Tender for Emergent Restoration Of Sundarban Embankment Damaged Due To Full Moon Kotal On And From 30.07.2026 To 03.08.2026 From Ch. 3.50 Km. To Ch.3.73 Km. For A Length Of 230.00 Metre Facing L/B Of River Chenargang At Mouza Patibunia Under Mousuni (I) Sub - Division Of Kakdwip (I) Division Within Block-Namkhana, Dist- South 24 Parganas.
BOQ
| Sl. No. | Item Description |
| 1 | Supplying Jhaw /Eucalyptus bullah piles at work site,including dressing and making one end pointed.(iii) 15 cm av. Diameter |
| 2 | Labour for driving Jhaw /Eucalyptus bullah piles by monkey in all sorts of soil including hoisting and placing piles in position,protecting the pile head with iron ring and cutting and shaping heads before and after driving and including hire and labour for necessary driving applances and all tackles.(iii) 15 cm av. Diameter |
| 3 | Supplying ,fitting and fixing with iron nails half split bullah wailing pieces and cross pieces etc.complete with cost of all materials and carriage to site.(a) Width of thinner end above 10 cm. and less than 15 cm.(i) Jhaw / Eucalyptus. |
| 4 | Supplying,dressing and stacking at site bamboo pins above 5cm. diameter and upto 7.5cm .diameter. (Dia.to be measured at mid length) |
| 5 | Driving bamboo pins in standing or flowing water including scaffolding and driving appliances.(a) Where boats are not necessary. |
| 6 | Supplying at site High Density Polyethylene (HDPE) bag of size 0.84mx0.38 m conforming to BIS:14252:2015 for bank protective works including all cost of cost oftransportation on road by all means,including other incidental charges complete. Note:Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.8 including the sub-paragraphs,i.e.2.8.1and 2.8.2under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “SpecificationandSpecial Terms & Conditions for High Density Polyethylene(HDPE)Bags”in case of use of this item in the estimate.” |
| 7 | Labour charges for filling HDPE bags with filler materials(earth/sand),machine stitching the open end of the bag with thread as per design and placing the same on slope or dumping from bank within initial lead of 30 m and all lifts including carriage and hire charges of all materials and equipments but excluding the cost of filler materials as directed by Engineer-in-Charge(Volume of earth/sand filled bag should not be less than 0.0328 cum). |
| 8 | Supplying at site and laying in position UV stabilized polypropylene woven geotextile of 430gsmas filter, as per specification, includingcost of preparing the bed, placing the geotextile as per profile with at least 15cm lapping, wherever required and anchorage at top, sewing / welding the overlapped portion, storage and transportation by all means, complete as per direction of the Engineer-in-charge. Note: 1. Payment to be made on measurement of finished surface without lapping, but including anchoring length at top. 2. Payment will be made subject to the result of 3rd Party Testing, to be done by the Engineer-in-charge departmentally. Paragraphs 2.7.7, 2.7.9 and 2.7.10 under the Chapter of “Specification for Works” in the USoR shall be reproduced and included in the tender document as “Specification & Special Terms & Conditions for Geotextile” in case of use of this item in the estimate. 3. This particular item is to be used in special cases, either in continuation of previous usage or after offering adequate justification from techno-economical angles. |
| 9 | Earth work from borrow pits over existing embankment or for repairs to embankment, closing breaches etc.within an initial lead of 30 metre and lift of 1.50 metre including breaking clods and depositing the same in layers not exceeding 25 cm. and rough dressing etc. complete as per profile. |
| 10 | Extra rate over Item Nos. 9 for all kind of soil for every additional lead of 30 metres or part thereof beyond the initial lead of 30 metres. (ii) For five extra lead |
| 11 | Extra rate over Item Nos 9.0 for all kinds of soil for every additional lift of 1.50 metre or part there of beyond the initial lift of 1.50 metre. |
| 12 | Earthwork in excavation in all kinds of soil for making embankments, repairs to the embankment, closing breaches etc. as per profile including supply and transporting the earth by truck or tractor or any other mechanical means on land, including loading, transporting, unloading and stacking with all lifts bothways and head load where necessary and depositing the same on embankments, channels, filling depressions in requisite profile, levelling as per direction of the Engineer-in-charge within a lead of A) Beyond 1.00 Km and upto 2.00 KmNB: Measurement to be taken on the basis of stack measurement / pre-post work section measurement after deduction of void as per norms. No extra payment will be made for stacking. Note 1: Extra rate towards compensation for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹43.00/m³ [Vide Ref: Page No: 87, Item No: 16(Note) of NH Schedule of Rates 2019]Note 2: The rate of royalty for earth/soil/fine sand/silt used for filling/brick making ( including such materials derived from dredging/de-silting) as notified same as that of Ordinary Earth/Brick Earth/fuller Earth vide Gazette notification No. 581-ICE-12013(99)/6/2022-MINES SEC-Dept. of ICE, Date:- 26.09.2022 of Department of Industry, Commerce & Enterprises Mines Branch @ ₹29.00/m³ has been added in this derivation. The royalty will be paid to the agency on production of necessary documents in support of paymentmade towards the royalty.Note 3: Extra rate towards cess for earth for land owned / arranged by the contractor over rate of earthwork for land owned / arranged by the Department has been added in this derivation @ ₹5.30/m³ [Vide Ref: Memo No: 138/3512-29/C/99 Dated; 22.06.2000 of DLR & Jt. LRC, WB] Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 2 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender