Drinking Water Supply and Sanitation Government Departments Closing in 22 days TDR #57012578

Tender For Repair And Renovation Of Morel Main Canal System District Sawai Madhopur

Issued by Government Departments · Sawai Madhopur, Rajasthan
Tender Value
16.76 Crore
Estimated cost
Bid Submission
07 Sep 2026
22 days left
EMD
33.52 Lakhs
Bank guarantee accepted
Document Fee
10000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Sawai Madhopur → Rajasthan
EMD Exemption
Available
Quantity
Not Available

Project Description

Tender for Repair And Renovation Of Morel Main Canal System District Sawai Madhopur

BOQ

Name of Work:- Repair and Renovation of Morel Main Canal System District Sawai Madhopur
Sl. No. Item Description
1Side shuttering including propping etc. complete (to achieve finish F 2 for :Block joints of foundation stilling basins buckets, aprons etc. (non -suspended horizontally laid mass concrete)
2Side shuttering including propping etc. complete (to achieve finish F 2 for :Top or intermediate bed plates, in between masonry or piers, abutments sluice wells etc.
3Extra labour charges for RCC due to obstruction in laying and placing the reinforced cement concrete due to reinforcement. In foundation rafts, beams, columns bases stilling basins, buckets, aprons etc. (non suspended horizontally laid mass concrete)
4Centering and shuttering for slabs, beams, lintels Columns, trough with or without caps and base including propping and remove
5Supplying of M.S. reionforcement including labour charges for bending binding and placing in position all reinforcement as per drawing including cost of binding wire and all leads and lifts using. Tor or ribbed bars (IS :1786-1985)
6Design, Drawing, fabrication, supply, erection, testing and commissioning of Vent liners (steel liners for sluice/tunnel or as per requirement in Dam/irrigation system) including Embedded parts consisting of liner plates, anchors, stiffeners, girders, fasteners etc. and any required necessary item, with all accessories for all types of Gates/ sluice channels/ any section of water resources projects including cost of all materials, machinery, labour, cutting, aligning, anchoring, welding, finishing, cleaning, tools and tackles, applying two coat of zinc rich epoxy primer to give dry film thickness of 70 5 microns and finish coat (two coats) of solvent less coal tar epoxy paint using airless spray to provide dry film thickness of 150 5 microns per coat thus total dry film thickness of all coats, including primer coating, should not be less than 350 microns., including packing & forwarding, transportation charges complete, as per specifications and approved drawings.
7Dismantling cement concrete including disposal of material within 50 m lead, inclusive of de-watering wherever required.
8Demolishing stone rubble masonry including stacking of usable material and disposal of unuseable material within 50 meters lead inclusive of de-watering wherever required.In cement mortar
9Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting. Thick
10Providing and laying cement concrete coping in (1:2:4) with maximum size of crusher broken aggregate upto 20 mm including shuttering etc. with all leads of material complete in all respect in thickness of: 75 mm
11Cutting and uprooting of trees including removing of roots and filling of hole, cutting/up rooted would be property of the department Over 15 cms to 30 cms. girth
12Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 150mm NP2
13Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 150mm Labour Charges only
14Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 200mm NP2
15Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 200mm Labour Charges only
16Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 300mm NP2
17Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 300 mm Labour Charges only
18Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 600mm NP3
19Providing, laying and fixing in position RCC spun or hume pipe with collars (ISI 458-2003) in required size packed in gasket for hume or spun yarn & neatly finished with rich grout of cement mortar 1:3 perfectly air tight including testing of joints. 600mm Labour Charges only
20Fixing of Distance stone in 30x30x30 cm pit excavated in all type of strata and back filling with cement concrete (1:4:8) projected 10 cm above ground level well finished and properly cured. (Excluding cost of Distance stone)
21Distance stone well dressed of required shape and size 60 cm x 23 cm x 7 cm with exposed faces chiesel dressed.
22Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect Hard / dense soil
23Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor s density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.With initial lead of 250 m Deduct in item no 16 (a) to (d) above if Standard Proctor s density to be achived is at least 95
24(i) Compaction of earth or highly weathered strataBy mechanical equipment such as sheep foot roller/ pneumatic tyred roller/vibro compactor / vibro sheep foot compactor required as per site condition to obtain dry density of.at least 95% of Standard Proctor s density
25Ploughing and picking of surface of old embankment
26Watering of earth including cost of carriage of water when source of water is up to 1 Km
27Supplying and laying quarry spalls properly graded but not more than 10cm in size with spreading in required profile including all leads & lifts
