Tender For Reconstruction Work Of The Damaged Bridge Located At Km 18.916 Of Garhmukteshwar Rajway. Lot No-25
Tender Value
21.83 Lakhs
Estimated cost
Bid Submission
25 Aug 2026
2 days left
EMD
43660
Bank guarantee accepted
Document Fee
944
Non-refundable
Tender Type
Online
Tender Overview
Organization
Tender ID
Competition Type
NCB
Bidding Type
Tender
Location / State
Meerut → Uttar Pradesh
EMD Exemption
Not Available
Quantity
Not Available
Website
Contact Person
Address
Project Description
Tender for Reconstruction Work Of The Damaged Bridge Located At Km 18.916 Of Garhmukteshwar Rajway. Lot No-25
BOQ
| Sl. No. | Item Description |
| 1 | Dismantling reinforced cement concrete including stacking of material, labour, T&P etc. complete. |
| 2 | Dismantling brick work or stone work and cement concrete incement mortar & including stacking of materialas material, labour, T&P etc. complete. |
| 3 | Earth work in foundation in all types of soil including all lift and all lead and including filling, watering and ramming excavated earth into the trenches or into the space between the structure and the sides of foundation trenches or into the plinth with removal and disposal of surplus earth as directed by the Engineer-in-charge. |
| 4 | Providing & laying C.C. 1:2:4(M-15) with cement, coarse sand & aggregate (25mm to 10mm) i/c all cost of material, labour T&P etc complete (Per CuM.) |
| 5 | Providing & laying R.C.C. 1:1.5:3 (M-20) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) |
| 6 | Providing & laying R.C.C. 1:1:2 (M-25) with cement, coarse sand & aggregate (25mm to 10mm) and also excluding centering and shuttering and reinforcement i/c all cost of material, labour T&P etc complete (Per CuM.) |
| 7 | Centering and shuttering for RCC/RB work including cost of centering & shuttering up to 3.0m height. including cost of all material, T&P & labours complete( per SqM.) |
| 8 | Centering and shuttering for RCC T- Beam bridge,syphon,aqueduct,& box culvert above 3 m span including cost of all material, T&P & labours complete( per SqM.) |
| 9 | Supplying & Laying TMT Steel bar (Of SAIL/TATA TISCON MAKE.) Reinforcement (Fe 550D) including removing of rust, cutting, binding with 24BWG wire, bending, placing with proper overlapping providing chair i/c all cost of material, labour, T&P etc. complete as per direction of Engineer-in-charge |
| 10 | Providing and fixing P.V.C. pipe 100mm dia & 6Kg./cm Sq. I.S.I. Mark i/c all cost of material, labour, T&P etc. complete |
| 11 | Providing and laying Thermacol sheet in expention joint including i/c all cost of material, labour, T&P etc. complete |
| 12 | Providing & laying 1st class (M-150) brick work with 1:4 cement mortar using cement and coarse snad including cost of all material, T&P & labours complete (Per CuM.) |
| 13 | Providing Cement pointing (Struck Deep) on brick masonary in 1:2 Cement Mortar including cost of all material, T&P & labours complete( per SqM.) |
| 14 | Earth work in Filling or in embankment in ordinary soil, excavation to be in the form of irregular pits and earth work in embankments to be in 20 cm. layers, including ramming and dressing the surface to the required levels, sloopes and also including 1.50M lift and 30 metre lead. The earth from cutting to be used in macking embankment or to be deposited as spoil banks within 30 metre distance as directed by Engineer-in-charge. |
| 15 | Earthwork in removing Diversion/Bandha including all lift and all lead with ramming & dressing,proper i/c all cost of material, labour, T&P etc. complete |
| 16 | Providing and fixing of retro-reflectorised cautionary mandatary and information sign as per irc:67:2012 made of high intensity grade sheeting wide clause (30x90 cm left/right Object Hazard) retro- i/c all cost of material, labour, T&P etc. complete. Morth 801.3 |
| 17 | Finishing walls with acrylic smooth exterior paint of required shade new work two or more coat applied @1.67 ltr/10 sqm over including primer coat of exterior primer applied @ 0.90 kg/10 sqm after thorougly brushing the surface free from mortar ropping and other matters and sand prepare smooth including supply of all material s labour t&p etc required for proper completion of the work. |
| 18 | Painting letters including cost of material for writing chainage on V.R.B. i/c all cost of material, labour, T&P etc. complete. |
| 19 | Surface dewatering inclunding removed of rain water /seepage / water accumulation by pumps or other means during excavation of earthwork to keep the site dry for excavation , proper disposal of water away from site, i/c rent of pumps and cost of labour ,fuel,pipes etc complete as per direction of Engineer in - Charge. Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Aug 14, 2026
11:30 IST
Tender Published
Tender notice published.
CompletedAug 25, 2026
17:00 IST
Bid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 2 daysAug 25, 2026
Bid Opening Date
Technical bids will be opened and evaluated.