Defence Government Departments Closing in 18 days TDR #57017327

Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For External Underwater Hull Surface Preparation And Paint Renewal Of In Vessels; Any Other Suitable Brand; No; Buyer Premises - Anode Masking.Masking Of All Iccp Anodes A

Issued by Government Departments · Visakhapatnam, Andhra Pradesh
Tender Value
Ref. Documents
Estimated cost
Bid Submission
04 Sep 2026
18 days left
EMD
6.65 Lakhs
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Visakhapatnam → Andhra Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For External Underwater Hull Surface Preparation And Paint Renewal Of In Vessels; Any Other Suitable Brand; No; Buyer Premises - Anode Masking.Masking Of All Iccp Anodes And Reference Electrodes Using Hard Covers. Masking Is Required To Be Water / Dust Proof And Should Be Able To Withstand A Pressure Of 30000 Psi. It Has To Be Maintained Throughout The Drydock Period. , Jet Washing.High Pressure Jet Washing Of Outer Water Hull At 3000 Psi For Removal Of Marine Growth And Other Contaminants On Hull , Surface Preparation On Under Water Hull – Sweep Hydro Jet Blasting.Sweep Hydro Jet Blasting For Removal Of Selective Coats. , Surface Preparation On Under Water Hull – Sweep Grit Blasting.Surface Preparation Of C I Grit (Using Acci Grit Gr(17-24)On Outer Hull Area By Blasting To Sa 2.5 Std Cleaning Of Used Grit Material Should Be Undertaken In Such A Way So As To Avoid Particle Dispersion In Air. , Cleanship Of Work Area.Disposal Of Hazardous Paint Remnants And Effluent Generated During Blasting To Suitable Treatment Plants Outside Nd(V) Premises Post Treatment As Per Govt Pollution Norms All Remnants Generated During A Docking Period Is To Be Cleared Prior Undocking By Single Truck Load Of Requisite Capacity (Min. 8T). , Disking.Disking On Outer Water Hull Area Using 3Mm Paper To Remove Selective Coats , Paint Application .Paint Application Of Each Coat Of Primer, Anti-Corrosive, Tie Coat And Antifouling Including Draft Marking And Boot Top Marking Post Sweep Hydro Washing Of Hull, As Required. Application To Be Undertaken By Airless Spraying Machine Or Roller Brushes (As Indicated By User Department) For Achieving Dft As Specified In Ncd 1481 Or Relevant Policy Letters Or As Specified By User Department. Wft And Dft Readings To Be Recorded During And Post Curing Respectively For Each Coat , Process Monitoring And Report Submission. A Qualified Supervisor/ Inspector Is To Be Appointed For Process Monitoring And Daily Work Report Submission. Wft Readings Are To Be Taken During Painting Application. Post Curing, Dft Of The Same Area Is To Be Checked To Avoid Under/Over Coating. Dft Mapping Of External Underwater Hull Has To Be Undertaken Post Completion Of Work. The Same Has To Be Undertaken By Dividing The External Uw Hull Area Into Continuous Grids Of 1 Sqm, With Dft Being Measured At Each Corner And Center Of Individual Grids. The Average Value Of Above Five Readings Will Be Considered As The Final Dft Of That Region. In Addition To The Log Books Submitted By The Firm, It Is Required That The Daily Work Progress Be Recorded As Per The Format Specified By The User.

BOQ

Sl. No. Item TitleItem Description
1Anode Masking.Masking of all ICCP anodes and reference Electrodes using hard covers. Masking is required to be water / dust proof and should be able to withstand a pressure of 30000 PSI. It has to be maintained throughout the drydock period.Anode Masking.Masking of all ICCP anodes and reference Electrodes using hard covers. Masking is required to be water / dust proof and should be able to withstand a pressure of 30000 PSI. It has to be maintained throughout the drydock period.
2Jet washing.High Pressure Jet washing of outer water hull at 3000 PSI for removal of marine growth and other contaminants on HullJet washing.High Pressure Jet washing of outer water hull at 3000 PSI for removal of marine growth and other contaminants on Hull
3Surface Preparation on under water Hull – Sweep Hydro Jet Blasting.Sweep Hydro Jet blasting for removal of selective coats.Surface Preparation on under water Hull – Sweep Hydro Jet Blasting.Sweep Hydro Jet blasting for removal of selective coats.
4Surface Preparation on under water Hull – Sweep Grit Blasting.Surface Preparation of C I Grit (Using ACCI Grit GR(17-24)on Outer Hull area by Blasting to SA 2.5 Std cleaning of used Grit material should be undertaken in such a way so as to avoid particle dispersion in Air.Surface Preparation on under water Hull – Sweep Grit Blasting.Surface Preparation of C I Grit (Using ACCI Grit GR(17-24)on Outer Hull area by Blasting to SA 2.5 Std cleaning of used Grit material should be undertaken in such a way so as to avoid particle dispersion in Air.
5Cleanship of Work Area.Disposal of Hazardous paint remnants and effluent generated during blasting to suitable treatment plants outside ND(V) premises post treatment as per Govt Pollution Norms all Remnants Generated during a docking period is to be cleared prior undocking by single truck load of requisite capacity (min. 8T).Cleanship of Work Area.Disposal of Hazardous paint remnants and effluent generated during blasting to suitable treatment plants outside ND(V) premises post treatment as per Govt Pollution Norms all Remnants Generated during a docking period is to be cleared prior undocking by single truck load of requisite capacity (min. 8T).
6Disking.Disking on outer water hull area using 3mm paper to remove selective coatsDisking.Disking on outer water hull area using 3mm paper to remove selective coats
7Paint Application .Paint application of each coat of primer, anti-corrosive, tie coat and antifouling including draft marking and boot top marking post sweep hydro washing of hull, as required. Application to be undertaken by airless spraying machine or roller brushes (as indicated by user department) for achieving DFT as specified in NCD 1481 or relevant Policy letters or as specified by user department. WFT and DFT readings to be recorded during and post curing respectively for each coatPaint Application .Paint application of each coat of primer, anti-corrosive, tie coat and antifouling including draft marking and boot top marking post sweep hydro washing of hull, as required. Application to be undertaken by airless spraying machine or roller brushes (as indicated by user department) for achieving DFT as specified in NCD 1481 or relevant Policy letters or as specified by user department. WFT and DFT readings to be recorded during and post curing respectively for each coat
8Process monitoring and Report Submission. A qualified supervisor/ Inspector is to be appointed for Process monitoring and daily work report submission. WFT readings are to be taken during painting application. Post curing, DFT of the same area is to be checked to avoid under/over coating. DFT mapping of external underwater hull has to be undertaken post completion of work. The same has to be undertaken by dividing the external UW hull area into continuous grids of 1 sqm, with DFT being measured at each corner and center of individual grids. The average value of above five readings will be considered as the final DFT of that region. In addition to the log books submitted by the firm, it is required that the daily work progress be recorded as per the format specified by the user.Process monitoring and Report Submission. A qualified supervisor/ Inspector is to be appointed for Process monitoring and daily work report submission. WFT readings are to be taken during painting application. Post curing, DFT of the same area is to be checked to avoid under/over coating. DFT mapping of external underwater hull has to be undertaken post completion of work. The same has to be undertaken by dividing the external UW hull area into continuous grids of 1 sqm, with DFT being measured at each corner and center of individual grids. The average value of above five readings will be considered as the final DFT of that region. In addition to the log books submitted by the firm, it is required that the daily work progress be recorded as per the format specified by the user.

AI Tender Summary

OUR REF NO 57017327
AUTHORITY Government Departments
TENDER VALUE Ref. Documents
LAST DATE 04-09-2026
Authority
Authority Name Indian Navy
Work Description Bids Are invited for Repair And Overhauling Service - Concluding Rate Contract For External Underwater Hull Surface Preparation And Paint Renewal Of In Vessels; Any Other Suitable Brand; No; Buyer Premises - Anode Masking.Masking Of All Iccp Anodes And Reference Electrodes Using Hard Covers. Masking Is Required To Be Water / Dust Proof And Should Be Able To Withstand A Pressure Of 30000 Psi. It Has To Be Maintained Throughout The Drydock Period. , Jet Washing.High Pressure Jet Washing Of Outer Water Hull At 3000 Psi For Removal Of Marine Growth And Other Contaminants On Hull , Surface Preparation On Under Water Hull – Sweep Hydro Jet Blasting.Sweep Hydro Jet Blasting For Removal Of Selective Coats. , Surface Preparation On Under Water Hull – Sweep Grit Blasting.Surface Preparation Of C I Grit (Using Acci Grit Gr(17-24)On Outer Hull Area By Blasting To Sa 2.5 Std Cleaning Of Used Grit Material Should Be Undertaken In Such A Way So As To Avoid Particle Dispersion In Air. , Cleanship Of Work Area.Disposal Of Hazardous Paint Remnants And Effluent Generated During Blasting To Suitable Treatment Plants Outside Nd(V) Premises Post Treatment As Per Govt Pollution Norms All Remnants Generated During A Docking Period Is To Be Cleared Prior Undocking By Single Truck Load Of Requisite Capacity (Min. 8T). , Disking.Disking On Outer Water Hull Area Using 3Mm Paper To Remove Selective Coats , Paint Application .Paint Application Of Each Coat Of Primer, Anti-Corrosive, Tie Coat And Antifouling Including Draft Marking And Boot Top Marking Post Sweep Hydro Washing Of Hull, As Required. Application To Be Undertaken By Airless Spraying Machine Or Roller Brushes (As Indicated By User Department) For Achieving Dft As Specified In Ncd 1481 Or Relevant Policy Letters Or As Specified By User Department. Wft And Dft Readings To Be Recorded During And Post Curing Respectively For Each Coat , Process Monitoring And Report Submission. A Qualified Supervisor/ Inspector Is To Be Appointed For Process Monitoring And Daily Work Report Submission. Wft Readings Are To Be Taken During Painting Application. Post Curing, Dft Of The Same Area Is To Be Checked To Avoid Under/Over Coating. Dft Mapping Of External Underwater Hull Has To Be Undertaken Post Completion Of Work. The Same Has To Be Undertaken By Dividing The External Uw Hull Area Into Continuous Grids Of 1 Sqm, With Dft Being Measured At Each Corner And Center Of Individual Grids. The Average Value Of Above Five Readings Will Be Considered As The Final Dft Of That Region. In Addition To The Log Books Submitted By The Firm, It Is Required That The Daily Work Progress Be Recorded As Per The Format Specified By The User.
Basic Detail
Tender No GEM/2026/B/7869452
Bidding Type Tender
Location
City Visakhapatnam
State Andhra Pradesh
Key Dates
Publish Date 14 Aug 2026
Submission Date 04 Sep 2026
Open Date 04 Sep 2026
Finance
Tender Value Ref. Documents
Tender Fee Ref. Documents
EMD 6.65 Lakhs
Exemption Not Available
Document List
ef742e70-6986-4952-94d3-48a66d567803.pdf
1785750664.xlsx
1786699470.pdf
1786699473.pdf
1786699477.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 04, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 18 days
Sep 04, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 18 days

Tender Documents

Download All (ZIP) ↓
pdf

ef742e70-6986-4952-94d3-48a66d567803.pdf

xlsx

1785750664.xlsx

pdf

1786699470.pdf

pdf

1786699473.pdf

pdf

1786699477.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders