Bids Are invited for Isntallatin Of Protection Panel
Tender Overview
Project Description
Bids Are invited for Isntallatin Of Protection Panel Disconnection Of Cables, Noting Tbs, Tagging Cables, - Disconnection Of Cables, Noting Tbs, Tagging Cables, Lowering Down Cable From Grp Panels , Disconnection Of Earthing Strip And Dismantling Of Grp Panels By O - Disconnection Of Earthing Strip And Dismantling Of Grp Panels By Opening Nut Bolt Or Cutting Down Welding Points , Removal Of Grp Panels From Ucb, Shifting And Safe Storage At Site - Removal Of Grp Panels From Ucb, Shifting And Safe Storage At Site/Central Store Or Any Other Safe Place Within The Plant As Decided By Emd-I Representative , Installation Of Suitable Size Panel - Installation Of Suitable Size Panel (Panel Will Be Provided By Contractor) And Shifting Of Synchronizing Relays, Stator Water Flow Relay And Timer, Conductivity Relays From Old Panel To New Panel By Cutting Welding And Modification In Cabling And Drawing , Removal Of All Electromechanical Relays From Grp Panels, - Removal Of All Electromechanical Relays From Grp Panels, Cleaning, Testing, Tagging And Storage At Control Protection Store
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Disconnection of cables, Noting TBs, Tagging cables, | Disconnection of cables, Noting TBs, Tagging cables, Lowering down cable from GRP Panels |
| 2 | Disconnection of earthing strip and dismantling of GRP Panels by o | Disconnection of earthing strip and dismantling of GRP Panels by opening nut bolt or cutting down welding points |
| 3 | Removal of GRP Panels from UCB, shifting and safe storage at site | Removal of GRP Panels from UCB, shifting and safe storage at site/central store or any other safe place within the plant as decided by EMD-I representative |
| 4 | Installation of suitable size panel | Installation of suitable size panel (Panel will be provided by contractor) and Shifting of Synchronizing relays, Stator water flow relay and timer, Conductivity relays from old panel to new panel by cutting welding and modification in cabling and drawing |
| 5 | Removal of all Electromechanical relays from GRP panels, | Removal of all Electromechanical relays from GRP panels, cleaning, testing, tagging and storage at control protection store |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 6 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 6 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender