Power Boards / Undertakings / PSU Closing in 11 days TDR #57045175

Tender For Constructing Ht Line Using Covered Conductor And Installing 100Kva Dtr At Vayyankara Tourism Point At Electrical Section Thengamom Pallickal

Issued by Boards / Undertakings / PSU · Alappuzha, Kerala
Tender Value
Ref. Documents
Estimated cost
Bid Submission
03 Sep 2026
11 days left
EMD
15200
Bank guarantee accepted
Document Fee
1534
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Alappuzha → Kerala
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Tender for Constructing Ht Line Using Covered Conductor And Installing 100Kva Dtr At Vayyankara Tourism Point At Electrical Section Thengamom Pallickal

BOQ

Name of Work:- Constructing HT line using covered conductor and installing 100kVA DTR at Vayyankara Tourism point at Electrical Section Thengamom Pallickal
Sl. No. Item Description
1Fitting and providing oneStrut using HT PSC poleincluding digging and backfilling pit in ordinary soil.
2Labour charges for loadingHT PSC pole from thestacking place and unloadingthe same at work site(transportation by anyvehicle).
3Fitting and providing one HTFly stay for 11kV pole usingHT PSC pole includingdigging and back filling pitsin ordinary soil, drawingsufficient length of GI earthleads to the ground forearthing (excluding provisionof earthing).
4Labour charges for loadingHT A type pole from thestacking place and unloadingthe same at work site(transportation by anyvehicle).
5Fitting and erecting one HTA type Single Pole inposition, including fittingcross arm, digging and backfilling pit in ordinary soil (asper standards), drawingsufficient length of GIearthing leads from F clampthrough V cross arm to theground for earthing(excluding provision ofearthing).
6Fitting 5 channel cross arms,AB switch, DO fuse,LA(Ord), HT & LTconnections upto OH lines,etc. on existing DP structure,Fixing distributionbox/provision for one set(3No.) of LT fuses, , drawingsufficient length of GIearthing leads to the groundfor earthing, excludingprovision of earthing &mounting of Transformer on poles.
7Fitting one Additional Vcross arm in existing singlepole including conveyance ofmaterials.
8Drilling hole of various sizeson existing Channel/CrossArm.
9Fitting one additional Fuseunit and giving connectionfrom Transformer to fuse andDistribution box to LT OHline.
10Providing one Earth using GIearth pipe of size 38.1mmdia, 2.5m length includingdigging separate pit(0.45x0.45x2.5m) at aminimum distance of 1.5maway from the pole/structureand maintaining standarddistance between differentearth pipes in ordinary soil &backfilling
11Fitting one Additional2.4m/3m Channel cross arm(100x50x6mm), in existing11kV DP includingconveyance of materials.
12Providing Transformerfencing to a height of 1.8 mabove ground level using MSAngle frames of size ISA50x50x6mm for outer frame,2 runs of 40 x 6 MS flat forhorizondal brasing and grillswith MS rods 8 mm Dia @10cm c/c for verticals,providing gate with lockingarrangements, providing danger board & name board,embeding the legs in cementconcrete 1:2:4, footing ofsize 30cmx30cmx50cm,painting with syntheticenamel paint two coats overone coat of iron primer etccomplete, incl cost oftransportation
13Cleaning and levelling oftransformer yard/RMU,spreading 40 mm brokenstone in yard for a thicknessof 10 cm above bed of 10 cmthick 6 mm broken stone,after constructing a curb wallof height 20cm above groundand 10cm below levelincluding cost of all materialsand charges for conveying,spreading, consolidating etc.
14Dismantling (withoutdamage) one km LT singlephase 2 wire OH lineconductor by dismantlingcross arms, insulators andstacking the conductors inrolls properly.
15Stringing, shackling, fittingcross arms, insulators andbinding, giving jumperconnection etc. using ACSRRabbit for Phase and Neutral,for one km LT single phase 2wire line including cuttingand removing tree brancheswherever necessary andconveyance of all materials(except poles) from stackingplace.
16Calculation for rate arrived =Key no.112 - (key no 169 +(key no 179x3)) = 3274.36 -(481.95+(149.50x3)) =2343.91 Key no 112 - Fitting& erecting one HT PSC polein position incl. fitting crossarm,insulators & back fillingpit,drawing earth leads -3274.36 Key no 169 - Fittingone Addl V x arm - 481.95Key no.179 - Fitting one addlpin insulator with pin -149.50
17Excavation of cable trench ofappropriate size ( normally1.2m deep and 0.35m /0.5mwide for single/double run)in all classes of soil includingbreaking clods, watering,ramming and sectioning ofsoil bank etc. and back fillingthe soil after cable laying andconsolidating the soil inlayers of 75cm (excludinglaying of cable)
18Laying HT XLPE UG cable of sizes beyond 3x185 sq mm and upto and including 3x300 sqmm including conveying cable from Sub Regional Store/stacking place to work site and laying it carefully using cable rollers, taking through stone ware/G.I.pipes at road crossing/culverts/bridges etc. whereever necessary, providing identification tags at 5m intervals, filling the space around the cable with riddled soil and covering the top with bricks, providing cable route markers at 100m intervals, inclusive of cost of all materials (other than cost of GI/HDPE pipe & UG Cable), labour and transport including crane charges excluding excavation and backfilling.
19Doing one cable endtermination on HT XLPE UGcables of sizes beyond 3x185sqmm and upto and including3x300 sq mm using the cablejointing kit supplieddepartmentally after makingfencing,caution board and allother safety measuresincluding charges for cablejointer etc. complete as perthe direction of thedepartmental officers.
