Bids Are invited for Repair And Overhauling Service - Upgradation Of Plc For Grm Control Panel Onboard In Ship; Any Other Suitable Brand; Yes; Buyer Premises - 1.1. Logic Development & Integration Of The Existing Gear Box Lcp 1.2. Establishment Of Co
Tender Overview
Project Description
Bids Are invited for Repair And Overhauling Service - Upgradation Of Plc For Grm Control Panel Onboard In Ship; Any Other Suitable Brand; Yes; Buyer Premises - 1.1. Logic Development & Integration Of The Existing Gear Box Lcp 1.2. Establishment Of Communication Between Existing I/Os Of The Gear Box Lcp With The New Controller 1.3. Communication Establishment Between Gear Box New Controller And Main Imps And Rtu 1.4. Enabling New Controller For Data Exchange With The Imps And Rtu 1.5. Hmi Screens Development And Integration With The New Controller 1.6. Modification Of The Existing Local Panel By Removing The Existing Controller And Hmi And Mounting Of The New Controller And Hmi. 1.7. Logic Integration & Simulation With New Controller 1.8. Test And Trail Run With Modified System And Handing Over To The Concern Dept 1.9. Preparation Of As Bulit Drawing And Required Documentation And Submission Of The Same. , Mandatory Spares Controller With Logics Code For Gbx Lcp For 1 Set (Vabmep584040) , Mandatory Spares Ethernet Adaptor (Vacra31200) , Mandatory Spares Rack (Vabmexbp0400) , Mandatory Spares Power Supply (Vabmxcps2010) , Mandatory Spares Communication Module (Vabmxnom0200) , Mandatory Spares Gxu Touch Panel With Hmi Code For 1Set (Vahmigxu3512) , Mandatory Spares Ethernet Patch Cards (Vaepc01) , Mandatory Spares Ethernet Switch (Vaesw01)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | 1.1. Logic development & integration of the existing gear box LCP 1.2. Establishment of communication between existing I/o's of the gear box LCP with the new controller 1.3. Communication establishment between gear box new controller and main IMPS and RTU 1.4. Enabling new controller for data exchange with the IMPS and RTU 1.5. HMI screens development and integration with the new controller 1.6. Modification of the existing local panel by removing the existing controller and HMI and mounting of the new controller and HMI. 1.7. Logic integration & simulation with new controller 1.8. Test and trail run with modified system and handing over to the concern dept 1.9. Preparation of as bulit drawing and required documentation and submission of the same. | 1.1. Logic development & integration of the existing gear box LCP 1.2. Establishment of communication between existing I/o's of the gear box LCP with the new controller 1.3. Communication establishment between gear box new controller and main IMPS and RTU 1.4. Enabling new controller for data exchange with the IMPS and RTU 1.5. HMI screens development and integration with the new controller 1.6. Modification of the existing local panel by removing the existing controller and HMI and mounting of the new controller and HMI. 1.7. Logic integration & simulation with new controller 1.8. Test and trail run with modified system and handing over to the concern dept 1.9. Preparation of as bulit drawing and required documentation and submission of the same. |
| 2 | Mandatory Spares Controller with logics code for GBX LCP for 1 Set (VABMEP584040) | Mandatory Spares Controller with logics code for GBX LCP for 1 Set (VABMEP584040) |
| 3 | Mandatory Spares Ethernet adaptor (VACRA31200) | Mandatory Spares Ethernet adaptor (VACRA31200) |
| 4 | Mandatory Spares Rack (VABMEXBP0400) | Mandatory Spares Rack (VABMEXBP0400) |
| 5 | Mandatory Spares Power Supply (VABMXCPS2010) | Mandatory Spares Power Supply (VABMXCPS2010) |
| 6 | Mandatory Spares Communication Module (VABMXNOM0200) | Mandatory Spares Communication Module (VABMXNOM0200) |
| 7 | Mandatory Spares GXU Touch Panel with HMI code for 1set (VAHMIGXU3512) | Mandatory Spares GXU Touch Panel with HMI code for 1set (VAHMIGXU3512) |
| 8 | Mandatory Spares Ethernet Patch cards (VAEPC01) | Mandatory Spares Ethernet Patch cards (VAEPC01) |
| 9 | Mandatory Spares Ethernet Switch (VAESW01) | Mandatory Spares Ethernet Switch (VAESW01) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender