Tender For Supply, Installation, Testing & Commissioning Of Standalone Solar Powered Surveillance System With 4G Sim Based, Ai-Ptz Combo Camera And Integrated Dual Solar Street Light At Mhps, Rvunl, Banswara
Tender Overview
Project Description
Tender for Supply, Installation, Testing & Commissioning Of Standalone Solar Powered Surveillance System With 4G Sim Based, Ai-Ptz Combo Camera And Integrated Dual Solar Street Light At Mhps, Rvunl, Banswara , Item Wise Boq Boq_Ver4.0 Item Wise Normal Inr Only Inr Select, Excess (+), Less (-) Tender Inviting Authority: Superintending Engineer (Gen.), Mhps, Rvunl, Banswara Name Of Work: Supply, Installation, Testing & Commissioning Of Standalone Solar Powered Surveillance System With 4G Sim Based, Ai-Ptz Combo Camera And Integrated Dual Solar Street Light At Mhps, Rvunl, Banswara Contract No: Nib-/Se(Gen)/Rvunl/Banswara Name Of The Bidder/ Bidding Firm / Company : Price Schedule (This Boq Template Must Not Be Modified/Replaced By The Bidder And The Same Should Be Uploaded After Filling The Relevent Columns, Else The Bidder Is Liable To Be Rejected For This Tender. Bidders Are Allowed To Enter The Bidder Name And Values Only ) 1.The Rates Quoted Must Be For Delivery Of Supplies To Mhps, Banswara On F.O.R. Mhps- Central Stores Basis With Clear Demarcation Of The Following: I. Basic Rate Ii. Gst, Iii. Packing & Forwarding Charges And Gst On Packing & Forwarding Charges, Iv. Freight Charges And Gst On Freight Charges, V. Insurance And Gst On Insurance Charges, 2. L1 Will Be Decided On The Lump-Sum Basis. Number # Text # Text # Number # Text # Number Number Text Text # Number # Text# Text # Number # Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number Number Text Text Number Number Number # Number # Text Text Number # Number # Date Number # Number # Text # S. No. Item Description Item Code / Make Quantity Units Estimated Rate In Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion Against Each Item Quoted Currency In Inr / Other Currency Basic Unit Rate In Rs. P. Basic Amount In Rs. P. Packing And Forwarding Charges In Percentage (%) Packing And Forwarding Charges In Rs. P. Basic Amount Inclusive Of Packing And Forwarding Charges In Rs. P. Gst On (Basic Amount + Packing And Forwarding Charges ) In Percentage (%) Gst On (Basic Amount + Packing And Forwarding ) In Rs. P. Freight Charges In Percentage (%) Gst On Freight Charges In Percentage (%) Freight Charges Including Gst In Rs. P. Insurance Charges In Percentage (%) Gst On Insurance Charges In Percentage (%) Insurane Charges Including Gst In Rs. P. Other Taxes And Duties, If Any For Entire Quantity (Levied Bycentral/State/Local Governments On Final Product) In Rs, Hsn / Sac Code Total Amount Excluding Taxes In Rs. P Total Amount With Taxes 18=(9+11+14+17) In Rs. P. Total Amount In Words , Supply And Etc Of Standalone Dual Solar Street Light (2X 30 Watt) Mounted On 6 Meter Gi Pole With Cross Arms Including Reinforced Cement Concrete Foundation Work (As Per Scope Of Work And Technical Specifications As In Mentioned At Part A 2 Iii B) , Supply And Etc Of Standalone Solar Powered Surveillance System, Combo Camera Using 4G Sim Based Connectivity For Live Monitoring With Mounting Accessories For Installation On Above Mentioned Gi Pole (As Per Scope Of Work And Technical Specifications As In Mentioned At Part A 2 Iii B ) Total In Figures 0.0 0.0 Inr Zero Only 4.0 Construction Of Chamber For 100Mm Sluice Plates Item5 10.0 Nos Quoted Rate In Figures Select % 0.0 0.0 Zero Only Quoted Rate In Words Inr Zero Only
Corrigendum
| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 24-Aug-2026 | Corrigendum-II | Date | 08-Sep-2026 |
| 2 | 08-Sep-2026 | Corrigendum-III | Date | 17-Sep-2026 |
BOQ
| Sl. No. | Item Description |
| 1 | Item Wise BoQ BoQ_Ver4.0 Item Wise Normal INR Only INR Select, Excess (+), Less (-) Tender Inviting Authority: Superintending Engineer (Gen.), MHPS, RVUNL, Banswara Name of Work: Supply, Installation, Testing & Commissioning of standalone solar powered surveillance system with 4G Sim Based, AI-PTZ combo camera and integrated dual solar street light at MHPS, RVUNL, Banswara Contract No: NIB-57/2026-27/SE(Gen)/RVUNL/Banswara Name of the Bidder/ Bidding Firm / Company : PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )1.The rates quoted must be for delivery of supplies to MHPS, Banswara on F.O.R. MHPS- Central Stores basis with clear demarcation of the following:i. Basic Rate ii. GST, iii. Packing & Forwarding charges and GST on Packing & Forwarding charges,iv. Freight charges and GST on freight charges, v. Insurance and GST on Insurance charges, 2. L1 will be decided on the Lump-sum Basis. NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER NUMBER TEXT TEXT # NUMBER # TEXT# TEXT # NUMBER # NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER NUMBER TEXT TEXT NUMBER NUMBER NUMBER # NUMBER # TEXT TEXT NUMBER # NUMBER # DATE NUMBER # NUMBER # TEXT # S. No. Item Description Item Code / Make Quantity Units Estimated Rate inRs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC UNIT RATE in Rs. P. Basic Amount in Rs. P. Packing and Forwarding Chargesin percentage (%) Packing and Forwarding Charges in Rs. P. Basic Amount inclusive of Packing and Forwarding chargesin Rs. P. GST on (Basic Amount + Packing and Forwarding charges ) in percentage (%) GST on (Basic Amount + Packing and Forwarding ) in Rs. P. Freight Charges in percentage (%) GST on Freight Charges in percentage (%) Freight Charges including GST in Rs. P. Insurance Charges in percentage (%) GST on insurance Charges in percentage (%) Insurane Charges including GST in Rs. P. OTHER TAXES AND DUTIES, if any for entire Quantity (Levied byCentral/State/Local Governments on Final Product) in Rs, HSN / SAC Code TOTAL AMOUNT excluding taxes inRs. P TOTAL AMOUNT With Taxes18=(9+11+14+17) inRs. P. TOTAL AMOUNT In Words |
| 2 | Supply and ETC of standalone dual solar street light (2x 30 Watt) mounted on 6 Meter GI Pole with cross arms including RCC foundation work (As per scope of work and technical specifications as in mentioned at part A 2 iii b) |
| 3 | Supply and ETC of standalone solar powered surveillance system, combo camera using 4G sim based connectivity for live monitoring with mounting accessories for installation on above mentioned GI Pole (As per scope of work and technical specifications as in mentioned at part A 2 iii b ) Total in Figures 0.0 0.0 INR Zero Only 4.0 Construction of chamber for 100mm sluice plates item5 10.0 Nos Quoted Rate in Figures Select % 0.0 0.0 Zero Only Quoted Rate in Words INR Zero Only Please Enable Macros to View BoQ information |
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedCorrigendum-1 Issued
Clarifications on tender conditions and amendments issued.
CompletedCorrigendum-2 Issued
Clarifications on tender conditions and amendments issued.
Upcoming · 8 daysBid Submission Deadline
Online submission via eProcurement portal.
Upcoming · 8 daysBid Opening Date
Technical bids will be opened and evaluated.
Upcoming · 9 daysTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender