Tender For 1. Manpower For Transportation, Laying And Fitting Of Ms Pipeline (Dia, 150Mm) Of Length 900 Meter From 32L To Surface Filter Plant For 32L Pumping Station In Dhemomain Incline Colliery Under Sodepur Area. 2. Manpower For Installation Of P
Tender Overview
Project Description
Tender for 1. Manpower For Transportation, Laying And Fitting Of Ms Pipeline (Dia, 150Mm) Of Length 900 Meter From 32L To Surface Filter Plant For 32L Pumping Station In Dhemomain Incline Colliery Under Sodepur Area. 2. Manpower For Installation Of Pump-Motor Set With All Electricals At 32L Pumping Station In Dhemomain Incline Colliery Under Sodepur Area. 3. Manpower For Dismantling At 76L/Od. Loading, Transportation And Installation Of Direct Haulage At 76L/11D In Dhemomain Incline Colliery Under Sodepur Area. 4. Manpower For Loading, Transporttion And Installation Of Endless Haulage At 76L/3D In Dhemomain Incline Colliery Under Sodepur Area.
BOQ
| Sl. No. | Item Description |
| 1 | Items Description |
| 2 | 1. Manpower for Transportation, laying and fitting of MS pipeline (Dia, 150mm) of length 900 meter from 32L to surface filter plant for 32L pumping station in Dhemomain Incline Colliery under Sodepur Area. |
| 3 | Loading, and transportation of 6\\" MS pipe (900meter) 6(Un-skilled) heads per shift X 7shifts= 42Heads & 7 (Semi-Skilled) heads. |
| 4 | Laying of 6\\" MS pipe (900meter) 6(Un-skilled) heads per shift X 5shifts= 30Heads |
| 5 | Flange fitting in all pipes 4(Un-skilled) heads per shift X 5shifts= 20Heads . |
| 6 | Fitting of complete pipeline 4(Un-skilled) heads per shift X 8shifts= 32Heads & 16 (Semi-Skilled) heads. |
| 7 | Overhead cost/Profit (10%) |
| 8 | 2. Manpower for installation of pump-motor set with all electricals at 32L pumping station in Dhemomain Incline Colliery under Sodepur Area. |
| 9 | Loading of pump, motor, starter, baseplate, switch, cable etc.8(Un-skilled) heads per shift X 2shifts= 16Heads & 2 (Semi-Skilled) heads. |
| 10 | Transportation and unloading of pump, motor, starter, baseplate, switch, cable etc. at place.8(Un-skilled) heads per shift X 3shifts= 24 Heads & 3 (Semi-Skilled) heads. |
| 11 | Transportation and laying of power cable8(Un-skilled) heads per shift X 1shifts= 08Heads & 1 (Semi-Skilled) heads. |
| 12 | Installation of pump motor set at proper site 8(Un-skilled) heads per shift X 1shifts= 08Heads & 1 (Semi-Skilled) heads. |
| 13 | Fitting of suction pipe and foot valve8(Un-skilled) heads per shift X 1shifts= 08Heads & 1 (Semi-Skilled) heads. |
| 14 | Overhead cost/Profit (10%) |
| 15 | 3. Manpower for dismantling at 76L/OD. loading, transportation and installation of Direct Haulage at 76L/11D in Dhemomain Incline Colliery under Sodepur Area. |
| 16 | Dismantling of Haulage Set .(Required manpower unskilled-6 Heads and semi Skilled-1 Heads) |
| 17 | Loading of haulage drum, motor, baseplate, starter, lighting transformer, switch, cable and other accessories.(Required manpower unskilled-12 Heads and semi Skilled-2 Heads) |
| 18 | Transportation of all materials (Required manpower unskilled-18 Heads and semi Skilled-3 Heads) |
| 19 | Complete Installation of haulage (Required manpower unskilled-8 Heads and semi Skilled-1 Heads) |
| 20 | Overhead Cost and Others |
| 21 | 4. Manpower for loading, transporttion and installation of Endless Haulage at 76L/3D in Dhemomain Incline Colliery under Sodepur Area. |
| 22 | Loading of haulage drum, motor, baseplate, starter, lighting transformer, switch, cable and other accessories at surface.(Required manpower unskilled-16 Heads and semi Skilled-2 Heads) |
| 23 | Loading of driving pulley, return pulley and 22 mm? rope (length 800 meter)(Required manpower unskilled-16 Heads and semi Skilled-2 Heads) |
| 24 | Transportation of all materials to 76L/3D and 76L/11D.(Required manpower unskilled-16 Heads and semi Skilled-2 Heads) |
| 25 | Installation of tugger haulage and haulage rope fitting(Required manpower unskilled-16 Heads and semi Skilled-2 Heads) |
| 26 | Overhead Cost and Others |
| 27 | Add: PF @ 12% on labour cost |
| 28 | Add: Bonus @ 8.33% on labour cost |
| 29 | Add: Pension @ 7% on labour cost |
| 30 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.