28Removal of slit/soil/earth, sand, pebbles, Malba , debris, rubbish, stone pebbles & obstruction deposited in canal bed up to design line grade and sections having design due to erosion/scour/slips in canal banks/silting with or without bushes and weeds etc. in dry or moist condition from canal bed including dewatering, loading unloading and disposal at suitable place as directed by Engineer in charge with initial lead of 50m. and lift upto 1.5 m with proper dressing on canal bed complete in all respect For depth above 30cm.
29Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect Earth / Soil
30Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5
31Random rubble stone masonry (using R. R. stones where 75 % stones to be not less than 15 cm in size in any direction and weighing not less than 23 kg.) for foundation including curing with all leads of all construction materials including curing etc. complete. In cement sand mortar 1:5 Masonry work in superstructure
32Plaster in cement sand mortar 1:4 including racking of joints, smooth finishing & curing etc. complete including all leads of all construction materials of thickness: 20 mm
33Providing and Laying in position of Cement concrete Design mix M-15 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 320 kg/ cum of concrete) 20 mm
34Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for Bed
35Preparation and dressing the sub grade including removal of irregularities up to 7.5 cm in soil, morrum mixed with pebbles, small boulders and kankar & murrum for Side slopes
36Providing and laying cast in situ plain cement concrete design mix M-15 grade for lining, using well graded crusher broken aggregate of maximum nominal size 20 mm conforming to IS:383-1970, including proportioning of the ingredients by weigh batching and mixing by mechanical mixer including finishing of concrete lining, cutting of grooves for construction joints, complete as per specification with all leads and lifts of construction material complete for canal bed of thickness. 7.5 cm
37Providing and Laying in position of Cement concrete Design mix M-20 including leads of all construction materials, plasticizers (if required), curing, compaction and finishing with rendering in cement sand mortar 1:3 ( 1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto; (For mix design Cement content considered 400 kg/ cum of concrete) 20 mm
38Providing and laying canal lining with mechanically vibrated 300 x 150 x 50 mm PCC blocks made from concrete mix 1:2:4, A20 including all leads and lifts of material, curing, stacking, loading, unloading & transportation of blocks from manufacturing site to lining site. Single tile lining consisting of 12 mm thick cement mortar (1:6) plaster on sub-grade, 12 mm thick sandwich plaster in cement mortar (1:5) over sub grade & 50 mm thick tile lining in cement mortar (1:3) laid over 6 mm thick mortar layer in cement mortar (1:3) including curing, all leads of all construction materials, curing charges and machinery charges with mixture vibration etc., complete as per technical specifications.In sides
39Filling of construction joints with Bitumen based sealing compound lining in the grove as per IS made by cutter upto the 1/3 depth of concrete lining as per specification provided in IS: 3384-1986 and all leads of all construction materials including cost of sealing compound, complete in all respect.
40Extra charges for water spray by nozzle on sub grade of canal including bed and side slopes before laying plain concrete for lining work.
41Providing and laying 75mm thick sand layer in bed (over clays sub grade) duly stabilized with cement slurry (1:20) including all leads and lift of material.
42Providing and laying 75mm thick sand layer on side slope (over clays sub grade) duly stabilized with cement slurry (1:10) including all leads and lift of material.
43Note 14:- Add extra with the permission of Superintending Engineer, 1. Rs 260.00 per cum of concrete if computerised password protected composite weight-batching and mixing plant with suitable green concrete transportation mechanism or transit mixer is used
44Providing and Laying in position of Cement concrete Nominal mix (1:3:6) including leads of all construction materials, curing, compaction and finishing with rendering in cement sand mortar 1:3 (1 cement : 3 coarse sand) and making good the joints excluding the cost of centering, shuttering and reinforcement. Well graded crusher broken stone aggregate of maximum size upto 20 mm Please Enable Macros to View BoQ information

AI Tender Summary

OUR REF NO 57012578
AUTHORITY Government Departments
TENDER VALUE 16.76 Crore
LAST DATE 07-09-2026
Authority
Authority Name Water Resources Department
Work Description Tender for Repair And Renovation Of Morel Main Canal System District Sawai Madhopur
Basic Detail
Tender No ACE NIT 09/2026-27_Morel
Bidding Type Tender
Location
City Sawai Madhopur
State Rajasthan
Key Dates
Publish Date 14 Aug 2026
Submission Date 07 Sep 2026
Open Date 08 Sep 2026
Finance
Tender Value 16.76 Crore
Tender Fee 10000
EMD 33.52 Lakhs
Exemption Available
Document List
34af3374-40e8-422d-bc32-8093e4784f72.html
BOQ_1044410.xls
Morel.pdf
Tendernotice_1 (39).pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 14, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Sep 07, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 22 days
Sep 08, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 23 days

Tender Documents

Download All (ZIP) ↓
html

34af3374-40e8-422d-bc32-8093e4784f72.html

xls

BOQ_1044410.xls

pdf

Morel.pdf

pdf

Tendernotice_1 (39).pdf