Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Service Provider - 33 Kv Lines , Stp-13 M Long Sp-72 Bottom Galvanised , 33 Kv Polymer Disc Insulator
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Service Provider - 33 Kv Lines , Stp-13 M Long Sp-72 Bottom Galvanised , 33 Kv Polymer Disc Insulator 70 Kn B& S Type , Disc Fitting 70 Kn , M.S. Angle Iron 65X65x6 Mm, 4300 Mm (Bracing With 4 Cl ) For 33 Kv , Top Channel 125X65x6 Mm,3200 Mm (10.7 Kg/M) With Cl , Stone Pad (300X300x75 Mm) , 33 Kv Number Plate With Cl And N & B , 33 Kv Danger Board With Cl And N & B , G.I. Barbed Wire , Nut, Bolt & Washers , Alluminium Paint , Red Oxide Paint , Stay Set Complete (Gi Staybrod 20X1800 Mm, Stay Wire 7/8 Swg 10 Kg, Stay Cl ,Bolt Nut& Washer , Earthing Of Pole By Ms Earthing Rod Of 20X2500 Mm And 6 Swg Earthing Wire Etc. , Feeder Name Board 200X500x1.6 Mm3. Include Cl S With N&B , 33 Kv Xlpe Cable 3X300 Sqmm , 33 Kv Cable Joiting Kit Outdoor For 3X300 Sqmm Xlpe Cable , 33 Kv Cable Jointing Kit Straight Through For 3X300 Sqmm Xlpe Cable , G.I.Pipe 6 Dia With Holding Cl (Below 6 Inch Of Ground) , Hosting Of 33 Kv Xlpe Cable At Double Pole (Erection Work) , Concreting Of Support 0.268 Cu.Mtr/Pole (Erection Work) , Laying Of 3X300 Sqmm Xlpe Cable Including Cost Of Sand & Bricks (Erection Work) , Concreting Of Stay (Erection Work) , Dismantle All Old Line And Deliver The Scrap Material To The Store Center Mahoba (Erection Work)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | 33 KV lines | 33 KV lines |
| 2 | STP-13 M LONG SP-72 BOTTOM GALVANISED | STP-13 M LONG SP-72 BOTTOM GALVANISED |
| 3 | 33 KV POLYMER DISC INSULATOR 70 KN B& S TYPE | 33 KV POLYMER DISC INSULATOR 70 KN B& S TYPE |
| 4 | DISC FITTING 70 KN | DISC FITTING 70 KN |
| 5 | M.S. Angle Iron 65x65x6 mm, 4300 mm (Bracing With 4 Clamp) for 33 KV | M.S. Angle Iron 65x65x6 mm, 4300 mm (Bracing With 4 Clamp) for 33 KV |
| 6 | Top Channel 125x65x6 mm,3200 mm (10.7 kg/m) With Clamp | Top Channel 125x65x6 mm,3200 mm (10.7 kg/m) With Clamp |
| 7 | Stone Pad (300x300x75 mm) | Stone Pad (300x300x75 mm) |
| 8 | 33 KV Number Plate With Clamp And N & B | 33 KV Number Plate With Clamp And N & B |
| 9 | 33 KV Danger Board With Clamp And N & B | 33 KV Danger Board With Clamp And N & B |
| 10 | G.I. Barbed Wire | G.I. Barbed Wire |
| 11 | Nut, Bolt & Washers | Nut, Bolt & Washers |
| 12 | Alluminium Paint | Alluminium Paint |
| 13 | Red Oxide Paint | Red Oxide Paint |
| 14 | Stay Set Complete (GI staybrod 20x1800 mm, stay wire 7/8 SWG 10 KG, stay clamp,bolt nut& washer | Stay Set Complete (GI staybrod 20x1800 mm, stay wire 7/8 SWG 10 KG, stay clamp,bolt nut& washer |
| 15 | EARTHING OF POLE BY MS EARTHING ROD OF 20X2500 MM AND 6 SWG EARTHING WIRE ETC. | EARTHING OF POLE BY MS EARTHING ROD OF 20X2500 MM AND 6 SWG EARTHING WIRE ETC. |
| 16 | FEEDER NAME BOARD 200X500X1.6 MM3. INCLUDE CLAMPS WITH N&B | FEEDER NAME BOARD 200X500X1.6 MM3. INCLUDE CLAMPS WITH N&B |
| 17 | 33 KV XLPE Cable 3x300 SQMM | 33 KV XLPE Cable 3x300 SQMM |
| 18 | 33 KV Cable Joiting Kit Outdoor for 3x300 sqmm XLPE Cable | 33 KV Cable Joiting Kit Outdoor for 3x300 sqmm XLPE Cable |
| 19 | 33 KV Cable Jointing Kit Straight Through for 3x300 sqmm XLPE Cable | 33 KV Cable Jointing Kit Straight Through for 3x300 sqmm XLPE Cable |
| 20 | G.I.PIPE 6\\" DIA WITH HOLDING CLAMP (BELOW 6 INCH OF GROUND) | G.I.PIPE 6\\" DIA WITH HOLDING CLAMP (BELOW 6 INCH OF GROUND) |
| 21 | Hosting of 33 kv XLPE cable at double pole (Erection Work) | Hosting of 33 kv XLPE cable at double pole (Erection Work) |
| 22 | Concreting of Support 0.268 CU.MTR/Pole (Erection Work) | Concreting of Support 0.268 CU.MTR/Pole (Erection Work) |
| 23 | LAYING OF 3X300 SQMM XLPE CABLE INCLUDING COST OF SAND & BRICKS (Erection Work) | LAYING OF 3X300 SQMM XLPE CABLE INCLUDING COST OF SAND & BRICKS (Erection Work) |
| 24 | Concreting of Stay (Erection Work) | Concreting of Stay (Erection Work) |
| 25 | Dismantle all old line and deliver the scrap material to the store center Mahoba (Erection Work) | Dismantle all old line and deliver the scrap material to the store center Mahoba (Erection Work) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender