with excavated earth including watering, ramming etc all complete as per direction of the E.I.C. |
| 242 | Supplying all materials, labour, T&P and providing and fixing to wall or ceiling or floor G.I. pipes and pipe fittings of the following nominal bore with clamps including making good the wall, ceiling,and floor, testing all complete as per specification and the direction of the E.I.C.(a) 25mm dia PVC (ASTM) pipes |
| 243 | 32mm dia PVC (ASTM) pipes |
| 244 | 20mm dia PVC (ASTM pipes |
| 245 | Supplying all materials, labour, T&P and fitting and fixing Brass/CP fittings of the following nominal bore with supply of all jointing materials etc. all complete as per specification and the direction of the E.I.C. (a) 15mm dia CP Bib Cock (S.B) (Jaquar make) |
| 246 | 15mm dia CP Bib Cock (L.B) (Jaquar make) |
| 247 | 15mm dia CP Angle Stop Cock (Jaquar make) |
| 248 | 15mm dia CP Concealed Stop Cock (Jaquar make) |
| 249 | 15mm dia CP Pillar Cock (Jaquar make) |
| 250 | 15mm dia CP 2-in1 Bib Cock (Jaquar make) |
| 251 | 15mm dia CP Health Fuccet |
| 252 | 25mm dia PVC Full Way Valve |
| 253 | 32mm dia PVC Full Way Valve |
| 254 | 15mm dia CP Extension Nipple |
| 255 | 15mm dia CP Flange |
| 256 | Supplying all materials, labour T&P and fitting and fixing 10 Ltrs capacity PVC low level flushing cistern with a pair of C.I. or M.S.brackets complete with fittings such as syphonic arrangement, 15mm nominal size Brass/PVC ball valve with polythene float, CP/Brass handle, unions and couplings for connection with inlet, outlet, overflow pipes, 32mm dia PVC flush bend, 15mm dia PVC connection pipes including cutting holes and making good the same and connecting the flush bend with cistern and closet and connecting inlet pipe with supply main with etc all complete as per specification and direction of the E.I.C. (a) 10 lit PVC L/L Cistern |
| 257 | Supplying all materials, labour, T&P and construction of masonry staging with providing 1st class K.B. Brick work in C.M.(1:6) of 0.46mtr height in staging, 12 mm cement plaster in C.M (1:6), R.C.C. Beam of 0.25mx0.30mx2.60m & roof slab of 1.40mx1.40m in C.C (1:1.5:3) using 12mm size H.G.Chips including centering, shuttering, bending and binding of rod etc watering, curring, conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.(a) 2000 lits capacity on the roof of 1st floor |
| 258 | Supplying all materials, labour, T&P and Fitting and Fixing of Rotational moulded polythene cylindrical vertical water storage tank conforming to 15701/1996 including cutting holes through the tank and fixing mild steel tubes and fittings and providing extra sockets and jamnuts, including hoisting upto a height of 5 mtr above G.Land placing the tank in required position including conveyance of all materials to work site, payment of royalty, taxes etc all complete as per P.H specification and direction of the E.I.C.(a) 2000 lits capacity on the roof of 1st floor |
| 259 | Sinking of 125 x 100mm dia Tubewell through DTH MethodLabour for drilling a perfectly vertical bore hole at specified dia for a specified depth below ground level through consolidated and unconsolidated rock with down the hole hammer drilling rigs or combination rigs as required to suit the site condition as per the direction of the Engineer-in-charge including use of own rigs with its accessories, tools and plants and consumables etc for lowering of 200 mm dia P.V.C/G.I/MS pipes for housing fitted socket and with or without well screen as per the necessity for soft, medium, hard and boulder formation (G.I/P.V.C/M.S casing pipes if required to prevent collapse of over burden is to be provided by the contractor including lowering and withdrawing after completion of the tubewell)(a) Drilling of 125mm dia bore :-00 mtr to 30.00 mtr |
| 260 | Drilling of 100mm dia bore :-00 mtr to 30.00 mtr |
| 261 | Lowering of the following size G.I/P.V.C pipes with or without slotted pipes as per the necessary from ground level upto 30 mtrs depth and fitted and fixed up in perfectly vertical position including cutting and threading pipes and slotted pipe and supplying and fixing all jointing materials, tools and plants complete and keeping the top of the casing pipe threaded including plugging tubewell to prevent entry of foreign materials from above. (a) Lowering of 125 mm dia PVC pipes :- 00-30.00 mtr |
| 262 | Cost of 125 mm dia PVC pipes :- 00-30.30 mtr(Sch-80) |
| 263 | Cleaning and developing the tube well using their own compressor continuously worked till clean and adequate discharge is obtained from the tubewell including supply and use of all necessary equipments and labour as per the direction of Engineer-in-charge. |
| 264 | Suppying all material ,labour T&P and withdrawing casing pipe from the unsuccessful bore. |
| 265 | Supply of I.S.I mark 1.00 HP single phase Vertical submersible pump set with discharge of 1800-2200 itr/hour and a head of 45-60 mtr of reputed make like KSB/TEXMO & eqivalent including all cost,conveyance and taxes etc.all complete as per direction of E.I.C. |
| 266 | Supplying,fitting and fixing of I.S.I mark D.O.L starter of reputed make like BCH or equivalent for 0.50 HP single phase vertical submersible pump set including all cost,conveyance and taxes etc.all complete as per direction of E.I.C. |
| 267 | Supplying,fitting and fixing of three core flat cable (1.5 mm2) of I.S.I marked of reputed make like BCH/Finolex or equivalent and connecting the pump and starter including all cost,conveyance and taxes etc.all complete as per direction of E.I.C. |
| 268 | Supplying,fitting and fixing of HDPE pipe and fittings with making connection to pumpset including all cost,conveyance and taxes etc.all complete as per direction of E.I.C. (a) 32mm dia. HDPE pipe Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender