Power Government Departments Closing in 10 days TDR #56999315

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 10/16 Kva To 400 Kva Three Phase Cu Wound Distribution Transformer At Auraiya Workshop Under Ewd, Kanpur; Damaged Distribution Transfor

Issued by Government Departments · Agra, Uttar Pradesh
Tender Value
23.60 Lakhs
Estimated cost
Bid Submission
24 Aug 2026
10 days left
EMD
20000
Bank guarantee accepted
Document Fee
Ref. Documents
Non-refundable
Tender Type
Gem

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
Agra → Uttar Pradesh
EMD Exemption
Not Available
Quantity
1

Project Description

Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 10/16 Kva To 400 Kva Three Phase Cu Wound Distribution Transformer At Auraiya Workshop Under Ewd, Kanpur; Damaged Distribution Transformer; As Boq And Gem B.. - 10/16 Kva Single Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 25 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 63 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 100 Kva Three Phase Alu./Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 160 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 250 Kva Three Phase Alu./Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 400 Kva Three Phase Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor).

AI Tender Summary

OUR REF NO 56999315
AUTHORITY Government Departments
TENDER VALUE 23.60 Lakhs
LAST DATE 24-08-2026
Authority
Authority Name Uttar Pradesh Power Corporation Limited
Work Description Bids Are invited for Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - Repairing Of 10/16 Kva To 400 Kva Three Phase Cu Wound Distribution Transformer At Auraiya Workshop Under Ewd, Kanpur; Damaged Distribution Transformer; As Boq And Gem B.. - 10/16 Kva Single Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 25 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 63 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 100 Kva Three Phase Alu./Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Removal Of Old Layers (Multilayers) Of Top Cover Plate By Welding/Gas Cutting After Taking Out The Tank At Safe Area. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 160 Kva Three Phase Alu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 250 Kva Three Phase Alu./Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor). , 400 Kva Three Phase Cu. Wound (Workshop Vidhuna (Auraiya) -Dragging, Shifting, Handling Of Damagetransformer From Stacking Yard To Dismantling Area. Draining Of Oil Into Pit/Drum. Opening Of Top Cover Plate By T&P Or Cutting Of Sealed Transformer Top Cover Plate By Chisel Hammer Process, Taking Out The Core And Coil Assembly From The Tank. Dismantling Core And Coil Assembly. Assembly Of Displaced Core And Cleaning Of Dust And Dirt By Cotton Waste And Wooden Dust From Every Leaf Of Laminations If Required (Welding/Brazing/Gas Cutting/Wooden Dust Required For This Work Shall Be Arranged By The Contractor). , Making Of L.V. Coils As Per Original Design/Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Making Of Hv Leg Coils Of Same Size And Dimensions As Old One Or Design Approved By Concern Je/Ae (Using Either New Coil Or Reconditioning Old Coil As Per Technical Conditions Of Old Coil). , Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacements Such As Press Board Etc. Making Supports Between Adjacent Section By Insulation Spacers Barriers Etc. And Tapping Etc (Brazing/Soldering Required, Shall Be Arranged By The Contractor). Shifting And Keeping The Assembled Core And Coils Etc. In Oven From The Repairing And Assembly Place. , Cleaning Of Tank In Cleaning Yard. Repairing Of Burst Body & Radiator Properly With Welding Including Repairing Of Bended Base Channel. Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality. (Berger, Nerolac, Jenson & Necholson Etc) Paint Material Shall Be Provided By Contractor At His Own Cost. , Dragging Out Clean Empty Tank From Yard To Repairing Hall. Taking Out Assembled Core And Coils Assembly From The Oven After Proper Megger Value And Shifting To Repairing Hall. (Meggar Will Be Arranged By The Contractor At His Own Cost.). Retanking Of Complete Assembly Into Painted Tank And Proper Tightening Of The Assembly In The Tank Safely By Using Nut Bolts And Spring Washer Of Good Quality, Fitting Of All Accessories Of The Transformer Including Fixing Of Pressure Release Valve/Vent Pipe And Filling Of Oil In Transformer (Vent Pipe Will Be Arranged By The Contractor At His Own Cost.). Punching Of Unique No. On Ms Plate 100X50x3 Mm. Size & Welding Of Ms Plate On Transformer Body Containing Following Information:- Uniqe Number, Capacity (Ms Plate & Punching Machine Shall Be Provided By Contractor). , Refiting/Replacement/Fixing Of Ht Bushings. , Refiting/Replacement/Fixing Of Lt Bushings. , Refiting/Replacement/Fixing Of Ht Bushing Rods. , Refiting/Replacement/Fixing Of Lt Bushing Rods. , Refiting/Replacement/Fixing Of Ht Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Lt Gasket/Oil Seal For All Phase. , Refiting/Replacement/Fixing Of Top Cover Plate Gasket With Typing Of Top Cover Plate By Using Nut Bolt & Washer. , Refiting/Replacement/Fixing Of Arching Horns/Breather. , Painting Of T/F Outside With Super Enemal Synthetic Paint In Two Coats After De-Rusting And Providing Primer Of Red Oxide Paint Etc.(Color Should Be Decided By Ee Ws) Paint & Painting Material Shall Be Arranged By The Contractor. Painting Of 02 No. 50 Mm. Wide Green/Yellow/Orange/Red Strip & Writing Name Of Workshop And ^^Fo|Qr Lecu/Kh Fkdk;R Gsrq Vksy Qzh Ua0 1912 Ij Leidz Djsaa**] Dragging Of Repaired T/F Upto The Test Cabin /Testing Place And Making Full Arrangement For The Testing Of Transformer And Their Re-Dragging To Yard And Its Stacking At Indentified Place. , Daily Cleaning Of Workshop Floor Area, Open Shade And Open Area Including The Scrap Material Such As Old Paper, Old Pressboard, Old Cotton Waste Etc. (Wood Dust, Sweeper, Other Required Man Power And T&P Shall Be Arranged By The Contractor).
Basic Detail
Tender No GEM/2026/B/7915769
Bidding Type Tender
Location
City Agra
State Uttar Pradesh
Key Dates
Publish Date 13 Aug 2026
Submission Date 24 Aug 2026
Open Date 24 Aug 2026
Finance
Tender Value 23.60 Lakhs
Tender Fee Ref. Documents
EMD 20000
Exemption Not Available
Document List
FORMAB_27e196ca-503e-4530-bdd51786623854677_EWCAGRABUYER.pdf
GEMBidATC_32350eb2-195b-47a9-bfb21786623844640_EWCAGRABUYER.pdf
GEMBidATC_b6e127e4-1309-4f23-a7a21786623835202_EWCAGRABUYER.pdf
1786623788.pdf
1786623793.pdf
d2b7f783-e9be-4151-a5b7-b10e7ea3750a.pdf
1786623774.xlsx
1786623783.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Aug 13, 2026
11:30 IST

Tender Published

Tender notice published.

Completed
Aug 24, 2026
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Upcoming · 10 days
Aug 24, 2026

Bid Opening Date

Technical bids will be opened and evaluated.

Upcoming · 10 days

Tender Documents

Download All (ZIP) ↓
pdf

FORMAB_27e196ca-503e-4530-bdd51786623854677_EWCAGRABUYER.pdf

pdf

GEMBidATC_32350eb2-195b-47a9-bfb21786623844640_EWCAGRABUYER.pdf

pdf

GEMBidATC_b6e127e4-1309-4f23-a7a21786623835202_EWCAGRABUYER.pdf

pdf

1786623788.pdf

pdf

1786623793.pdf

pdf

d2b7f783-e9be-4151-a5b7-b10e7ea3750a.pdf

xlsx

1786623774.xlsx

pdf

1786623783.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders