Bids Are invited for Handling ,Transport And Other Mining Services - Percentage Quote Based - Assistance Work In Mining, Crushing Or Screening Plant, Garage, Workshop Etc. - Carriage Of Lime From Incline Mouth To U/G Mine Destinantion Through Haulage
Tender Overview
Project Description
Bids Are invited for Handling ,Transport And Other Mining Services - Percentage Quote Based - Assistance Work In Mining, Crushing Or Screening Plant, Garage, Workshop Etc. - Carriage Of Lime From Incline Mouth To U/G Mine Destinantion Through Haulage Track ( For A Lead Of 4-1=3 Km)(112800.00 Sqm X 0.2 Kg/Sqm)/ 790Kg/Cum = 28.56 Cum , Carriage Of Lime In U/G Mine By Manual Labour Including Loading, Unloading & Stacking For A Lead Of 0-50 M , Applying White Washing One Coat To Give An Even Shade In Underground Mine Excluding Carriage From Incline Mouth To U/G Site.6000M X (4.4+2.5+2.5)= 56400.00 Sqm X 2 Times = 112800.00 Sqm For The Year 2026 , Carriage Of Stone Dust From Incline Mouth To U/G Mine Destination Through Haulage Track (Only Labour Rate)(112800Sqmx0.2Kg/Sqm) /1600Kg/Cum = 14.10Cum , Carriage Of Stone Dust In U/G Mine By Manual Labour Including Loading, Unloading & Stacking For A Lead Of 0-50M. (Only Labour Rate)
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | Carriage of lime from incline mouth to U/G mine destinantion through haulage track ( for a lead of 4-1=3 km)(112800.00 Sqm X 0.2 Kg/Sqm)/ 790Kg/Cum = 28.56 cum | Carriage of lime from incline mouth to U/G mine destinantion through haulage track ( for a lead of 4-1=3 km)(112800.00 Sqm X 0.2 Kg/Sqm)/ 790Kg/Cum = 28.56 cum |
| 2 | Carriage of lime in U/G mine by manual labour including loading, unloading & stacking for a lead of 0-50 m | Carriage of lime in U/G mine by manual labour including loading, unloading & stacking for a lead of 0-50 m |
| 3 | Applying white washing one coat to give an even shade in underground mine excluding carriage from incline mouth to U/G site.6000m X (4.4+2.5+2.5)= 56400.00 Sqm X 2 Times = 112800.00 Sqm for the year 2026 | Applying white washing one coat to give an even shade in underground mine excluding carriage from incline mouth to U/G site.6000m X (4.4+2.5+2.5)= 56400.00 Sqm X 2 Times = 112800.00 Sqm for the year 2026 |
| 4 | Carriage of stone dust from incline mouth to U/G mine destination through haulage track (only labour rate)(112800SqmX0.2Kg/Sqm) /1600Kg/cum = 14.10Cum | Carriage of stone dust from incline mouth to U/G mine destination through haulage track (only labour rate)(112800SqmX0.2Kg/Sqm) /1600Kg/cum = 14.10Cum |
| 5 | Carriage of stone dust in U/G mine by manual labour including loading, unloading & stacking for a lead of 0-50m. (only labour rate) | Carriage of stone dust in U/G mine by manual labour including loading, unloading & stacking for a lead of 0-50m. (only labour rate) |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 4 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 4 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender