Tender For Special Repairs To Godown No. 1 To 3, Painting Of Walls Inside And Outside, Servicing Of Rolling Shutters, Top And Ventilators Including Painting, Repairs To Road And Construction Of Static Tank At Nall Alli Warehouse.
Tender Overview
Project Description
Tender for Special Repairs To Godown No. 1 To 3, Painting Of Walls Inside And Outside, Servicing Of Rolling Shutters, Top And Ventilators Including Painting, Repairs To Road And Construction Of Static Tank At Nall Alli Warehouse.
BOQ
| Sl. No. | Item Description |
| 1 | Earth work Open excavation by Mechanical Means for Open Earthwork in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms etc., complete complying with standard specification and as directed by the departmental officers. |
| 2 | Earth work excavation for foundation by Mechanical means for Isolated & Combined Footing etc in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 100 mts and clearing and levelling including dressing of sides and raming of bottoms at the site, etc., complete complying with standard specification and as directed by the departmental officers. |
| 3 | Supplying and filling in foundation, basement, etc with filing crushed stone dust in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 4 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers - Mixing by mechanical means |
| 5 | Plain Cement Concrete 1:2:4 (one cement, two crushed stone sand and four hard broken stone jelly) using 20mm jelly for wearing coat including laying, compacting, finishing and curing, etc., complete as per standard specificatins and as directed by the departmental officers.- Mixing by mechanical means |
| 6 | Providing expansion joint at 5mtr intervals across the flooring by cutting the grooves 6mm wide and full depth of concrete by contractors own mechanical means and filling the gap with polysulphide sealent and adding admixtures recron 3s for crackfree construction at the rate of 125 gms pack per 50 kg of cement with all lead, lift and other incidental works, etc complete and as directed by the Engineer-Incharge. |
| 7 | Providing two legged scaffolding using 13-15cm dia casuarinas post of 4m over all length (3m length + 0.5m projection + 0.5m into the ground) the distance between two rows being 1.5m and the spacing of the post being 2.0m in both rows with two horizontal posts with 0.5m.Overlap on either side and braces at 2.0m center to center including longitudinal and transverse middle braces to step and providing platform with country wood planks of 40mm thick and 1m width etc., complete complying with standard specification. |
| 8 | Upto 8.00m height |
| 9 | Upto 8.00m to 10.5m height |
| 10 | Clean removal of Cement plaster from walls, depositing the debris in the low lying areas inside the campus as directed by the Engineer - Incharge.. |
| 11 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 12 | Cement Concrete 1:1.5:3 (One Cement, One and half crushed stone sand and Three hard broken stone jelly) using 20 mm gauge hard broken granite stone jelly for all RCC items of works excluding cost of reinforcement grill and fabricating charges, centering and shuttering but including Super Plasticiser, mixing charges for machine mix, laying, vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary and bearing surfaces of walls, beams etc. shall be finished smooth with Cement Mortar 1:3 (One Cement and Three Sand) and kraft paper laid over it without claiming extra, etc., complete complying with standard specification and as directed by the departmental officers - machine mix |
| 13 | For Foundation and Basement |
| 14 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel reinforcement grills of all variety like HYSD/CTD/TMTand all grade like Fe 500, Fe550D, Fe 500 D etc., for all RCC works as per design given including cost of steel reinforcement and G.I. binding wire, wastage etc. complete complying with standard specification and as directed by the departmental officers.(Contractor has to make his own arrangements for the supply of steel reinforcement and binding wire) |
| 15 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). |
| 16 | Special ceiling plastering and finishing the exposed surface of all RCC items of work such as slabs, beams, sunshades, facia, canopy slab, staircase waist slab, landing slab etc., with Cement Mortar 1:3 (One Cement and Three Plastering Sand) 10mm thick including mortar plasticizer at 200ml per 50Kg of cement used , hacking the surfaces and curing, etc., in all floors complying with standard specification and as directed by the departmental officers |
| 17 | Painting New Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the departmental officers before use on works.) |
| 18 | Painting Old Plastered Wall Surface with Two finishing coats of ready mixed (Emulsion) of approved quality and colour over the existing wall in all floors including thorough scrapping of old walls etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the departmental officers before use on works.) |
| 19 | Painting Old wood work with Two coat of synthetic enamel ready mixed paint of approved quality and colour in all floors including thorough scrapping of old paint etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the departmental officers before use on works.) |
| 20 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors including thorough scrapping of old paint etc., complete complying with standard specification and as directed by the departmental officers.(The make, quality and colour of paint should be got approved by the departmental officers before use on works.) |
| 21 | Sub total |
| 22 | GST in 18% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender