Tender For Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance For 25 Years (Unless Extended By Both The Parties On Mutual Agreement) From Cod Of Grid Connected Solar Power Plants Through Resco Mode, Its Associated 1
Tender Overview
Project Description
Tender for Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance For 25 Years (Unless Extended By Both The Parties On Mutual Agreement) From Cod Of Grid Connected Solar Power Plants Through Resco Mode, Its Associated 11 Kv Line To Connect The Plant With Various 33/11 Kv Sub-Stations And Rms Of Solar Power Plants For Solarization Of Group Of Connections Ofbeneficiary Departments (Cumulative Load Of Group Up To 1 Mw) Under Virtual Net Metering Arrangement In Jdvvnl.
BOQ
| Sl. No. | Item Description |
| 1 | Item Wise BoQ 15.0 BoQ_Ver3.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: General Manager-III, RRECL, E-166, Yudhisthir Marg, C-Scheme, Jaipur Name of Work: Design, Survey, Supply, Installation, Testing, Commissioning, Operation & Maintenance for 25 years (unless extended by both the parties on mutual agreement) from COD of grid connected Solar Power Plants through RESCO mode, its associated 11 kV line to connect the plant with various 33/11 kV sub-stations and RMS of Solar Power Plants for solarization of group of connections ofBeneficiary Departments (Cumulative load of group up to 1 MW) under Virtual Net Metering arrangement in JdVVNL. Contract No: RREC/TN-09/2026-27 Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE(DOMESTIC TENDERS - RATES ARE TO GIVEN IN RUPEES (INR) ONLY)(This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevant columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only ) NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # Sl.No. Name of Substation Item Code / Make Plant Capacity (in MW) Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency All inclusive quoted tariff (in Rs. Upto three decimal) Excise Duty Amount in INR Rs. P GST Amount in INR Rs. P Freight Charges ( Unloading & Stacking) inRs. P Any Other Taxes inRs. P Any Other Duties/Levies inRs. P IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category Name of Circle Division Name Substation Code Solar Power Plant No. TOTAL AMOUNT Without Taxescol (13) = (4) x (7) inRs. P TOTAL AMOUNT With Taxescol (14) = sum (8) to (13) inRs. P TOTAL AMOUNT In Words |
| 2 | Sub-Station Name |
| 3 | JASOL FANTA |
| 4 | Asotra |
| 5 | Bithuja |
| 6 | Kanana |
| 7 | kitnod |
| 8 | KHANJI KA TALA |
| 9 | Gudanaal |
| 10 | Kathari |
| 11 | Mokalsar |
| 12 | JAALI KHEDA |
| 13 | DEEPLA |
| 14 | MEHLOO |
| 15 | Hariyali |
| 16 | Sujo ka niwan |
| 17 | MANGLE KI BERI |
| 18 | DHEERJI KI DHANI |
| 19 | HANUMAN PURA |
| 20 | BISASAR |
| 21 | CHICHRASAR |
| 22 | GULE KI BERI |
| 23 | JANPALIYA |
| 24 | MITHEA KA TALA |
| 25 | RABASAR |
| 26 | SHREE RAMWALA |
| 27 | KOLIYANA |
| 28 | NEDI NADI |
| 29 | RANASR-KALLAN |
| 30 | SACHI BERI |
| 31 | SUDA BERI |
| 32 | MARUDI |
| 33 | NIMBRI |
| 34 | SUJAN NAGAR |
| 35 | BHOJUSAR |
| 36 | Ramsar I |
| 37 | KUCHOR AGUNI-II |
| 38 | Belasar-II |
| 39 | JHAJHU-II |
| 40 | NAYA GAON |
| 41 | SANKHLA FANTA |
| 42 | BAMBLOO |
| 43 | CHAWDAN BASTI |
| 44 | Binjhasar - II |
| 45 | LAKHASAR |
| 46 | LODERA |
| 47 | TOLIYASHAR |
| 48 | KITASAR |
| 49 | Lalamdesar Chota |
| 50 | DHANKAL NAGAR |
| 51 | POONIYA COLONY |
| 52 | MIKHALA |
| 53 | Loonsagar |
| 54 | Dhaba |
| 55 | SUREWALA |
| 56 | SRINAGAR |
| 57 | FATEHGARH - 31 SSW |
| 58 | DABLIBAS PEMA |
| 59 | JORKIYAN |
| 60 | Mahiyo Ki Dhani |
| 61 | MIRJAWALI MAIR |
| 62 | T.s. Ki Dhani |
| 63 | RAMPURA |
| 64 | 18 NGC (Kenchiya) |
| 65 | RATANADESHAR/DUDALI |
| 66 | SIRASAR |
| 67 | GORKHANA |
| 68 | Nimla |
| 69 | Kulchander |
| 70 | SHERGARH |
| 71 | 3 TLW |
| 72 | THIRAJWAL |
| 73 | BARAT K GAON |
| 74 | BABER MARGA (AIR PORT) |
| 75 | SHILPGRAM |
| 76 | BADORA GAON |
| 77 | Bhagu ka Gaon |
| 78 | DHAWRA |
| 79 | DALA RAM KD KOTRI |
| 80 | KUCHHRI |
| 81 | CHHAYAN-I |
| 82 | CHHAYAN-II |
| 83 | NACHANA2 |
| 84 | NACHANA1 |
| 85 | SATYAYA |
| 86 | BHAREWALA |
| 87 | Mandawla |
| 88 | Jodwas |
| 89 | Devda |
| 90 | Mokani |
| 91 | Jeran |
| 92 | NEELKANTH |
| 93 | JORWADA |
| 94 | POONASA |
| 95 | REWAT |
| 96 | BAGRA |
| 97 | Raipuriya |
| 98 | Guda Balotan |
| 99 | Harji |
| 100 | Kawrada |
| 101 | SANKHWALI |
| 102 | NOSRA |
| 103 | Arnay |
| 104 | Bhadarna |
| 105 | Jailatra |
| 106 | Jodhawas |
| 107 | Karawadi |
| 108 | SEWADA |
| 109 | Ajodar |
| 110 | Dantwada |
| 111 | Dhamseen |
| 112 | BELWA |
| 113 | HEERADESHAR |
| 114 | RAMPURA |
| 115 | BINJWADIYA |
| 116 | DAIZER |
| 117 | KAPARDA |
| 118 | MATHANIA |
| 119 | RAMPURA |
| 120 | BAGRI KALALIYA |
| 121 | BALUNDA |
| 122 | CHANG |
| 123 | SUMEL |
| 124 | KUSHALPURA |
| 125 | HARIPUR |
| 126 | KANTALIYA |
| 127 | SEHWAJ |
| 128 | BAORI KALLA |
| 129 | VISHAN PURA |
| 130 | NITODA |
| 131 | BANAS |
| 132 | Magriwada |
| 133 | Mandar |
| 134 | Sorda |
| 135 | GANDHI NAGAR (P.H. ABU-ROAD) |
| 136 | ROHIDA |
| 137 | Netewala |
| 138 | RAISINGNAGAR |
| 139 | BADA MANDIR |
| 140 | Dhaani talniya |
| 141 | CHAK 5 O |
| 142 | CHAK 13 Z |
| 143 | 8 SHPD Total in Figures 0.0 189569126.0 INR Eighteen Crore Ninety Five Lakh Sixty Nine Thousand One Hundred & Twenty Six Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Eighteen Crore Ninety Five Lakh Sixty Nine Thousand One Hundred & Twenty Six Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 20 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender