Tender For As And As To Area Drain Near Quarantine Center (P-206) And Behind Brahmaputra Building At Nausena Baugh, Visakhapatnam
Tender Overview
Project Description
Tender for As And As To Area Drain Near Quarantine Center (P-206) And Behind Brahmaputra Building At Nausena Baugh, Visakhapatnam
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 20-Aug-2026 | DATE CORRIGENDUM | Date | 04-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Demolition of reinforced cement concrete in any position not otherwise specifically provided for and removing rubbish to outside MD land complete all as specified and directed. |
| 2 | Demolition of un-reinforced cement Concrete of any description and in any position not otherwise specifically provided for and removing rubbish to a distance n.exe 100 m complete all as specified and directed. |
| 3 | Demolition of brick work or stone / boulder masonry, built in cement mortar including all quoins, pillars etc stacking the serviceable bricks after removing mortar and cleaning for re-use and disposal of debris and rubbish outside MD land as directed by the Engr-in-Charge. |
| 4 | M & L for Plain cement concrete 1:3:6, type C-2 (using 40 mm graded stone aggregate) as in foundation, filling and mass concrete, etc complete all as specified and directed. |
| 5 | M & L for Reinforced Cement Concrete M-30 (Design Mix) (using 20 mm graded stone aggregate) as in foundations including rafts, footings, beams and mass concrete, etc complete all as specified and directed. (Note\\" Reinforcement will be measured and paid seperately) |
| 6 | M & L for Reinforced Cement Concrete M-30 (Design Mix) (using 20 mm graded stone aggregate) as in walls, retaining walls,basement walls, ballast walls and the like; any thickness; above top of footings; including attached pilasters and buttresses complete all as specified and directed |
| 7 | M & L for Reinforced Cement Concrete M-30 Design Mix (Using 20 mm graded stone aggregate) as in slab supported on walls, beams and columns in floors, roofs, landings, balconies, and in shelves and the like etc complete all as specified and directed. (Note: Reinforcement will be measured and paid seperately) |
| 8 | M & L for use & waste Formwork to sides of concrete foundations, footings, bases of columns, raft and raft beams, sides and soffits (if any) of foundations and plinth beams and similar work, vertical or to batter complete all as specified and directed. |
| 9 | Use and waste of formwork to faces of walls,retaining walls, abutments, parapets and staircase railings and similar work including attached pillasters, buttresses,etc.; vertical or to batter for rough finish surface of concrete complete all as specified and directed |
| 10 | Use & waste form work to soffits of suspended slabs such as roof slabs, floor slabs, landings and similar work; not exceeding 200 mm thick (Horizonal or sloping) for flat rough finished surfaces of concrete complete all as specified and directed. |
| 11 | S & F high strength corrosion resistant TMT steel bars 10 mm dia., and over cut to length, bend to shape required, including cranking, bending spirally for hooping for columns, hooking ends and binding with and including mild steel wire (annealed) not less than 0.9 mm dia or securing with clips quality complete all as specified and directed. |
| 12 | M&L for 230 mm thick soling (or sub base) with broken boulders or quarried stone, inter stices filled, surface formed and rolled and consolidated to required gradient and camber complete all as specified and directed. |
| 13 | Excavation over areas, n.exc 1.5 m in depth and getting out in soft/loose soil complete as specified and directed. |
| 14 | Removing building materials etc, (other than spoil) to a distance exc 1.5 km but n.exe 5km, beyond the lead included in the rates, including loading, unloading and stacking at the destination. |
| 15 | Removing excavated material not exc. 50 m and depositing where directed at a level not exc 1.5 m above the starting point complete all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 9 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 9 daysBid Opening Date