Tender For Replacement Of Old Damaged Sluice And N.R.V. Centrifugal Pumps Delivery Line, Exhaust Fan Of Vcb Room, Rewinding Of Open Well Submersible Pump Act As A Dewatering Pump At Pansuli Head Works Site Under Rcfa Part-Iii(Zone-I) Water Supply Sch
Tender Overview
Project Description
Tender for Replacement Of Old Damaged Sluice And N.R.V. Centrifugal Pumps Delivery Line, Exhaust Fan Of Vcb Room, Rewinding Of Open Well Submersible Pump Act As A Dewatering Pump At Pansuli Head Works Site Under Rcfa Part-Iii(Zone-I) Water Supply Scheme.
BOQ
| Sl. No. | Item Description |
| 1 | Valve replacement portion:- |
| 2 | 200 mm dia, P.N.-1.6 cast iron double flanged Rising Spindle Sluice Valve generally confirming to IS:14846 having body door /dome/Bonnet and cover of cast Iron Gr FG 260, outside screen rising Spindle of IS 6603 Gr-12 cr-13, spindle nut & seat rings are Gunmetal as per 1S:318 LTB 2. Flanges flat faced and drilled to IS:1538 Part IV & VI, Valves are suitable for maximum working pressure of 16 kg/sqcm (seat test) and body tested to 24 kg/sqcm. All the valves should be tested by closed end method only.(Make:-IVI/Jupiter/Other approved make)(Delivery side of Pump No-03) |
| 3 | 200 mm dia, P.N.-1.6, cast iron double flanged single door swing non-return valve generally conforming to IS:5312 Part I, having body, door, cover in graded cast iron to IS:210 Gr.FG200, body and door rings & bearing block of leaded tin bronze to IS:318 Gr.LTB 2 (350mm & above), hinge pin of st.st.AISI410, valve suitable for a maximum working pressure of 16 kg/cm2 (Seat test) & body tested to 24 kg/Sqcm.(Make:-IVI/Jupiter/Other approved make)(Delivery side of Pump No-01) |
| 4 | Taking out of old and damaged valve of any type from the existing line after dismantling of Flange Joint or Socket Joint and fitting, fixing of New Valve.(Cost of dismantling of joint and renewing the same to be added with this item to complete the job in all respect ), repairing of flange joint after dismantling the joints, removing the unserviceable rubber insertion and supply new rubber insertion and supply upto 50 % of new nuts and bolts all complete including necessary earth work dewatering & supply of washer etc. all complete as per direction of E.I.C. |
| 5 | Exhaust fan replacement at VCB Room:- |
| 6 | Supply of 450 mm sweep exhaust fan 220-240 V AC, 50 Hz.(Make:-Approved make) |
| 7 | Fixing only exhaust fan after making hole in wall and making good damages and smooth cement finish etc. as practicable as possible and providing necy. length of PVC insulated wire and making connection for exhaust of following diameter:-45 cm (18\\") |
| 8 | Low lift cable rectification portion:- |
| 9 | Making straight through joint of 3 Core 10 mm2 Al Ar. Cable with 3 Core X 4 Sqmm submersible cable by supplying necessary seal kit to make joints leak proof all complete as per direction.(Without Kit) |
| 10 | Making straight through joint in between 3 core 10 mm2 Al Ar. Cable by supplying necessary seal kit to make joints leak proof all complete as per direction.(Without Kit) |
| 11 | Open well submersible motor rewinding portion(0.75 KW/1.0 HP):- |
| 12 | Withdrawing of 1.0 HP dewatering/open well submersible pump with motor from the sump, after disconnection of power line and delivery line by engaging skilled mechanic, also decoupled from motor as per direction of EIC. |
| 13 | Carrying the burn out motor from Pansuli Head Works Site to reputed work shop by hired vehicles including loading and unloading on both the end, also back carrying the same as per direction. |
| 14 | Dismantling the motor, removing stator and rotor winding portion from the slot wedges, removing all nomex paper, dirt, dust of varnish etc with terminals from Box as per direction of EIC. |
| 15 | Supply of Super enameled copper wire PVC sheathed. (Cost of winding is considered after deduction of the value of burnt out coil). |
| 16 | Supply of oil seal. |
| 17 | Supply of stick, flim, soldering elements. |
| 18 | Machining of shaft and dynamic balancing. |
| 19 | Coil making & winding as per original with wooden frame & connection, also refitting in to the C.I. body as per direction. |
| 20 | Installation of motor at the sump, pump coupled with motor, jointing all necessary power connection in the terminal box and also all complete including testing of the pump and motor and commissioning the same as per direction. |
| 21 | Add GST @ 18% |
| 22 | Add CESS @ 1% Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 15 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 17 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender