Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships; Rrc For Repair/ Maintenance Of Stp Omnipure Make Sewage Treatment Plant Fitted Onboard In Ships; Service Provider - Chemical Clean
Tender Overview
Project Description
Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Onboard In Ships; Rrc For Repair/ Maintenance Of Stp Omnipure Make Sewage Treatment Plant Fitted Onboard In Ships; Service Provider - Chemical Cleaning Of Tank , Degutting & Renewal Per Tank , Recoating Of Tanks With High Grade 3 Part Sigma Paint Scheme , Renewal Of Inspection Cover Joint , Repairs/Renewal Of Site Tubes , Renewal Of Ms Flanges For Tanks On Skid , Cleaning And Painting Of The Plant, System Pipes And Skid Area , Overhauling Of Discharge Valve , Remove/Refit Of Discharge Valve , Overhauling Of Plug Cock Valve , Remove/Refit Of Plug Cock Valve , Overhauling/Repair Of Non-Geared Storm Valves , Remove/Refit Of Non-Geared Storm Valves , Overhauling/Repair Of System Bypass Valves , Remove/Refit Of System Bypass Valves , Renewal Of Pvc Valves , Overhaul Rotary Compressor I.A.W Oem Manual , Overhaul Rotary Compressor Motor I.A.W Oem Manual , Overhaul Obd Pump As Per Oem Manual , Overhaul Obd Pump Motor As Per Oem Manual , Overhaul Macerator Pump As Per Oem Manual , Overhaul Macerator Pump Motor As Per Oem Manual , Overhaul Imo Pump As Per Oem Manual , Overhaul Imo Pump Motor As Per Oem Manual , Repair/Reconditioning Of Book Cell, Renew Cathode And Anode Plates And Prove Standard Operation. , Inspection, Pressure Testing/Leak Testing Per System - Pipe Lines Including Overboard Discharge Lines, Flushing Lines, Imo Lines, Blower & Vent Lines, Gas Indicator Lines And Pvc Lines Per Meter , Renewal Of Defective Pipe Lines Per System - Pipe Lines Including Overboard Discharge Lines, Flushing Lines, Imo Lines, Blower & Vent Lines, Gas Indicator Lines And Pvc Lines Per Meter , Repair/Reconditioning Of Blower With Motor , Repair/Reconditioning Of Air Ejector , Repair/Renewal Of Float Sensors/Level Switches And Functionality Checks , Remote Control Switches In Dchq Pertaining To Stp Plant To Be Made Operational , Overhauling/Functionality Checks Of Electrical Control Panel And Repair Any Defects On Electrical Panel , Repair/Renewal Of Electrical Cables And Accessories Including Earthing , Cleaning / Repairs Of Orifice, Filters And Strainers Per Plant , Repair/Overhaul Of Pressure Reducing Valves Fitted In Firemain For Inflow To The System , Repair/Overhaul Of Solenoid Valves , Repair And Serviceability Checks Of Transformer Unit , Endurance Test And Effluent Test Of S Les Of Stp For Bod And Tss On Completion Of Major Repairs, As Proposed By Ships Staff/Once In A Year , Rewinding Of Macerator, Obd And Blower Motor , Renewal Of Macerator Shaft , Overhaul Of Blower Motor Inclusive Of Non Standard Spares , Visit At Okha , Visit At Porbander , Visit At Kochin , Visit At Karwar
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 17-Aug-2026 | 27-Aug-2026 |
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Chemical cleaning of Tank | Chemical cleaning of Tank |
| 2 | Degutting & Renewal per Tank | Degutting & Renewal per Tank |
| 3 | Recoating of Tanks with high grade 3 part sigma paint scheme | Recoating of Tanks with high grade 3 part sigma paint scheme |
| 4 | Renewal of inspection cover joint | Renewal of inspection cover joint |
| 5 | Repairs/renewal of site tubes | Repairs/renewal of site tubes |
| 6 | Renewal of MS flanges for tanks on skid | Renewal of MS flanges for tanks on skid |
| 7 | Cleaning and painting of the plant, system pipes and skid area | Cleaning and painting of the plant, system pipes and skid area |
| 8 | Overhauling of discharge valve | Overhauling of discharge valve |
| 9 | Remove/Refit of discharge valve | Remove/Refit of discharge valve |
| 10 | Overhauling of plug cock valve | Overhauling of plug cock valve |
| 11 | Remove/Refit of plug cock valve | Remove/Refit of plug cock valve |
| 12 | Overhauling/repair of non-geared storm valves | Overhauling/repair of non-geared storm valves |
| 13 | Remove/Refit of non-geared storm valves | Remove/Refit of non-geared storm valves |
| 14 | Overhauling/repair of system bypass valves | Overhauling/repair of system bypass valves |
| 15 | Remove/Refit of system bypass valves | Remove/Refit of system bypass valves |
| 16 | Renewal of PVC valves | Renewal of PVC valves |
| 17 | Overhaul Rotary Compressor i.a.w OEM manual | Overhaul Rotary Compressor i.a.w OEM manual |
| 18 | Overhaul Rotary Compressor motor i.a.w OEM manual | Overhaul Rotary Compressor motor i.a.w OEM manual |
| 19 | Overhaul OBD pump as per OEM manual | Overhaul OBD pump as per OEM manual |
| 20 | Overhaul OBD pump motor as per OEM manual | Overhaul OBD pump motor as per OEM manual |
| 21 | Overhaul Macerator pump as per OEM manual | Overhaul Macerator pump as per OEM manual |
| 22 | Overhaul Macerator pump motor as per OEM manual | Overhaul Macerator pump motor as per OEM manual |
| 23 | Overhaul IMO pump as per OEM manual | Overhaul IMO pump as per OEM manual |
| 24 | Overhaul IMO pump motor as per OEM manual | Overhaul IMO pump motor as per OEM manual |
| 25 | Repair/reconditioning of Book cell, renew cathode and anode plates and prove standard operation. | Repair/reconditioning of Book cell, renew cathode and anode plates and prove standard operation. |
| 26 | Inspection, pressure testing/leak testing per system - pipe lines including overboard discharge lines, flushing lines, IMO lines, blower & vent lines, gas indicator lines and PVC lines per meter | Inspection, pressure testing/leak testing per system - pipe lines including overboard discharge lines, flushing lines, IMO lines, blower & vent lines, gas indicator lines and PVC lines per meter |
| 27 | Renewal of defective pipe lines per system - pipe lines including overboard discharge lines, flushing lines, IMO lines, blower & vent lines, gas indicator lines and PVC lines per meter | Renewal of defective pipe lines per system - pipe lines including overboard discharge lines, flushing lines, IMO lines, blower & vent lines, gas indicator lines and PVC lines per meter |
| 28 | Repair/reconditioning of Blower with motor | Repair/reconditioning of Blower with motor |
| 29 | Repair/reconditioning of Air Ejector | Repair/reconditioning of Air Ejector |
| 30 | Repair/renewal of float sensors/level switches and functionality checks | Repair/renewal of float sensors/level switches and functionality checks |
| 31 | Remote control switches in DCHQ pertaining to STP plant to be made operational | Remote control switches in DCHQ pertaining to STP plant to be made operational |
| 32 | Overhauling/functionality checks of electrical control panel and repair any defects on electrical panel | Overhauling/functionality checks of electrical control panel and repair any defects on electrical panel |
| 33 | Repair/renewal of electrical cables and accessories including earthing | Repair/renewal of electrical cables and accessories including earthing |
| 34 | Cleaning / repairs of orifice, filters and strainers per plant | Cleaning / repairs of orifice, filters and strainers per plant |
| 35 | Repair/overhaul of pressure reducing valves fitted in firemain for inflow to the system | Repair/overhaul of pressure reducing valves fitted in firemain for inflow to the system |
| 36 | Repair/overhaul of solenoid valves | Repair/overhaul of solenoid valves |
| 37 | Repair and serviceability checks of transformer unit | Repair and serviceability checks of transformer unit |
| 38 | Endurance test and effluent test of samples of STP for BOD And TSS on completion of major repairs, as proposed by ships staff/once in a year | Endurance test and effluent test of samples of STP for BOD And TSS on completion of major repairs, as proposed by ships staff/once in a year |
| 39 | Rewinding of Macerator, OBD and Blower Motor | Rewinding of Macerator, OBD and Blower Motor |
| 40 | Renewal of Macerator Shaft | Renewal of Macerator Shaft |
| 41 | Overhaul of Blower motor inclusive of non Standard Spares | Overhaul of Blower motor inclusive of non Standard Spares |
| 42 | Visit at OKHA | Visit at OKHA |
| 43 | Visit at Porbander | Visit at Porbander |
| 44 | Visit at Kochin | Visit at Kochin |
| 45 | Visit at Karwar | Visit at Karwar |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 7 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 7 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 7 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender