Tender For Design, Supply, Erection, Testing And Commissioning Of Co2 Gas Fire Suppression System For Umiam Stage-I And Umiam Umtru Stage-4 Power Station And Refilling Of The Co2 Cylinders Along With Complete Overhauling Of Fire Alarm System, Supply
Tender Overview
Project Description
Tender for Design, Supply, Erection, Testing And Commissioning Of Co2 Gas Fire Suppression System For Umiam Stage-I And Umiam Umtru Stage-4 Power Station And Refilling Of The Co2 Cylinders Along With Complete Overhauling Of Fire Alarm System, Supply Of Detectors And Testing And Commissioning Of Co2 Gas Fire Suppression System For Umiam Stage-Ii Power Station, Me.Pgcl, Umsumer Ri Bhoi District, Meghalaya.
BOQ
| Sl. No. | Item Description |
| 1 | Fixed High Pressure Main & Standby, Master & Slave Cylinder Operation principle using directional valve (2+2) x 45 Kg. CO2 Cylinder Bank with Initial & Extended Discharge Tubular Frame Assembly Fully Integrated & TestedINITIAL DISCHARGE |
| 2 | CO2 Cylinder Master Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by 24VDC solenoid and manual lever. |
| 3 | CO2 Cylinder Slave Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by pneumatic actuator |
| 4 | Online Monitor Analogue Type with Normal Indication - Analog LED type |
| 5 | N2 Pilot Cylinder Assembly |
| 6 | High Pressure Actuation Hose - 1000mm |
| 7 | 25NB CO2 Directional valve with Joing Manifold |
| 8 | Joining Manifold for 4 Nos. of Directional Valve |
| 9 | Tubular Frame Assembly with Weighing Device Mounting Rail (Suitable for (2+2) Nos.of 45Kg. Capacity CO2 Cylinders) |
| 10 | Non-Return Valve suitable for CO2 Master Cylinder |
| 11 | Non-Return Valve suitable for CO2 Slave Cylinder |
| 12 | High Pressure Discharge Hose - 400mm |
| 13 | High Pressure Discharge Hose - 350mm |
| 14 | High Pressure Actuation Hose - 550mm |
| 15 | High Pressure Actuation Hose - 300mm |
| 16 | Manifold Safety Valve |
| 17 | Bleeder valve |
| 18 | Pressure Switch |
| 19 | Fixed High Pressure Main & Standby, Master & Slave Cylinder Operation principle using directional valve (3+3) x 45 Kg. CO2 Cylinder Bank with Initial & Extended Discharge Tubular Frame Assembly Fully Integrated & Tested EXTENDED DISCHARGE |
| 20 | CO2 Cylinder Master Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by 24VDC solenoid and manual lever. |
| 21 | CO2 Cylinder Slave Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by pneumatic actuator |
| 22 | Online Monitor Analogue Type with Normal Indication - Analog LED type |
| 23 | Joining Manifold for Directional Valve |
| 24 | Tubular Frame Assembly with Weighing Device Mounting Rail (Suitable for (3+3) Nos.of 45Kg. Capacity CO2 Cylinders |
| 25 | Non-Return Valve suitable for CO2 Master Cylinder |
| 26 | Non-Return Valve suitable for CO2 Slave Cylinder |
| 27 | High Pressure Discharge Hose - 400mm |
| 28 | High Pressure Discharge Hose - 350mm |
| 29 | High Pressure Actuation Hose - 550mm |
| 30 | High Pressure Actuation Hose - 300mm |
| 31 | Manifold Safety Valve |
| 32 | Bleeder valve |
| 33 | Pressure Switch |
| 34 | CO2 Nozzle with Corn horn with Adaptor |
| 35 | Safety Sign Board - Vacate Immediately. |
| 36 | Safety Sign Board - Do Not Enter |
| 37 | 25 NB Manual Lockout Valve with Supervisory Limit Switch |
| 38 | Sealed Probe type horizontal heat detector with junction box - 90 Deg.C Temperature Setting |
| 39 | Conventional Heat detector with base and junction box |
| 40 | Manual Gas Discharge Station with inbuilt addressable module suitable for Semi outdoor application |
| 41 | Inhibit Switch / Abort Switch with inbuilt addressable module suitable for Semi outdoor Application |
| 42 | Electronic dual tone hooter with flashing lamp for Indoor Application |
| 43 | Barrel door limit switch |
| 44 | Main and standby selector switch unit |
| 45 | Conventional Microprocessor Based 8 Zone Type Fire Alarm cum Gas Discharge Panel with 4 Gas Discharge Modules with inbuilt Charger & with Battery and Auxillary Power Supply. |
| 46 | M.S Junction Box with terminals |
| 47 | FRLS Armoured Copper Conductor 1.1 KV Grade Cables |
| 48 | 2C x 1.5sq.mm |
| 49 | 4C x 1.5sq.mm |
| 50 | Carbon Steel Seamless Sch80 Pipe as per ASTM A 106 Gr B |
| 51 | 25 NB |
| 52 | Forged Fittings |
| 53 | STRUCTURAL STEEL For Hydro. Generator #1, 2, 3 & 4 |
| 54 | ISA (40x40x5) |
| 55 | M.S. Insert Plate (6mm Thk.) (150 Sq.mm) |
| 56 | Anchor Fastner (M10x100mm Long) |
| 57 | G.I U-Bolt with washer & Nuts (25NB) 8 mm Thick Rod. |
| 58 | M.S Mounting Plate for Probe Detector |
| 59 | FLANGES |
| 60 | FLANGE - 25 NB DRILLING AS PER ANSI B16.5 CL-300 |
| 61 | ACCESSORIES FOR CABLING |
| 62 | Cable Tie 100 mm |
| 63 | Cable Tie 200 mm |
| 64 | Cable Saddle 12 mm |
| 65 | Lugs U Type 1.5 Sq.mm |
| 66 | Double Compression Glands 19 mm |
| 67 | PVC Wall Plug (PVC Gitti) 35x8 mm |
| 68 | Screw 35x8 mm |
| 69 | Gypsum Screw (1-inch) |
| 70 | Erection, Testing and Commissioning Charges |
| 71 | Packing Charges |
| 72 | Transportation Chrges Please Enable Macros to View BoQ information |
| 73 | Fixed High Pressure Main & Standby, Master & Slave Cylinder Operation principle using directional valve (6+6) x 45 Kg. CO2 Cylinder Bank with Initial & Extended Discharge Tubular Frame Assembly Fully Integrated & TestedINITIAL DISCHARGE |
| 74 | CO2 Cylinder Master Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by 24VDC solenoid and manual lever. |
| 75 | CO2 Cylinder Slave Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by pneumatic actuator |
| 76 | Online Monitor Analogue Type with Normal Indication - Analog LED type |
| 77 | N2 Pilot Cylinder Assembly |
| 78 | High Pressure Actuation Hose - 1000mm |
| 79 | 25NB CO2 Directional valve with Joing Manifold |
| 80 | Joining Manifold for 4 Nos. of Directional Valve |
| 81 | Tubular Frame Assembly with Weighing Device Mounting Rail (Suitable for (6+6) Nos.of 45Kg. Capacity CO2 Cylinders) |
| 82 | Non-Return Valve suitable for CO2 Master Cylinder |
| 83 | Non-Return Valve suitable for CO2 Slave Cylinder |
| 84 | High Pressure Discharge Hose - 400mm |
| 85 | High Pressure Discharge Hose - 350mm |
| 86 | High Pressure Actuation Hose - 550mm |
| 87 | High Pressure Actuation Hose - 300mm |
| 88 | Manifold Safety Valve |
| 89 | Bleeder valve |
| 90 | Pressure Switch |
| 91 | Fixed High Pressure Main & Standby, Master & Slave Cylinder Operation principle using directional valve (6+6) x 45 Kg. CO2 Cylinder Bank with Initial & Extended Discharge Tubular Frame Assembly Fully Integrated & Tested EXTENDED DISCHARGE |
| 92 | CO2 Cylinder Master Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by 24VDC solenoid and manual lever. |
| 93 | CO2 Cylinder Slave Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas with valve operated by pneumatic actuator |
| 94 | Online Monitor Analogue Type with Normal Indication - Analog LED type |
| 95 | Joining Manifold for Directional Valve |
| 96 | Tubular Frame Assembly with Weighing Device Mounting Rail (Suitable for (6+6) Nos.of 45Kg. Capacity CO2 Cylinders |
| 97 | Non-Return Valve suitable for CO2 Master Cylinder |
| 98 | Non-Return Valve suitable for CO2 Slave Cylinder |
| 99 | High Pressure Discharge Hose - 400mm |
| 100 | High Pressure Discharge Hose - 350mm |
| 101 | High Pressure Actuation Hose - 550mm |
| 102 | High Pressure Actuation Hose - 300mm |
| 103 | Manifold Safety Valve |
| 104 | Bleeder valve |
| 105 | Pressure Switch |
| 106 | CO2 Nozzle with Corn horn with Adaptor |
| 107 | Safety Sign Board - Vacate Immediately. |
| 108 | Safety Sign Board - Do Not Enter |
| 109 | 25 NB Manual Lockout Valve with Supervisory Limit Switch |
| 110 | Sealed Probe type horizontal heat detector with junction box - 90 Deg.C Temperature Setting |
| 111 | Conventional Heat detector with base and junction box |
| 112 | Manual Gas Discharge Station with inbuilt addressable module suitable for Semi outdoor application |
| 113 | Inhibit Switch / Abort Switch with inbuilt addressable module suitable for Semi outdoor Application |
| 114 | Electronic dual tone hooter with flashing lamp for Indoor Application |
| 115 | Barrel door limit switch |
| 116 | Main and standby selector switch unit |
| 117 | Conventional Microprocessor Based 8 Zone Type Fire Alarm cum Gas Discharge Panel with 4 Gas Discharge Modules with inbuilt Charger & with Battery and Auxillary Power Supply. |
| 118 | M.S Junction Box with terminals |
| 119 | FRLS Armoured Copper Conductor 1.1 KV Grade Cables |
| 120 | 2C x 1.5sq.mm |
| 121 | 4C x 1.5sq.mm |
| 122 | Carbon Steel Seamless Sch80 Pipe as per ASTM A 106 Gr B |
| 123 | 25 NB |
| 124 | Forged Fittings |
| 125 | STRUCTURAL STEEL For Hydro. Generator #1, 2, 3 & 4 |
| 126 | ISA (40x40x5) |
| 127 | M.S. Insert Plate (6mm Thk.) (150 Sq.mm) |
| 128 | Anchor Fastner (M10x100mm Long) |
| 129 | G.I U-Bolt with washer & Nuts (25NB) 8 mm Thick Rod. |
| 130 | M.S Mounting Plate for Probe Detector |
| 131 | FLANGES |
| 132 | FLANGE - 25 NB DRILLING AS PER ANSI B16.5 CL-300 |
| 133 | ACCESSORIES FOR CABLING |
| 134 | Cable Tie 100 mm |
| 135 | Cable Tie 200 mm |
| 136 | Cable Saddle 12 mm |
| 137 | Lugs U Type 1.5 Sq.mm |
| 138 | Double Compression Glands 19 mm |
| 139 | PVC Wall Plug (PVC Gitti) 35x8 mm |
| 140 | Screw 35x8 mm |
| 141 | Gypsum Screw (1-inch) |
| 142 | Erection, Testing and Commissioning Charges |
| 143 | Packing Charges |
| 144 | Transportation Chrges |
| 145 | Refilling of CO2 Cylinder Master Assembly consist of CCOE approved 68ltr w/c cylinder filled with 45kg CO2 gas. |
| 146 | Refilling of N2 Pilot Cylinders w/c 6 Ltrs filled with 15 Bar N2 Gas |
| 147 | Heat Detectors |
| 148 | N2 Pilot Cylinder Assembly |
| 149 | Online Monitor Analogue Type with Normal Indication - Analog LED type |
| 150 | Panel for Online Weight Monitoring System |
| 151 | Erection, Testing and Commissioning Charges |
| 152 | Packing Charges |
| 153 | Transportation Charges |
| 154 | TOTAL PRICE SCHEDULE NO. 1 (BoQ1)Supply, Erection, Testing and Commissioning of CO2 Gas Fire Suppression System for Umiam Stage-I |
| 155 | TOTAL PRICE SCHEDULE NO. 2 (BoQ2)Supply, Erection, Testing and Commissioning of CO2 Gas Fire Suppression System for Umiam Umtru Stage-4 Power Station |
| 156 | TOTAL PRICE SCHEDULE NO. 3 (BoQ3)Refilling of the CO2 cylinders along with complete Overhauling of Fire Alarm system, supply of detectors and Testing and Commissioning of CO2 Gas Fire Suppression System for Umiam Stage-II Power Station |
| 157 | Grand Total |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 10 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 10 daysTender Documents