20Providing one Earth using GIearth pipe of size 38.1mmdia, 2.5m length includingdigging separate pit(0.45x0.45x2.5m) at standarddistance (1.5m) away fromthe pole/structure in ordinarysoil & backfilling the pit with15cm alternate layer ofcharcoal, salt and sand up to90cm from the bottom.including the cost of 20kgsalt, 25kg charcoal,excluding supply of earthpipe
21Providing one Driven Earthusing GI earth pipe of size38.1mm dia, 2.5m length atminimum distance of 1.5m away from the pole/structureand maintaining standarddistance between differentearth pipes in loose soil.
22Providing one Coil Earthusing No.8 GI-earth wire(50mm dia, 115 turns)including digging separate pit(0.45x0.45x1.5m) at standarddistance away from thepole/structure in ordinary soil& backfilling
23Fitting one set AB switch onexisting DP, givingconnection and drawingsufficient length of GIearthing leads to the groundfor earthing, excludingprovision of earthing.
24Stringing of one km 3 PH11kV line with XLPEInsulated ACSR Raccoon orequivalant (3 conductors)after fitting insulators,binding conductors to pininsulators using suitable tieand anchoring with wedgetype anchoring clampsincluding cutting andremoving tree brancheswherever necessaryexcluding cut point works.
25Transporting LT ABC byhired vehicle to a distance upto 5 km and carring up to 2drum including loading andun loading using crane
26Fitting and providing one HTStay for 11kV pole, includingdigging and back filling pit in ordinary soil
27Fitting and erecting one HTPSC Single Pole in position,including fitting cross arm,digging and back filling pit inordinary soil (as perstandards), drawing sufficientlength of GI earthing leadsfrom F clamp through Vcross arm to the ground forearthing (excluding provisionof earthing).
28Additional rate for providingone disc set, PG clamp etc.complete, on any type of HTpole for making cut point
29Fitting one Additional75x40mm, 1.8m Channelcross arm in existing singlepole including conveyance ofmaterials.
30Fitting and erecting one HTDouble Pole Structure usingPSC pole in positionincluding fitting 2 channelcross arms, digging and backfilling pit in ordinary soil,drawing sufficient length ofGI earthing leads through allcross arms to the ground forearthing (excluding provisionof earthing)
31Fitting one set (3No.) 11kVLA and giving connectionsexcluding earthing
32Transporting poles by hiredvehicle to a distance upto5km and carrying upto 4numbers of poles excludingloading& unloading charges.
33Fitting and erecting one HTDouble Pole Structure usingA type pole in positionincluding fitting 2 No.channel cross arm, diggingand back filling pit inordinary soil, drawingsufficient length of GIearthing leads through allcross arms to the ground forearthing (excluding provisionof earthing).
34Erecting one 100kVATransformer to existing DPand giving connections,including loading fromTMR/SRS/other stackingplace & unloading at site butexcluding cost fortransporting transformer.
35Transporting Transformersby hired vehicle to a distanceupto 5km and carrying upto 2numbers of63/100/160/250kVATransformers / Ring MainUnits excluding loading&unloading charges.
36Dismantling (withoutdamage) one LT PSC/RCCpole after disconnectingstays, strut etc. attachedthereon and stacking thesame
37Dismantling one damagedLT PSC/RCC pole afterdisconnecting stays, strut etc.attached thereon and stackingthe same.
38Dismantling (withoutdamage) one km LT threephase 4 wire OH lineconductor by dismantlingcross arms, insulators andstacking the conductors inrolls properly.
39Dismantling (withoutdamage) one km LTadditional conductor line bydismantling cross arms,insulators and stacking theconductors in rolls properly.
40Stringing, shackling, fittingcross arms, insulators andbinding, giving jumperconnection etc. using ACSRRabbit for Phase and ACSRWeasel for Neutral & StreetMain, for one km LT 3ph 5wire line including cuttingand removing tree brancheswherever necessary andconveyance of all materials(except poles) from stackingplace.
41Disconnecting and loweringdown the single phase WPservice connection with guywire from the OH line andreconnecting the same aftercompleting the line work
42Disconnecting and loweringdown the three phase WPservice connection with guywire from the OH line andreconnecting the same aftercompleting the line work.
43Dismantling one ordinarystreet light/CFL/LED fitting from existing pole and refitting the same on newly erected pole including disconnecting and reconnecting wires
44Dismantling (withoutdamage) one LT PSC/RCCStrut pole including removalof clamps and stacking Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57045175
AUTHORITY Boards / Undertakings / PSU
TENDER VALUE Ref. Documents
LAST DATE 03-09-2026
Authority
Authority Name Kerala State Electricity Board
Work Description Tender for Constructing Ht Line Using Covered Conductor And Installing 100Kva Dtr At Vayyankara Tourism Point At Electrical Section Thengamom Pallickal
Basic Detail
Tender No EE/PMU/PTA/E-TENDER/2026-27/02 DTD .13.08.2026
Bidding Type Tender
Location
City Alappuzha
State Kerala
Key Dates
Publish Date 15 Aug 2026
Submission Date 03 Sep 2026
Open Date 07 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee 1534
EMD 15200
Exemption Not Available
Document List
BOQ_1464571.xls
d9fcca1d-f90f-4e18-aa08-bcd0dbc84681.html
Tender.pdf
Tendernotice_1 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 15, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 03, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 11 days
Sep 07, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 15 days

Tender Documents

Download All (ZIP) ↓
xls

BOQ_1464571.xls

html

d9fcca1d-f90f-4e18-aa08-bcd0dbc84681.html

pdf

Tender.pdf

pdf

Tendernotice_1 (11).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders