Public Administrative Department Government Departments Closing in 10 days TDR #57040903

Tender For Construction Of H. L. Bridge Over Gobari Drainage Cut At Ch.15.750Km On Salipur - Chhatia Road In The District Of Cuttack For The Year 2026-27

Issued by Government Departments · Khordha, Odisha
Tender Value
19.58 Crore
Estimated cost
Bid Submission
02 Sep 2026
10 days left
EMD
19.58 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Khordha → Odisha
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Construction Of H. L. Bridge Over Gobari Drainage Cut At Ch.15.750Km On Salipur - Chhatia Road In The District Of Cuttack For The Year 2026-27

Corrigendum

Sr No Corrigendum Date Corrigendum Type New Submission Date
1 21-Aug-2026 1st corrigendum of Bid Identification No.CE-BRIDGES-06/ 2026-27 Date 02-Sep-2026

BOQ

Name of Work:- Construction of H. L. Bridge over Gobari Drainage Cut at Ch.15.750km on Salipur – Chhatia road in the District of Cuttack for the year 2026-27
Sl. No. Item Description
1Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, saplings and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned upto a lead of 1000metres including removal and disposal of top organic soil not exceeding 150mm in thickness as per Clause 201 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
2Scarifying and removing the existing bituminous road surface to the required depth as per approved drawing and technical specifications and disposal of scarified materials within all lifts and lead upto 1000mtr. complete in all respect as per Section 900, Clause 305.4.3, 305.8, 305.9.5, 501.8.3.2, 501.8.7.2 and 501.8.8.1 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
3Loosening, leveling and compacting original ground supporting embankment to facilitate placement of 1st layer of emankment, scarified to a depth of 150mm mixed with water at OMC and then compacted by rolling so as to achieve minimum dry density as given in the table 300.2 for embankment construction as per approved drawing andtechnical specifications complete in all respect as per Section 900 and Clause 305, 305.3.4 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
4Construction of embankment with approved materials deposited at site from road-way cutting and excavation fro drain & foundation of other structures graded and compacted to meet requirement of table-300.2 with all lifts and leadsas per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
5Construction of embankment with approved materials obtained from borrow pits with all lifts and lead by mechanical means transporting to side by spreading, grading and compacting to meet requirement as per approved drawing and technical specifications complete in all respect as per Section 900 and clause 305 of MoRT&H Specification for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
6Providing and laying Granular Sub-base with Grading-VI stone screening materials spreading in uniform layer with Motor Grader on prepared surface and compacting with vibratory power roller to achieve the desired density as per Table 400-1 as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 401 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
7Providing,laying, spreading and compacting Wet Mix Macadam using crushed stone aggregates specification including premixing the material with water at OMC in mechanical mix plant carriage of mixed material by tipper to site ,laying in uniform layers with graader in sub-base/base course on well prepared surface and compacting with vibratory roller to achieve the desired density as per approved drawing and technical specifications complete in all respect as per Section 900 and Clause 406 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
8Providing and applying primer coat with slow setting bitumen emulsion on prepared surface of granular base, including clearing road surface and spraying primer @0.60 kg / sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 502 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
9Providing and applying tack coat with rapid setting bitumen emulsion on the prepared bituminous/ granular surface including cleaning with mechanical broom and spraying bitumen emulsion @0.20kg/sqm using mechanical means as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501.5.2 & 503 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
10Providing and laying dense graded bituminous macadam with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.0 to 4.5 per cent by weight of total as per approved drawing and technical specifications complete in all respect as per Section 900, Clause 501, 505 & 508 of MoRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
11Providing and laying bituminous concrete with hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder of 60/70 penetration grade of bitumen, transporting the hot mix to work site, l;aying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per Clause 501,503, 507 & 509 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
12Providing, laying of granular material in shoulder by using moorum of approved quality, watering and compacting with PRR to achieve the required density in OMC complete in all respect as per approved drawing and technical specifications as per Section 900 and Clause 408 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
13Providing and laying 25 mm thick mastic asphalt wearing course with paving grade bitumen meeting the requirements given in Table 500-29, prepared by using mastic cooker and laid to required level and slope after cooking the surface,including providing anti-skid surface with bitumen precoated fine grained hard stone chipping of 13.2 mm nominal size at the rate of 0.005 cum per 10 sqm and an approximate spacing of 10 cm center to center in both direction ,pressed into surface when the temperature of surfaces is not less than 100° C ,protruding 1 mm to 4 mm over mastic surface, all complete as per Clause 515 of MoSRT&H Specifications for Road & Bridge works (Latest Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
14Earth work in excavation in all kinds of soil for road works with hydraulic excavator of 0.9 Cum bucket capacity including cutting and loading in tippers as per drawing and technical specification, including setting out, dressing of section to correct line, level, grade & camber for road work or dressing of sides and bottom for foundation of structures and loading into tippers, transporting to embankment site within all lifts and lead upto 1000mtr. and utilising the surplus earth locally for road work wherever required, backfilling the excavation earth to the extent required etc complete in all respect as per clause 301 & 304 of Specification for road & bridge work of MORT&H (5th Revision) & Direction of Engineer in charge.
15Providing, filling clean sand of approved quality in road work for construction of drainage layer and foundation trenches of structures in uniform layers, watered and rammed/compacted as per approved drawing and technical specifications complete in all respect as per Section 900, 2100 and Clause 401 & 304 of MoRT&H specifications for Road & Bridge works (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
16Providing and laying RCC M-35 grade Bored cast-In-situ pile of 1.200m dia excluding reinforcement complete including removal of excavated earth with all leads & lifts up to 1000mtr including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1100 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
17Supplying, Fitting, Fixing, Placing and driving in position Steel Liner of 6 to 10mm thick for Pile shaft including cost, conveyance all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Section 1100 & 1900 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
18Providing and laying Plain cement concrete of grade M-15 in foundation of CD works etc without formwork using 40mm to 10mm size crushed stone aggregates etc complete as per drawing and technical specification using High Strength approved quality Cement and coarse granite aggregate conforming to Table 1000-1 with formwork as per Section 900,1000,1500, 1700, 2100, 2200 of specifications for Road and Bridge works of Ministry of Road Transport & Highways (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.
19P.C.C. M-20 grade in Toe Wall with formwork using 40 to 10mm size crushed stone aggregates mixed by concrete mixer, laying with all leads and lifts & compacting as per approved Drawing & Technical Specifications and Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
20RCC M-25 grade in Foundation of retaining wall with formwork using 20 to 10mm size crushed stone aggregates mixed by concrete mixer, laying with all leads and lifts & compacting as per approved Drawing & Technical Specifications and Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.
21RCC M-25 grade in Substructure of Culvert & retaining wall with formwork using 20 to 10mm size crushed stone aggregates mixed by concrete mixer, laying with all leads and lifts & compacting as per approved Drawing & Technical Specifications and Section - 1700 & 2100 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all materials, labour, T&P, royalty etc complete in all respect and as per direction of the Engineer-in-charge.
22RCC M-35 grade in Pile Cap for abutment and pier with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1100, 1500 & 1700 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
23RCC M-30 grade for abutment and pier shaft with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1700 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
24RCC M-30 grade in Substructure Abutment Cap & corbel with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1700 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
25Providing and laying RCC M-30 grade for Dirt wall with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1700 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
26Providing and laying RCC M-40 grade for Pedestal with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying with all leads and lifts & compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1700 & 2200 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
27Supplying, Fitting, Fixing & Placing in position of Elastomeric Bearing including cost, conveyance of bearing & labour for fitting fixing etc complete as per approved Drawing & Technical Specifications and clause - 2005 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
28RCC Grade M-30 Grade in girders including cost of all materials, labour charges for machineries, T&P , centering & shuttering , charges towards casting bed, roads for lifting and launching of the girders including charges towards providing cranes, vehicle with trailer for lifting and to support the errection of girder for launching and placement at the required height and position including all chargers for arrangement for movement of cranes, trailers of required nos and capacity complete but excluding cost and labour for M.S reinforcement, HT steel wire/ strand, sheating , Bearing plate, Tube 'unit', wedges etc. accesories, charges towards stressing and grouting, hire charges of Jack and other equimpment required for stressing & grouting & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
29RCC M-30 Grade in Deck Slab and Cross Girder/diaphragm including cost of all materials, labour charges for machineries, T&P charges for suspended type staging/ centering & shuttering, supported on girders with M.S bracket arrangement for cantilever portion including charges for all materials and labour for centering shuttering etc. complete & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
30RCC M-30 grade in Approach slab including steel of CD work with formwork using 20 to 10mm size crushed stone aggregates mixed by Batching Plant, laying in layers and compacting including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1600, 2300 & Clause- 2704 of MoRT&H Specifications for Road & Bridge works (5th Revision) and as per direction of Engineer-in-Charge.
31Providing and laying of Strip seal Expansion joint consisting of steel armoured nosing at two edges of the joint gap suitably anchored to the deck concrete and a preformed chloroprene elastomer or closed cell foam joint sealer compressed and fixed into the joint gap with special adhesive binder to cater for a horizontal movement upto 40 mm and vertical movement of 3 mm. including cost & conveyance of all materials, labour, T&P, royalty etc complete & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
32Providing & fixing in position RCC Crash barrier monolithic with slab M-40 grade of above slab including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Section 1500, 1600, 2300 & Clause- 2703 of MoRT&H Specifications for Road & Bridge works (5th Revision) & including cost of all labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
33Providing and fixing drainage spouts in deck slab with 100 mm diameter G.I pipe for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900 & Clause 2705 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
34Supplying, cutting, bending, binding, straightening, placing HYSD bars confirming to grade IS:1786-(Fe-500) for steel reinforcement works for finished item of work as per approved drawing and technical specifications complete in all respect as per section 900, 1000 & 1600 of MoRT&H specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
35Painting on Finished wall surface with two coats of Weather Coat Paint and one coat of Primer of approved shade or finished item of work including cost of Paints & cost of all labour etc complete as per Technical Specifications and Clause-803 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost of paint, labour, T&P all complete and as per direction of Engineer-in-Charge.
36Grouting aprons and revetments of 23cm deep with cement concrete (1:4:8) using 2.5cm size hard crusher broken coarse aggregates as per approved Drawing & Technical Specifications for finished item of work including cost, conveyance, royality & other taxes of materials, cost of labour, T&P etc complete as per the direction of the Engineer-in-charge.
37Gravel backing to appron and revetments including cost, conveyance, royality of all materials & cost of all labour etc complete as per approved Drawing & Technical Specifications and Clause - 2504 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
38Rough stone dry packing in aprons and revetments and stone pitching in slopes and boulder approns etc with hard granite stone of size 30 cm and above as per approved drawing and technical specifications complete in all respect as per Section 900, 1000 and 2500 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
39Providing weep holes in plain / RCC abutment, wing wall, retaining wall, return wall, toe wall and RCC drain etc with 100mm dia A.C. pipe, extending through the full width of slope of 1V : 20H towards the drawing face as per approved drawing and technical specifications complete in all respect as per Section 2200 & Clause 2706 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
40Providing and laying of filter media using 45mm size crushed hard granite stone aggregates to the required thickness with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall and return wall of CD works to the full height compacted to a firm condition as per drawing and technical specifications complete in all respect satisfying the requirements laid down in Clause 2504.2.2 and Section 900 of MoRT&H Specifications for Road & Bridge works (5th Revision) including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
41Providing and fixing of retro-reflectorised cautionary, mandatory and informatory sign as per IRC:67 made of Class-B Type-IV recto reflective sheeting fixed over 2mm thick alumunium sheeting vide Clause No. 801.3, 3mm/4mm thick alumunium composite material sheet depending on the size of sign fixed over back support frame of min 25x25x3 mm angle mounted on a mild steel circular pipe 65 NB, 3.2mm thickness firmly fixed to the ground by means of properly designed foundation with M-25 grade cement concrete 45cmx45cm x 60 cm, 60cm below ground level as per approved drawing. The sign shall be maintanined as per Section 12 of IRC-67 of MoRT&H specification for road & bridge works (5th Revision) and as per direction of Engineer-in-Charge.
4290 cm Equilateral traingle
4360 cm Circular
4480 cm x 60 cm rectangular
4590 cm high octagon
46Providing and erecting direction and place identification retro-reflectorised sign as per IRC:67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area not exceeding 0.9 sqm supported on a mild steel single angle iron post 75 x 75 x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 x 45 x 60 cm, 60 cm below ground level as per approved drawingAdvance direction/Destination/Place identification signs (1800x1200 mm) (above 0.90 sqm)
47Providing and laying road marking with hot applied thermoplastic compound 2.5mm thick including reflectorising glass beads@250gms per sqm area, thickness of 2.5mm is exclusive of surface applied glass beads as per IRC:35.The finished surface to be level, uniform and free from streaks and holes etc. for finished item of work as per technical specification complete in all respect as per Section 900 and Clause 803 of MoRT&H specification for road and bridge work (5th Revision) & including cost & conveyance of all materials, labour, T&P, royalty etc complete and as per direction of Engineer-in-Charge.
48Providing & erecting a \\"W\\" metal beam crash barrier comprising of 3mm thick corrugated steel / shaeet metal beam rail, 70cm above road/ ground level fixed on ISMC series channel vertical post 150mm x 75mm x 5mm spaced 2m centre to centre, 1.8m high, 1.1m below ground / road level, all steel part & filments to be galvanised by hot dip process, all fittings to conform to IS:1367 and IS:1364, metal beam rail to be fixedon the vertical post with a spacer of channel section 150mm x 75mm x 5mm, 330mm long complete as per clause-811 of MoRT&H Specifications for Road & Bridge works (5th Revision).
49Providing and fixing of bi-directional retro reflective raised pavement markers of approved colour, quality & make confonning I to ASTM D-4280 made from injection moulded high impact polymer including cleaning, preparation of surface and fixing at position with approved quality adhesives including cost of all materials, labour, transportation, taxes, duties, sundries, T &P etc. complete. Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57040903
AUTHORITY Government Departments
TENDER VALUE 19.58 Crore
LAST DATE 02-09-2026
Authority
Authority Name Civil Division
Work Description Tender for Construction Of H. L. Bridge Over Gobari Drainage Cut At Ch.15.750Km On Salipur - Chhatia Road In The District Of Cuttack For The Year 2026-27
Basic Detail
Tender No CE-BRIDGES-06/ 2026-27
Bidding Type Tender
Location
City Khordha
State Odisha
Key Dates
Publish Date 21 Aug 2026
Submission Date 02 Sep 2026
Open Date 03 Sep 2026
Finance
Tender Value 19.58 Crore
Tender Fee 10000
EMD 19.58 Lakhs
Exemption Available
Document List
b4b7a345-d80c-4199-b845-ec92f701d25b.html
BOQ_604831.xls
DTCN_GOBARI.pdf
Tendernotice_1 (11).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 21, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 02, 2026
18:00 IST

Corrigendum-1 Issued

Clarifications on tender conditions and amendments issued.

Upcoming · 10 days
Sep 02, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Sep 03, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 11 days

Tender Documents

Download All (ZIP) ↓
html

b4b7a345-d80c-4199-b845-ec92f701d25b.html

xls

BOQ_604831.xls

pdf

DTCN_GOBARI.pdf

pdf

Tendernotice_1 (11).pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders