Tender For Repair/ Maintenance Of Earthing System And Connected Maintenance Works Of Lt Ug Cable And Allied Works In Cg Area Installation Of Age E/M Under Ge Haddo, Sri Vijaya Puram
Tender Value
37 Lakhs
Estimated cost
Bid Submission
03 Sep 2026
19 days left
EMD
74000
Bank guarantee accepted
Document Fee
500
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
South Andamans → Andaman And Nicobar Islands
EMD Exemption
Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Repair/ Maintenance Of Earthing System And Connected Maintenance Works Of Lt Ug Cable And Allied Works In Cg Area Installation Of Age E/M Under Ge Haddo, Sri Vijaya Puram
BOQ
| Sl. No. | Item Description |
| 1 | Excavation in trenches, n exc 1.5 m wide and n exc 1.5 m in depth, laying of cable in trenches etc and getting out in hard / dense soil complete all as specified and directed. |
| 2 | Excavation in trenches not exc. 1.5 m wide and not exc. 1.5 in depth for foundation of poles, stay assembly and laying of U/G cables etc. and getting out in disintegrated soil /road cutting/bitumin road /PCC complete all as specified and directed. |
| 3 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm in soils complete all as specified and directed. |
| 4 | Removing excavated material (soils) n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. |
| 5 | M&L cement concrete 1:2:4 type B1 using 20mm graded aggregate in width for making good road including including rafts, footings, foundation beams plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concretecomplete all as specified and directed. |
| 6 | Taking down/ dismantling carefully feeder panel by disconecting all connected cables and reconnecting same cables with proposed feeder panels complete all as specified and directed. |
| 7 | M&L required for disconnecting all connections and shifting of LT feeder panel from one location to another location including provn of foundation as directed and installing, connecting all LT cables including earthing connections and testing all as specified and directed. |
| 8 | Taking down UNSV cable from trench/wall/duct complete all as specified and directed. |
| 9 | S&F heat shrinkable sleeves suitable for 35 Sqmm to 95 Sqmm LT UG cable, 415V grade including disconnecting LT UG cable from Transformer/LT Panel/Feeder Pillar Box/Cope boxes and re-connection after completion complete all as specified and directed. |
| 10 | S&F heat shrinkable sleeves suitable for 120 Sqmm to 240 Sqmm LT UG cable, 415V grade including disconnecting LT UG cable from Transformer/LT Panel/Feeder Pillar Box/Cope boxes and re-connection after completion complete all as specified and directed. |
| 11 | S&F heat shrinkable sleeves suitable for 300 Sqmm to 500 Sqmm LT UG cable, 415V grade including disconnecting LT UG cable from Transformer/LT Panel/Feeder Pillar Box/Cope boxes and re-connection after completion complete all as specified and directed. |
| 12 | Material & Labour for cable fault detection at various locations by all T & P , Equipments for LT CABLE XLPE aluminium conductor from feeder panel to feeder panel including testing and commissioning complete all as specified and directed |
| 13 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size of 35sqmm X 3.5 Core to 50sqmm X 3.5 Core all as specified and directed. |
| 14 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size 70sqmm X 3.5 Core to 120sqmm X 3.5 Core all as specified and directed. |
| 15 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size 150 sqmm X 3.5 Core to 185 sqmm X 3.5 Core all as specified and directed. |
| 16 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size 240 sqmm X 3.5 Core to 300 sqmm X 3.5 core all as specified and directed. |
| 17 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size 400 sqmm X 3.5 Core to 500 sqmm X 3.5 Core all as specified and directed. Please Enable Macros to View BoQ information |
| 18 | Material & Labour for straight througth cable jointing kit , in repairs for LT CABLE XLPE aluminium conductor including testing and commissioning complete for the size 400 sqmm X 3.5 Core to 500 sqmm X 3.5 Core all as specified and directed. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedSep 03, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 19 daysSep 05, 2026
Bid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 21 daysTender Documents
Download All (ZIP) ↓
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender