Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi Turnkey - Cartage Of 8.5M/11M/13M Poles From Store Hamirpur Or Any Other Place To The Respective
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Commercial; Electrical System Or Installation; Semi Turnkey - Cartage Of 8.5M/11M/13M Poles From Store Hamirpur Or Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Aldo Including Etc And Also Including The Cost Of T&P Carrier Etc Require For Proper Completion Of Work. , Cartage Of Line Material Viz Stone Pad, Top Channel, Dropper Channel, Disc Insulator Etc And Other Material From Edc/Ask Hamirpur Or Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading & Unloading At The Respective Ends Including The Work Of Its Dragging Etc And Also Including The Cost Of Labour T&P And Carrier Etcrequire For Proper Compleion Of Work. , Erection Of 8.5M/11M/13M Poles Single Support Of Poles Including Complete Ht/Lt Fitting As Per Manual And As Per Direction Of Engineer Incharge The Cost Of Labour T&P And Carrier Etc Require For Proper Completion Of Work. , Erection Of 8.5M/11M/13M Poles Double Support Of Poles Including Complete Ht/Lt Fitting As Per Manual And As Per Direction Of Engineer Incharge The Cost Of Labour T&P And Carrier Etc Require For Proper Completion Of Work. , Grouting Of Poles 8.5M/11M/13M Poles As Per Resspo Manual And As Per Direction Of Engineer Incharge Included The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. The Support Shall Be Grouted With Cement Sand Ballast/Stone Pad Etc As Per Actual Site Required. , Erection & Grouting Of Stya Set As Per Resspo Manual And Also Including The Cost Of All Grouting Material Labour T&P For Proper Completion Of Work. , Erection Of Earthing Complete As Per Direction Of Supervising Engineer. It Including The Cost Of Labour T&P Carrier Etc Required For Proper Completion Of Work. , Laying, Sagging, Stringing, Binding Etc Of All Type Cable New On The Newly Erected Pole Any Other Place Asper Resspo Manual And As Per Direction. , Laying, Sagging, Stringing, Binding Etc Of Lt Armoured Cable 3.5X70 & 3.5X120 Sqmm New On The Newly Erected Pole Any Other Place As Per Resspo Manual And As Per Direction Of Supervising Engineer. , Three Chooping Of 11 Kv Line , Supply & Installation Of All Type Cl S , Supply Of Different Size Of Nut Bolt
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | CARTAGE OF 8.5M/11M/13M POLES FROM STORE HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS ALDO INCLUDING ETC AND ALSO INCLUDING THE COST OF T&P CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 2 | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. | CARTAGE OF LINE MATERIAL VIZ STONE PAD, TOP CHANNEL, DROPPER CHANNEL, DISC INSULATOR ETC AND OTHER MATERIAL FROM EDC/ASK HAMIRPUR OR ANY OTHER PLACE TO THE RESPECTIVE SITE OF WORK THROUGH THE KACHHA PACCA ROAD INCLUDING THE WORK OF ITS LOADING & UNLOADING AT THE RESPECTIVE ENDS INCLUDING THE WORK OF ITS DRAGGING ETC AND ALSO INCLUDING THE COST OF LABOUR T&P AND CARRIER ETCREQUIRE FOR PROPER COMPLEION OF WORK. |
| 3 | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES SINGLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 4 | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. | ERECTION OF 8.5M/11M/13M POLES DOUBLE SUPPORT OF POLES INCLUDING COMPLETE HT/LT FITTING AS PER MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE THE COST OF LABOUR T&P AND CARRIER ETC REQUIRE FOR PROPER COMPLETION OF WORK. |
| 5 | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. | GROUTING OF POLES 8.5M/11M/13M POLES AS PER RESSPO MANUAL AND AS PER DIRECTION OF ENGINEER INCHARGE INCLUDED THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. THE SUPPORT SHALL BE GROUTED WITH CEMENT SAND BALLAST/STONE PAD ETC AS PER ACTUAL SITE REQUIRED. |
| 6 | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. | ERECTION & GROUTING OF STYA SET AS PER RESSPO MANUAL AND ALSO INCLUDING THE COST OF ALL GROUTING MATERIAL LABOUR t&p FOR PROPER COMPLETION OF WORK. |
| 7 | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. | ERECTION OF EARTHING COMPLETE AS PER DIRECTION OF SUPERVISING ENGINEER. IT INCLUDING THE COST OF LABOUR T&P CARRIER ETC REQUIRED FOR PROPER COMPLETION OF WORK. |
| 8 | LAYING, SAGGING, STRINGING, BINDING ETC OF ALL TYPE CABLE NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. | LAYING, SAGGING, STRINGING, BINDING ETC OF ALL TYPE CABLE NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE ASPER RESSPO MANUAL AND AS PER DIRECTION. |
| 9 | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. | LAYING, SAGGING, STRINGING, BINDING ETC OF LT ARMOURED CABLE 3.5x70 & 3.5x120 SQMM NEW ON THE NEWLY ERECTED POLE ANY OTHER PLACE AS PER RESSPO MANUAL AND AS PER DIRECTION OF SUPERVISING ENGINEER. |
| 10 | THREE CHOOPING OF 11 KV LINE | THREE CHOOPING OF 11 KV LINE |
| 11 | SUPPLY & INSTALLATION OF ALL TYPE CLAMPS | SUPPLY & INSTALLATION OF ALL TYPE CLAMPS |
| 12 | SUPPLY OF DIFFERENT SIZE OF NUT BOLT | SUPPLY OF DIFFERENT SIZE OF NUT BOLT |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender