Bids Are invited for Facility Management Services - Lumpsum Based - Contract For Construction Of Rcc Tank For Swro; Contract For Construction Of Rcc Tank For Swro; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Dsr 2018
Tender Overview
Project Description
Bids Are invited for Facility Management Services - Lumpsum Based - Contract For Construction Of Rcc Tank For Swro; Contract For Construction Of Rcc Tank For Swro; Consumables To Be Provided By Service Provider (Inclusive In Contract Cost) - Dsr 2018 Item No. 2.9.1 Excavation Work By Mechanical Means Ordinary Rock , Dsr 2018 Item No. 4.1.8 Providing And Laying Cement Concrete 1:4:8 , Dsr 2018 Item No. 5.9.1 Centering And Shuttering Foundations Footings , Dsr 2018 5.9.2 Centering And Shuttering Walls (Any Thickness) Plinth And String Courses Etc. , Dsr 2018 Item No. 5.22.6 Steel Reinforcement For R.C.C. Up To Plinth Level. Tmt Bars , Dsr 5.22A.6 Dsr 5.22.6 Steel Reinforcement For R.C.C. All Complete Above Plinth Level. , Dsr 2018 5.33.1 P&L In Position Machine Batched & Machine Mixed Design Mix M-25 Grade Cc Upto Plint , Dsr 5.33.2 , Dsr-2018 Item 5.34.2
BOQ
| Sl. No. | Item Title | Item Description |
| 1 | DSR 2018 item no. 2.9.1 Excavation work by mechanical means Ordinary rock | DSR 2018 item no. 2.9.1 Excavation work by mechanical means Ordinary rock |
| 2 | DSR 2018 item no. 4.1.8 Providing and laying cement concrete 1:4:8 | DSR 2018 item no. 4.1.8 Providing and laying cement concrete 1:4:8 |
| 3 | DSR 2018 item no. 5.9.1 Centering and shuttering Foundations footings | DSR 2018 item no. 5.9.1 Centering and shuttering Foundations footings |
| 4 | DSR 2018 5.9.2 Centering and shuttering Walls (any thickness) plinth and string courses etc. | DSR 2018 5.9.2 Centering and shuttering Walls (any thickness) plinth and string courses etc. |
| 5 | DSR 2018 item no. 5.22.6 Steel reinforcement for R.C.C. up to plinth level. TMT bars | DSR 2018 item no. 5.22.6 Steel reinforcement for R.C.C. up to plinth level. TMT bars |
| 6 | DSR 5.22A.6 DSR 5.22.6 Steel reinforcement for R.C.C. all complete above plinth level. | DSR 5.22A.6 DSR 5.22.6 Steel reinforcement for R.C.C. all complete above plinth level. |
| 7 | DSR 2018 5.33.1 P&L in position machine batched & machine mixed design mix M-25 grade CC Upto plint | DSR 2018 5.33.1 P&L in position machine batched & machine mixed design mix M-25 grade CC Upto plint |
| 8 | DSR 5.33.2 | DSR 5.33.2 |
| 9 | DSR-2018 Item 5.34.2 | DSR-2018 Item 5.34.2 |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 5 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 5 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender